Inspection Status: Passed
Inspection History: COT - LCBU - Framing
| Date |
Description |
Inspector |
Results |
Comments |
| 12/10/2018 |
COT - LCBU - Framing |
GWEST |
Approved |
Entered by CBELL1 - Ext walls and interior stairs |
| 12/07/2018 |
COT - LCBU - Framing |
BJONES |
Not ready for Inspection |
Entered by CBELL1 - No access gate locked at 1pm |
| 12/05/2018 |
COT - LCBU - Framing |
RCHANDLER |
Correction Required |
Entered by CBELL1 - 1-Install all hold downs.
2-Complete Stairs. |
| 11/05/2018 |
COT - LCBU - Framing |
BJONES |
Not ready for Inspection |
Entered by CBELL1 - hangar inspections per second floor joists to mid span. Picked up special inspection sheets for welding and high-strength Bolting |
| 10/30/2018 |
COT - LCBU - Framing |
MRAMBER |
Partial Approval |
Entered by CBELL1 - Provide S.I. report on structural steel. |