Inspection Status: Passed
Inspection History: COT - LCBU - Framing
| Date |
Description |
Inspector |
Results |
Comments |
| 07/11/2018 |
COT - LCBU - Framing |
TVALENC1 |
Approved |
Entered by TVALENC1 - IVRS - Inspection :* |
| 07/06/2018 |
COT - LCBU - Framing |
dflores2 |
Denied |
Entered by DFLORES2 - LOOSE BOLTS ON TOE PLATE MISSING NAILS ON SHEER WALL AT ENTRANCE |
| 06/20/2018 |
COT - LCBU - Framing |
GWest |
Correction Required |
Entered by GWEST2 - Framing is not complete. Window changes or window elimination. Light and ventilation is required for living areas at 8% Light and 4% vVentilation. Make sure your egress window rough opening will comly with egress window standards. Anchor bolting and shot pins for interior and exterior wall shall be installed for framing inspection. Install any missing drywall backing at top plate. Install all missing nails required at Rafter/Joist hangeres. Bolt and attach the new wood framed addition walls to the existing masonry structure with approved attachment hardware and methods. Finish all previous corrections. Recall this inspection once again when all corrections have been made and the structure is ready for re-inspection. There may be other/further corrections upon re-inspection
|
| 06/14/2018 |
COT - LCBU - Framing |
DFLORES2 |
Denied |
Entered by DFLORES2 - 1 TAKE OUT SHINNERS ON SHEAR WALL AND RE NAIL WALL CORRECTLY
ROOF PEREMETER NEEDS STAPLES EVERY 4" PER CODE |