Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Inspection History Details
Inspection Status: Approved
Inspection History: MECHANICAL - INTERMEDIATE
Permit Number - T18CM04291
Inspection Description - MECHANICAL - INTERMEDIATE
Inspection Status - Approved
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 03/11/2019 | MECHANICAL - INTERMEDIATE | Approved | ||
| 03/08/2019 | MECHANICAL - INTERMEDIATE | Partial Approval | Provide future solar water heater, home inclusive at entry, provide a home inclusive blocking one bathroom, nail protect homeruns, bond like gas line, mail protect dryer vent, no test DWB potable water OK, Provide manual J calculations | |
| 02/26/2019 | MECHANICAL - INTERMEDIATE | Partial Approval | supplies need blocking on three sides. Mechanical system is no longer per plan. Either revise plans or build per plan. B venting needs to be roughed in. | |
| 07/17/2018 | MECHANICAL - INTERMEDIATE | Prior to Intermediates | MANUAL J REPORT REQUIRED BEFORE INSPECTION |