Permit Number - T17CM08233
Permit Status: Complete
Permit Description: SHELL ADDITION
Start Date Submittal Complete Date Status  
05/07/2018 POST 3RD PARTY REVIEW 07/05/2018 COMPLETED Review Details
11/03/2017 PLANS OK TO SUBMIT - COMM 11/03/2017 COMPLETED Review Details
11/06/2017 3RD PARTY REVIEW - COMMERCIAL 05/07/2018 COMPLETED Review Details

Conditions

Permit Number - T17CM08233
Permit Status: Complete
Permit Description: SHELL ADDITION
Date Description Comments
11/03/2017 PLANS EXPIRE IN 180 DAYS FROM DATE OF SUBMITTAL. PERMITS EXPIRE IN 180 DAYS FROM DATE OF ISSUE OR LAST INSPECTION.
02/15/2018 SPECIAL INSPECTION FOR STRUCTURAL WELDING IS REQUIRED.
03/04/2020 SPECIAL INSPECTION FOR FIELD WELDING IS REQUIRED.
02/15/2018 SPECIAL INSPECTION FOR SPECIAL GRADING, EXCAVATION AND FILLING IS REQUIRED.
02/15/2018 SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED.

Outstanding Inspections

Permit Status: Complete
Permit Number: T17CM08233
Permite Description: SHELL ADDITION
Total Outstanding Inspections - 1
Last Inspection Date Description Inspector Results Comments
02/09/2022 COT - LCEL - Electrical Underground N/A Canceled {Activity date: 02/09/2022; Status: Not Applicable; Inspector: ESTEVENS; Comment: Entered by VVERA1 - N/A}

Completed Inspections

Permit Status: Complete
Permit Number: T17CM08233
Permit Description: SHELL ADDITION
Total Completed Inspections - 16
Date Description Inspector Results Comments
11/28/2018 COT - LCBU - Roof Nailing Passed {Activity date: 11/28/2018; Status: Approved; Inspector: RCHANDLER; Comment: Entered by CBELL1 - }
12/05/2018 COT - LCBU - Exterior Clips/Sheathing Passed {Activity date: 12/05/2018; Status: Approved; Inspector: RCHANDLER; Comment: Entered by CBELL1 - } ; {Activity date: 11/05/2018; Status: Not ready for Inspection; Inspector: BJONES; Comment: Entered by CBELL1 - partial inspection of plywood on north side of building}
12/10/2018 COT - LCBU - Framing Passed {Activity date: 12/10/2018; Status: Approved; Inspector: GWEST; Comment: Entered by CBELL1 - Ext walls and interior stairs} ; {Activity date: 12/07/2018; Status: Not ready for Inspection; Inspector: BJONES; Comment: Entered by CBELL1 - No access gate locked at 1pm} ; {Activity date: 12/05/2018; Status: Correction Required; Inspector: RCHANDLER; Comment: Entered by CBELL1 - 1-Install all hold downs.
2-Complete Stairs.} ; {Activity date: 11/05/2018; Status: Not ready for Inspection; Inspector: BJONES; Comment: Entered by CBELL1 - hangar inspections per second floor joists to mid span. Picked up special inspection sheets for welding and high-strength Bolting} ; {Activity date: 10/30/2018; Status: Partial Approval; Inspector: MRAMBER; Comment: Entered by CBELL1 - Provide S.I. report on structural steel.}
03/11/2019 COT - HCBU - Interior Shear Bracing Passed {Activity date: 03/11/2019; Status: Approved; Inspector: DQUINN; Comment: Entered by CBELL1 - }
07/15/2019 COT - LCBU - Building Above Ceiling Passed {Activity date: 07/15/2019; Status: Approved; Inspector: GWEST; Comment: Entered by DMERANZ1 - }
10/01/2019 PDSD Site/Engineering Division - NPPO Passed {Activity date: 10/01/2019; Status: Approved; Inspector: RLEDONNE; Comment: Entered by DMERANZ1 - }
10/01/2019 PDSD Building Division - Sign Final Passed {Activity date: 10/01/2019; Status: Approved; Inspector: RLEDONNE; Comment: Entered by DMERANZ1 - }
11/13/2019 TRSP - ROW - Final/Close-Out Passed {Activity date: 11/13/2019; Status: Approved; Inspector: BMONG; Comment: Entered by BMONG1 - ALL WORK IN ROW IS COMPLETE AND MEETS STANDARDS}
07/21/2021 COT - LCBU - Excavation/Rebar/Zoning Passed {Activity date: 07/21/2021; Status: Approved; Inspector: RELEFANTE; Comment: Entered by RSALDAT1 - AP} ; {Activity date: 10/03/2019; Status: Partial Approval; Inspector: RCHANDLER; Comment: Entered by DMERANZ1 - Phase one.} ; {Activity date: 07/15/2019; Status: Partial Approval; Inspector: GWEST; Comment: Entered by DMERANZ1 - Perimeter Wall.
South site wall footings east half, OK to pour.} ; {Activity date: 07/09/2019; Status: Partial Approval; Inspector: DQUINN; Comment: Entered by DMERANZ1 - 240’ on east property line, north to south, ok to pour footing
} ; {Activity date: 04/23/2019; Status: Partial Approval; Inspector: GWEST; Comment: Entered by CBELL1 - Generator Pad and Trash Enclosure} ; {Activity date: 12/13/2018; Status: Partial Approval; Inspector: DMCCARTHY; Comment: Entered by CBELL1 - For generator pad footing , partially approved today because there’s more footing work on this permit in the future} ; {Activity date: 10/05/2018; Status: Partial Approval; Inspector: GWest; Comment: Entered by GWEST2 - Approved-Cat Scan Pad and elevated extractor washer pad} ; {Activity date: 09/28/2018; Status: Partial Approval; Inspector: GWest; Comment: Entered by GWEST2 - West footings connection} ; {Activity date: 09/26/2018; Status: Partial Approval; Inspector: BJONES; Comment: Entered by CMURPHY1 - interior footing north of elevator per plan

} ; {Activity date: 09/25/2018; Status: Partial Approval; Inspector: DFLORES; Comment: Entered by CMURPHY1 - OK TO POUR ELEVATOR SHAFT UP TO KEYWAY} ; {Activity date: 09/21/2018; Status: Partial Approval; Inspector: DFLORES; Comment: Entered by CMURPHY1 - OK TO POUR CONCRETE FOOTER IN ELEVATION BASIN, RECALL INSPECTION FOR FURTHER WORK THERE AFTER THANK YOU} ; {Activity date: 09/17/2018; Status: Partial Approval; Inspector: DQUINN; Comment: Entered by DQUINN1 - EAST STEP FOOTING OK TO POUR} ; {Activity date: 08/27/2018; Status: Partial Approval; Inspector: MHASSAN; Comment: Entered by VFLORES1 - all okay except elevator pit.} ; {Activity date: 08/23/2018; Status: Partial Approval; Inspector: GWest; Comment: Entered by GWEST2 - 38 Column base footings and steel and bolts}
02/09/2022 COT - LCBU - Preslab Passed {Activity date: 02/09/2022; Status: Approved; Inspector: ESTEVENS; Comment: Entered by VVERA1 - Approved} ; {Activity date: 10/08/2018; Status: Partial Approval; Inspector: GWest; Comment: Entered by GWEST2 - Ap-south end and footings for slab grade pour} ; {Activity date: 10/01/2018; Status: Partial Approval; Inspector: DQUINN; Comment: Entered by DQUINN1 - 7 EAST TO WEST COLUMNS - SLAB TO THE NORTH OK TO POUR.}
02/24/2022 PDSD Site/Engineering Division - Landscaping Passed {Activity date: 02/24/2022; Status: Approved; Inspector: DROBERTS; Comment: Entered by VVERA1 - IS APPROVED} ; {Activity date: 02/22/2022; Status: Continued; Inspector: MHERNANDEZ; Comment: Entered by VVERA1 - CN/CONTRACTOR IS RESCHEDULING INSPECTION.

} ; {Activity date: 12/04/2019; Status: Approved; Inspector: RLEDONNE; Comment: Entered by SFLORES2 - } ; {Activity date: 11/06/2019; Status: Not ready for Inspection; Inspector: RLEDONNE; Comment: Entered by DMERANZ1 - Complete all landscaping on approve plan.}
02/25/2022 COT - FCON - Fire - Final Passed {Activity date: 02/25/2022; Status: Approved; Inspector: wmotto1; Comment: Entered by WMOTTO1 - } ; {Activity date: 02/03/2020; Status: Approved; Inspector: MRoss; Comment: Entered by MROSS2 - }
06/02/2022 ENGR Engineering Final Passed {Activity date: 06/02/2022; Status: Approved; Inspector: DROBERTS; Comment: Entered by NGARCIA3 - APPROVED} ; {Activity date: 02/24/2022; Status: Partial Approval; Inspector: DROBERTS; Comment: Entered by VVERA1 - IS PARTIAL APPROVED, OK FOR TCO FOR EMPLOYEES PENDING APPROVAL OF ALL OTHER INSPECTIONS.
} ; {Activity date: 02/22/2022; Status: Continued; Inspector: MHERNANDEZ; Comment: Entered by VVERA1 - CN/ CONTRACTOR IS RESCHEDULING INSPECTION.} ; {Activity date: 02/10/2022; Status: Continued; Inspector: MHERNANDEZ; Comment: Entered by NGARCIA3 - CN/ NOT READY FOR FINAL.} ; {Activity date: 12/04/2019; Status: Partial Approval; Inspector: RLEDONNE; Comment: Entered by SFLORES2 - OK for TCO for new shell only.} ; {Activity date: 11/06/2019; Status: Not ready for Inspection; Inspector: RLEDONNE; Comment: Entered by DMERANZ1 - Complete all work on development package for site for final.}
06/06/2022 COT - LCBU - Masonry Pregrout Passed {Activity date: 06/06/2022; Status: Approved; Inspector: ARUIZ; Comment: Entered by ARUIZ1 - } ; {Activity date: 08/30/2019; Status: Partial Approval; Inspector: RCHANDLER; Comment: Entered by DMERANZ1 - Top out for site wall on phase one.} ; {Activity date: 08/29/2019; Status: Partial Approval; Inspector: RCHANDLER; Comment: Entered by YLEON1 - WORK HAS NOT BEEN FINISHED PER CLIENT.} ; {Activity date: 07/31/2019; Status: Approved; Inspector: RCHANDLER; Comment: Entered by DMERANZ1 - } ; {Activity date: 07/29/2019; Status: Partial Approval; Inspector: DQUINN; Comment: Entered by DMERANZ1 - Generator enclosure ok to grout to 6’.
} ; {Activity date: 05/08/2019; Status: Partial Approval; Inspector: GWEST; Comment: Entered by CBELL1 - Top out final lift for grout pour is approved
Line left open as 1 more enclosure to go.} ; {Activity date: 04/23/2019; Status: Partial Approval; Inspector: GWEST; Comment: Entered by CBELL1 - 8x8x4 split Block Veneer on Ext of building}
04/25/2023 COT - LCBU - Stem Wall/Retaining Wall Passed Stem wall on south end of parking lot
05/17/2023 COT - LCBU - Building Final Passed 5-17-23: Apply for Letter of Completion.

Documents

File Name Document Type  
LOFC_LETTEROFCOMPLETION.PDF DOCUMENTS VIEW
001_A0.1.TIF CONSTRPLANS VIEW
002_A0.2.TIF CONSTRPLANS VIEW
003_A1.0.TIF CONSTRPLANS VIEW
004_D1.0.TIF CONSTRPLANS VIEW
005_D2.1.TIF CONSTRPLANS VIEW
006_D2.2.TIF CONSTRPLANS VIEW
007_D2.3.TIF CONSTRPLANS VIEW
008_A2.1.TIF CONSTRPLANS VIEW
009_A2.2.TIF CONSTRPLANS VIEW
010_A2.3.TIF CONSTRPLANS VIEW
011_A4.0.TIF CONSTRPLANS VIEW
012_A5.0.TIF CONSTRPLANS VIEW
013_A5.1.TIF CONSTRPLANS VIEW
014_A6.0.TIF CONSTRPLANS VIEW
015_A6.1.TIF CONSTRPLANS VIEW
016_A6.2.TIF CONSTRPLANS VIEW
017_A7.0.TIF CONSTRPLANS VIEW
018_A7.1.TIF CONSTRPLANS VIEW
019_A8.0.TIF CONSTRPLANS VIEW
020_S0.1.TIF CONSTRPLANS VIEW
021_S1.1.TIF CONSTRPLANS VIEW
022_S2.1.TIF CONSTRPLANS VIEW
023_S2.2.TIF CONSTRPLANS VIEW
024_S3.1.TIF CONSTRPLANS VIEW
025_S3.2.TIF CONSTRPLANS VIEW
026_S4.1.TIF CONSTRPLANS VIEW
027_S4.2.TIF CONSTRPLANS VIEW
028_S4.3.TIF CONSTRPLANS VIEW
None DOCUMENTS VIEW
GEOTECH EVALUATION REPORT.PDF DOCUMENTS VIEW
None DOCUMENTS VIEW