Permit: T17CM09029
Permit Details
Status:
Issued
Type:
Residential Building - One or Two Family
Address:
4861 E HAMPTON ST
Address NEW:
4861 E HAMPTON ST
Apply Date:
12/07/2017
Applicant:
Description:
ADD BEDROOM AND BATHROOM
Permit Reviews
Permit Number - T17CM09029
Permit Status: Issued
Permit Description: ADD BEDROOM AND BATHROOM
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 07/05/2018 | REVISION - - 1ST | 07/05/2018 | COMPLETED |
| 12/07/2017 | RESIDENTIAL - BLDG/ZONING-WALKTHRU | 12/14/2017 | COMPLETED |
Outstanding Activity Conditions
Permit Number - T17CM09029
Permit Status: Issued
Permit Description: ADD BEDROOM AND BATHROOM
Total Outstanding Activity Conditions - 1
| Date | Name |
|---|---|
| 12/07/2017 | PLANS EXPIRE IN 180 DAYS FROM DATE OF SUBMITTAL. PERMITS EXPIRE IN 180 DAYS FROM DATE OF ISSUE OR LAST INSPECTION. |
Outstanding Inspections
Permit Status: Issued
Permit Number: T17CM09029
Permite Description: ADD BEDROOM AND BATHROOM
Total Outstanding Inspections - 7
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 10/27/2022 | COT - RSME - Mechanical Final | N/A | Not Ready | |
| 10/27/2022 | RSBU - Building Final | N/A | Not Ready | |
| 10/27/2022 | COT - RSEL - Outdoor Lighting | N/A | Not Ready | |
| 10/27/2022 | COT - RSPL - Plumbing Final | N/A | Not Ready | |
| 10/27/2022 | RSME - Mechanical Progress | N/A | Not Ready | |
| 10/27/2022 | COT - RSEL - Electrical Final | N/A | Not Ready | |
| 10/26/2022 | COT - RSPL - Rough Soil | N/A | Not Ready |
Completed Inspections
Permit Status: Issued
Permit Number: T17CM09029
Permit Description: ADD BEDROOM AND BATHROOM
Total Completed Inspections - 12
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 03/08/2018 | COT - RSBU - Preslab | Passed | {Activity date: 03/08/2018; Status: Approved; Inspector: MHASSAN1; Comment: Entered by MHASSAN1 - } ; {Activity date: 03/07/2018; Status: Not ready for Inspection; Inspector: MHASSAN1; Comment: Entered by MHASSAN1 - REBAR NEEDS TO BE PER DETAIL 1 ON PAGE 5} | |
| 06/22/2018 | COT - RSBU - Roof Nailing | Passed | {Activity date: 06/22/2018; Status: Approved; Inspector: DFLORES2; Comment: Entered by DFLORES2 - } ; {Activity date: 06/20/2018; Status: Correction Required; Inspector: GWest; Comment: Entered by GWEST2 - Roof nailing. Staples require 4" OC nailing on all edges. You have not had your roof covered and there are lifted OSB sheathing edges and cupped field areas. OSB Sheathing should be flat, not concave or convex with flat edges that align with the next repetitive sheat of OSB. Replace all damaged OSB Sheats that are damaged due to the aforementioned criteria.} ; {Activity date: 06/14/2018; Status: Denied; Inspector: DFLORES2; Comment: Entered by DFLORES2 - 1 TAKE OUT SHINNERS ON SHEAR WALL AND RE NAIL WALL CORRECTLY ROOF PEREMETER NEEDS STAPLES EVERY 4" PER CODE} |
|
| 07/11/2018 | COT - LCBU - Framing | Passed | {Activity date: 07/11/2018; Status: Approved; Inspector: TVALENC1; Comment: Entered by TVALENC1 - IVRS - Inspection :*} ; {Activity date: 07/06/2018; Status: Denied; Inspector: dflores2; Comment: Entered by DFLORES2 - LOOSE BOLTS ON TOE PLATE MISSING NAILS ON SHEER WALL AT ENTRANCE} ; {Activity date: 06/20/2018; Status: Correction Required; Inspector: GWest; Comment: Entered by GWEST2 - Framing is not complete. Window changes or window elimination. Light and ventilation is required for living areas at 8% Light and 4% vVentilation. Make sure your egress window rough opening will comly with egress window standards. Anchor bolting and shot pins for interior and exterior wall shall be installed for framing inspection. Install any missing drywall backing at top plate. Install all missing nails required at Rafter/Joist hangeres. Bolt and attach the new wood framed addition walls to the existing masonry structure with approved attachment hardware and methods. Finish all previous corrections. Recall this inspection once again when all corrections have been made and the structure is ready for re-inspection. There may be other/further corrections upon re-inspection } ; {Activity date: 06/14/2018; Status: Denied; Inspector: DFLORES2; Comment: Entered by DFLORES2 - 1 TAKE OUT SHINNERS ON SHEAR WALL AND RE NAIL WALL CORRECTLY ROOF PEREMETER NEEDS STAPLES EVERY 4" PER CODE} |
|
| 08/07/2018 | COT - RSBU - Exterior/Interior Clips/Sheathing/Framing | Passed | {Activity date: 08/07/2018; Status: Approved; Inspector: DFLORES2; Comment: Entered by DFLORES2 - } | |
| 08/07/2018 | COT - RSBU - Sustainability | Passed | {Activity date: 08/07/2018; Status: Approved; Inspector: DFLORES2; Comment: Entered by DFLORES2 - } | |
| 08/07/2018 | COT - RSBU - Excavation/Rebar/Zoning | Passed | {Activity date: 08/07/2018; Status: Approved; Inspector: DFLORES2; Comment: Entered by DFLORES2 - } ; {Activity date: 03/08/2018; Status: Approved; Inspector: MHASSAN1; Comment: Entered by MHASSAN1 - } ; {Activity date: 03/07/2018; Status: Not ready for Inspection; Inspector: MHASSAN1; Comment: Entered by MHASSAN1 - REBAR NEEDS TO BE PER DETAIL 1 ON PAGE 5} | |
| 09/20/2019 | COT - LCPL - Plumbing Intermediate | Passed | {Activity date: 09/20/2019; Status: Approved; Inspector: BSTEVENS; Comment: Entered by BSTEVENS - (rvi)} ; {Activity date: 09/18/2019; Status: Not ready for Inspection; Inspector: RCHANDLER; Comment: Entered by DMERANZ1 - Unable to access for inspection. If this inspection does not pass next time, a re-inspection fee will be assessed. House appears to be occupied. Knocked on door at 10:13 AM, with no answer. Note: This inspection is a good candidate for remote inspection.} | |
| 10/18/2022 | PDSD Building Division - TEP PMÂ Clearance | Passed | {Activity date: 10/18/2022; Status: Approved; Inspector: DQUINN; Comment: Entered by NGARCIA3 - CODE INCR/CUTOVER} | |
| 10/18/2022 | COT - BULD - SWG Clearance | Passed | {Activity date: 10/18/2022; Status: Approved; Inspector: DQUINN; Comment: Entered by NGARCIA3 - CODE GAS} | |
| 10/18/2022 | COT - RSEL - Service Upgrade | Passed | {Activity date: 10/18/2022; Status: Approved; Inspector: DQUINN; Comment: Entered by NGARCIA3 - Ap} | |
| 10/18/2022 | COT - RSPL - Gas Pressure Test | Passed | {Activity date: 10/18/2022; Status: Approved; Inspector: DQUINN; Comment: Entered by NGARCIA3 - Ap Clear incr for cutover Clear gas} |
|
| 04/13/2023 | RSEL - Electrical Progress | Passed |