Permit Details

Status:
C of o
Type:
SINGLE FAMILY NEW
Address NEW:
2615 S MISSION RD #2
Apply Date:
06/01/2018
Applicant:
TROY WILLIAMS
Description:
NEW SFR

Permit Reviews

Permit Number - T18CM04291
Permit Status: C of o
Permit Description: NEW SFR
Start Date Submittal Complete Date Status  
03/06/2019 REVISION - - 2ND 03/06/2019 COMPLETED Review Details
06/01/2018 PLANS OK TO SUBMIT - RES 06/15/2018 COMPLETED Review Details
06/15/2018 RESIDENTIAL - BLDG/ZONING/ENGINE/NPPO 07/09/2018 COMPLETED Review Details
07/17/2018 RESIDENTIAL - BLDG/ZONING-WALKTHRU 07/24/2018 COMPLETED Review Details
12/18/2018 REVISION - - 1ST 12/18/2018 COMPLETED Review Details

Outstanding Activity Conditions

Permit Number - T18CM04291
Permit Status: C of o
Permit Description: NEW SFR
Total Outstanding Activity Conditions - 1
Date Name
06/01/2018 PLANS EXPIRE IN 180 DAYS FROM DATE OF SUBMITTAL. PERMITS EXPIRE IN 180 DAYS FROM DATE OF ISSUE OR LAST INSPECTION.

Completed Inspections

Permit Status: C of o
Permit Number: T18CM04291
Permit Description: NEW SFR
Total Completed Inspections - 25
Date Description Inspector Results Comments
07/17/2018 MECHANICAL - INTERMEDIATE KEN Approved MANUAL J REPORT REQUIRED BEFORE INSPECTION
12/28/2018 BUILDING PRE-SLAB MHASSAN Approved need plumbing rough soil completed
12/28/2018 ELECTRIC - UFER MHASSAN Approved not installed
12/28/2018 EXCAVATION/LAYOUT REBAR & ZON MHASSAN Approved only need to see porch footings
01/07/2019 PLUMBING - SEWER HCS CONNECT MHASSAN Approved
01/11/2019 PLUMBING - ROUGH, SOIL DMCCARTHY Approved
01/30/2019 ROOF NAILING MHASSAN Approved
01/30/2019 EXT METAL CLIPS/EXT SHEATHING MHASSAN Approved
02/26/2019 STUCCO MESH MHASSAN Approved
03/11/2019 ELECTRIC - INTERMEDIATE MHASSAN Approved
03/13/2019 PLUMBING - INTERMEDIATE MHASSAN Approved
06/04/2019 PLUMBING - YARD WTR LINE/TEST MRAMBER Approved pipe PVC per plan or revise plans. Plan calls for 3/4 to 1 1/2" with a T going to house number 1 before continuing to house number 2. Currently it is piped with two separate 1 1/4" from tee at meter.
07/23/2019 TEP CLEARANCE - PM TVALENCIA Approved CODE ECO
07/23/2019 ELECTRIC - CONSTRUCTION POWER TVALENCIA Approved Clear electric eco
09/17/2019 GAS CLEARANCE TVALENCIA Approved
09/17/2019 PLUMBING - GAS PRESSURE TEST TVALENCIA Approved Clear gas meter
10/02/2019 REINFORCED MASONRY PRE-GROUT TVALENCIA Approved
10/02/2019 MECHANICAL - FINAL TVALENCIA Approved
10/02/2019 PLUMBING - FINAL TVALENCIA Approved
10/02/2019 OUTDOOR LIGHTING FINAL TVALENCIA Approved
10/02/2019 ELECTRIC - FINAL TVALENCIA Approved
10/02/2019 ELECTRIC - UNDERGROUND TVALENCIA Approved
10/02/2019 FRAMING TVALENCIA Approved
10/03/2019 BUILDING - FINAL TVALENCIA Approved ZONING FINAL APPROVED
10/03/2019 ZONING - FINAL AH Approved No longer applicable. enough parking spaces are on site for the number of rooms in the R-1 zone.

Documents

File Name Document Type  
None CERT OF OCC VIEW
001_SITE PLAN 1.TIF CONSTRPLANS VIEW
002_FLOOR DIMENSION.TIF CONSTRPLANS VIEW
003_FOUNDATION ROOF FRAMING .TIF CONSTRPLANS VIEW
004_DETAILS / SECTION.TIF CONSTRPLANS VIEW
005_BUILDING ELEVATION.TIF CONSTRPLANS VIEW
006_SHEAR WALL ROOF PLAN.TIF CONSTRPLANS VIEW
007_ ELECTRICAL / MECHANICAL.TIF CONSTRPLANS VIEW
008_SUPPLY WASTE.TIF CONSTRPLANS VIEW
None CONSTRPLANS VIEW
None DOCUMENTS VIEW