Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit Details

Status:
Needs Resubmittal
Type:
Commercial Building
Apply Date:
07/12/2018
Applicant:
Richard Wiehe
Description:
TI: SHELL

Permit Reviews

Permit Number - T18CM05456
Permit Status: Needs resubmittal
Permit Description: TI: SHELL
Start Date Submittal Complete Date Status  
01/09/2019 REVISION - - 1ST 01/09/2019 COMPLETED Review Details
07/12/2018 PLANS OK TO SUBMIT - COMM 07/26/2018 COMPLETED Review Details
07/26/2018 COMMERCIAL - TI 09/05/2018 COMPLETED Review Details
09/05/2018 RESUBMITTAL 10/03/2018 COMPLETED Review Details
09/18/2018 RESUBMITTAL 10/02/2018 COMPLETED Review Details
09/24/2021 REVISION - - 2ND 10/21/2021 COMPLETED Review Details
10/02/2018 RESUBMITTAL 10/11/2018 COMPLETED Review Details
10/11/2018 RESUBMITTAL 10/25/2018 COMPLETED Review Details
10/26/2021 RESUBMITTAL 11/08/2021 COMPLETED Review Details
11/10/2021 REVISION - - 2ND 11/15/2021 COMPLETED Review Details
08/04/2023 COMMERCIAL REVIEW - FULL v.1 09/07/2023 REQUIRES RESUBMIT Review Details

Outstanding Activity Conditions

Permit Number - T18CM05456
Permit Status: Needs resubmittal
Permit Description: TI: SHELL
Total Outstanding Activity Conditions - 8
Date Name
07/12/2018 PLANS EXPIRE IN 180 DAYS FROM DATE OF SUBMITTAL. PERMITS EXPIRE IN 180 DAYS FROM DATE OF ISSUE OR LAST INSPECTION.
08/07/2018 SPECIAL INSPECTION FORMS AND REPORTS REQUIRED PRIOR TO ISSUANCE OF A CERTIFICATE OF OCCUPANCY.
08/07/2018 SPECIAL INSPECTION FOR CONCRETE IS REQUIRED..
08/07/2018 SPECIAL INSPECTION FOR REINFORCING STEEL AND/OR PRE-STRESSING TENDONS IS REQUIRED.
08/07/2018 SPECIAL INSPECTION FOR HIGH STRENGTH BOLTING IS REQUIRED.
08/07/2018 SPECIAL INSPECTION FOR FIELD WELDING IS REQUIRED.
08/07/2018 SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED.
08/07/2018 SPECIAL INSPECTION FOR EXPANSION ANCHORS IS REQUIRED.

Outstanding Inspections

Permit Status: Needs Resubmittal
Permit Number: T18CM05456
Permite Description: TI: SHELL
Total Outstanding Inspections - 6
Last Inspection Date Description Inspector Results Comments
03/26/2019 COT - LCEL - Construction Power N/A Canceled {Activity date: 03/26/2019; Status: Not Applicable; Inspector: MHASSAN; Comment: Entered by CBELL1 - }
08/09/2023 COT - LCBU - Sustainability N/A Not Applicable Not required for this project.
08/09/2023 COT - LCBU - Building Final N/A Partial Pass 8/9/23: Partial Pass need water test and air balance test before Certificate of Occupancy can be issued. Site Engineering has been passed. Fire Department gave a partial pass, contractor working on fixing the fire department correction notice. Health department needs to inspect kitchen and bar areas before C of O can be finalized.
08/09/2023 COT - LCME - Mechanical Final N/A Re-inspection required Mechanical contractor is to perform air balancing today and general will submit once they have the results.
COT - FCON - Sprinkler - Final N/A Not Ready
08/15/2023 COT - FCON - Fire - Final N/A Partial Pass Building #1: Address, sprinkler coverage for under (4) roll-up doors on east wall, panel schedule, occupant load sign, EM lights in basement, Exit signs on north and west doors replaced with blank, sign above south exit door "This door to remain unlocked while space is occupied".

Completed Inspections

Permit Status: Needs Resubmittal
Permit Number: T18CM05456
Permit Description: TI: SHELL
Total Completed Inspections - 33
Date Description Inspector Results Comments
03/26/2019 COT - LCBU - Building Progress Passed {Activity date: 03/26/2019; Status: Approved; Inspector: MHASSAN; Comment: Entered by CBELL1 - }
08/09/2023 COT - LCME - Mechanical Intermediate Passed
08/09/2023 COT - LCBU - Stem Wall/Retaining Wall Passed
08/09/2023 COT - HCBU - Exterior Clips/Sheathing Passed
08/09/2023 COT - LCEL - Electrical Above Ceiling Passed
08/09/2023 COT - LCPL - Plumbing Roof Drains Passed
08/09/2023 COT - LCBU - Building Above Ceiling Passed
08/09/2023 COT - LCPL - Rough Soil Passed
08/09/2023 COT - LCPL - Yard Water Line Passed
08/09/2023 COT - LCBU - Roof Nailing Passed
08/09/2023 COT - LCEL - Electrical Final Passed Electrical is complete and operational.
08/09/2023 COT - LCEL - Temporary Service Passed
08/09/2023 COT - LCBU - Firewall/Fire Barrier/Firestop Passed
08/09/2023 COT - LCEL - Electrical Intermediate Passed
08/09/2023 COT - LCPL - Plumbing Intermediate Passed
08/09/2023 COT - LCPL - Backwater Valve Passed
08/09/2023 COT - LCBU - Excavation/Rebar/Zoning Passed
08/09/2023 COT - LCEL - Grounding/Bonding Passed
08/09/2023 COT - LCEL - Electrical Underground Passed
08/09/2023 COT - LCBU - Preslab Passed
08/09/2023 COT - LCBU - Exterior Clips/Sheathing Passed
08/09/2023 COT - LCPL - Plumbing Final Passed Restrooms are fully operational and meet ADA requirements/standards for accessibility.
08/09/2023 COT - LCEL - Outdoor Lighting Passed
08/09/2023 COT - LCPL - Sewer Passed
08/09/2023 COT - HCBU - Interior Shear Bracing Passed
08/09/2023 COT - LCEL - Electrical Progress Passed Electrical panels are properly labeled < outlets and lights are installed.
08/09/2023 ENGR Engineering Final Passed
08/09/2023 COT - LCBU - Framing Passed
08/15/2023 COT - FCON - Alarm - Final Passed
08/21/2023 COT - LCBU - Building Final Passed
08/21/2023 COT - LCME - Mechanical Final Passed
08/22/2023 COT - FCON - Sprinkler - Final Passed
08/22/2023 COT - FCON - Fire - Final Passed

Documents

File Name Document Type  
CONS-7_PLANSET_V1.PDF DOCUMENTS VIEW
CORBETT SHELL TEST AND BALANCE REPORT_V1.PDF DOCUMENTS VIEW
APPLICATION.PDF DOCUMENTS VIEW
CONTRACTOR IDENTIFICATION LETTER - CORBETT PROJECTS 2022-06-22 - UPLOADED FILE TYPE OTHER; OTHER 1; 1.PDF DOCUMENTS VIEW
JOB CARD.PDF DOCUMENTS VIEW
LOAD CALCS.PDF DOCUMENTS VIEW
NOTICE OF CONTRACTOR CHANGE TO SUNDT 2022-06-22 - UPLOADED FILE TYPE OTHER; OTHER 1; 1.PDF DOCUMENTS VIEW
PERMIT.PDF DOCUMENTS VIEW
PLAN SET REV2.PDF DOCUMENTS VIEW
REVISION NARRATIVE.PDF DOCUMENTS VIEW
001_COVER SHEET.TIF CONSTRPLANS VIEW
002_A0.1.TIF CONSTRPLANS VIEW
003_A0.2.TIF CONSTRPLANS VIEW
004_A0.3.TIF CONSTRPLANS VIEW
005_A0.4.TIF CONSTRPLANS VIEW
006_A0.5.TIF CONSTRPLANS VIEW
007_A2.0.TIF CONSTRPLANS VIEW
008_A2.1.TIF CONSTRPLANS VIEW
009_A2.2.TIF CONSTRPLANS VIEW
010_A2.3.TIF CONSTRPLANS VIEW
011_A2.4.TIF CONSTRPLANS VIEW
012_A3.0.TIF CONSTRPLANS VIEW
013_A3.1.TIF CONSTRPLANS VIEW
014_A3.2.TIF CONSTRPLANS VIEW
015_A3.3.TIF CONSTRPLANS VIEW
016_A3.4.TIF CONSTRPLANS VIEW
017_A3.5.TIF CONSTRPLANS VIEW
018_A3.6.TIF CONSTRPLANS VIEW
019_A3.7.TIF CONSTRPLANS VIEW
020_A3.8.TIF CONSTRPLANS VIEW
021_A4.0.TIF CONSTRPLANS VIEW
022_A4.1.TIF CONSTRPLANS VIEW
023_A5.0.TIF CONSTRPLANS VIEW
024_A6.0.TIF CONSTRPLANS VIEW
025_A6.1.TIF CONSTRPLANS VIEW
026_A7.0.TIF CONSTRPLANS VIEW
027_A7.1.TIF CONSTRPLANS VIEW
028_A9.0.TIF CONSTRPLANS VIEW
029_A9.1.TIF CONSTRPLANS VIEW
030_S1.0.TIF CONSTRPLANS VIEW
031_S1.1.TIF CONSTRPLANS VIEW
032_S1.2.TIF CONSTRPLANS VIEW
033_S1.3.TIF CONSTRPLANS VIEW
034_S2.0.TIF CONSTRPLANS VIEW
035_S2.1.TIF CONSTRPLANS VIEW
036_S2.2.TIF CONSTRPLANS VIEW
016_S2.3.TIF CONSTRPLANS VIEW
037_S3.0.TIF CONSTRPLANS VIEW
038_S4.0.TIF CONSTRPLANS VIEW
039_S4.1.TIF CONSTRPLANS VIEW
040_DM1.1.TIF CONSTRPLANS VIEW
041_DM1.2.TIF CONSTRPLANS VIEW
042_DM3.1.TIF CONSTRPLANS VIEW
043_DM3.2.TIF CONSTRPLANS VIEW
044_M1.1.TIF CONSTRPLANS VIEW
045_M1.2.TIF CONSTRPLANS VIEW
046_M1.3.TIF CONSTRPLANS VIEW
047_M3.1.TIF CONSTRPLANS VIEW
048_M3.2.TIF CONSTRPLANS VIEW
049_M3.3.TIF CONSTRPLANS VIEW
050_M9.1.TIF CONSTRPLANS VIEW
051_M9.2.TIF CONSTRPLANS VIEW
052_E0.1.TIF CONSTRPLANS VIEW
053_E1.1.TIF CONSTRPLANS VIEW
054_E1.2.TIF CONSTRPLANS VIEW
055_E1.3.TIF CONSTRPLANS VIEW
056_E2.1.TIF CONSTRPLANS VIEW
None DOCUMENTS VIEW