Inspection Status: Passed
Inspection History: COT - LCBU - Excavation/Rebar/Zoning
| Date |
Description |
Inspector |
Results |
Comments |
| 07/21/2021 |
COT - LCBU - Excavation/Rebar/Zoning |
RELEFANTE |
Approved |
Entered by RSALDAT1 - AP |
| 10/03/2019 |
COT - LCBU - Excavation/Rebar/Zoning |
RCHANDLER |
Partial Approval |
Entered by DMERANZ1 - Phase one. |
| 07/15/2019 |
COT - LCBU - Excavation/Rebar/Zoning |
GWEST |
Partial Approval |
Entered by DMERANZ1 - Perimeter Wall.
South site wall footings east half, OK to pour. |
| 07/09/2019 |
COT - LCBU - Excavation/Rebar/Zoning |
DQUINN |
Partial Approval |
Entered by DMERANZ1 - 240’ on east property line, north to south, ok to pour footing
|
| 04/23/2019 |
COT - LCBU - Excavation/Rebar/Zoning |
GWEST |
Partial Approval |
Entered by CBELL1 - Generator Pad and Trash Enclosure |
| 12/13/2018 |
COT - LCBU - Excavation/Rebar/Zoning |
DMCCARTHY |
Partial Approval |
Entered by CBELL1 - For generator pad footing , partially approved today because there’s more footing work on this permit in the future |
| 10/05/2018 |
COT - LCBU - Excavation/Rebar/Zoning |
GWest |
Partial Approval |
Entered by GWEST2 - Approved-Cat Scan Pad and elevated extractor washer pad |
| 09/28/2018 |
COT - LCBU - Excavation/Rebar/Zoning |
GWest |
Partial Approval |
Entered by GWEST2 - West footings connection |
| 09/26/2018 |
COT - LCBU - Excavation/Rebar/Zoning |
BJONES |
Partial Approval |
Entered by CMURPHY1 - interior footing north of elevator per plan
|
| 09/25/2018 |
COT - LCBU - Excavation/Rebar/Zoning |
DFLORES |
Partial Approval |
Entered by CMURPHY1 - OK TO POUR ELEVATOR SHAFT UP TO KEYWAY |
| 09/21/2018 |
COT - LCBU - Excavation/Rebar/Zoning |
DFLORES |
Partial Approval |
Entered by CMURPHY1 - OK TO POUR CONCRETE FOOTER IN ELEVATION BASIN, RECALL INSPECTION FOR FURTHER WORK THERE AFTER THANK YOU |
| 09/17/2018 |
COT - LCBU - Excavation/Rebar/Zoning |
DQUINN |
Partial Approval |
Entered by DQUINN1 - EAST STEP FOOTING OK TO POUR |
| 08/27/2018 |
COT - LCBU - Excavation/Rebar/Zoning |
MHASSAN |
Partial Approval |
Entered by VFLORES1 - all okay except elevator pit. |
| 08/23/2018 |
COT - LCBU - Excavation/Rebar/Zoning |
GWest |
Partial Approval |
Entered by GWEST2 - 38 Column base footings and steel and bolts |