Permit: T17CM07617
Permit Details
Status:
C of o
Type:
COMMERCIAL ALTERATION
Address:
8321 E BROADWAY BL
Address NEW:
8321 E BROADWAY BL
Apply Date:
10/09/2017
Applicant:
JOHN KRANIS
Description:
TI: RESTAURANT
Architects:
- FIELDS, JAMES SLOAN
Contractors:
- MEAD MEYER CONSTRUCTION INC
Permit Reviews
Permit Number - T17CM07617
Permit Status: C of o
Permit Description: TI: RESTAURANT
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 10/09/2017 | COMMERCIAL - TI | 10/17/2017 | COMPLETED |
| 10/17/2017 | RESUBMITTAL | 10/17/2017 | COMPLETED |
| 10/31/2018 | REVISION - - 1ST | 10/31/2018 | COMPLETED |
Outstanding Activity Conditions
Permit Number - T17CM07617
Permit Status: C of o
Permit Description: TI: RESTAURANT
Total Outstanding Activity Conditions - 1
| Date | Name |
|---|---|
| 10/09/2017 | PLANS EXPIRE IN 180 DAYS FROM DATE OF SUBMITTAL. PERMITS EXPIRE IN 180 DAYS FROM DATE OF ISSUE OR LAST INSPECTION. |
Completed Inspections
Permit Status: C of o
Permit Number: T17CM07617
Permit Description: TI: RESTAURANT
Total Completed Inspections - 29
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 11/17/2017 | PLUMBING - ROUGH, SOIL | DQUINN | Approved | ALL OK EXCEPT GREASE TRAP NR |
| 12/22/2017 | MECHANICAL - HOODS | RGREENE1 | Approved | SMOKE TEST COMPLETE OK FOR FIRST LAYER |
| 12/22/2017 | FRAMING | RGREENE1 | Approved | PLAN IS CALLING FOR A TWO HOUR RATED SEPERATION WALL HOWEVER THAT IS NOT WHAT HAS BEEN CONSTRUCTED. THE BUILDING IS VB CONSTRUCTION AND IS UNDER THE ALLOWABLE AREA TO CONSIDERED THE TWO SUITES NON-SEPERATED USE. RECOMMENDED THE APPLICANT SUBMITS A REVISION TO ELIMINATE THE FIREWALL WITH THE ACCEPTANCE FROM THE ARCHITECT. |
| 12/22/2017 | PLUMBING - INTERMEDIATE | RGREENE1 | Approved | GREASE TRAP OKAY TO COVER/ LEAVE PLUMBING OPEN AS VENTS ARE NOT COMPLETE. |
| 12/22/2017 | ELECTRIC - INTERMEDIATE | RGREENE1 | Approved | OKAY WITH THE EXCEPTION OF THE RATED ASSEMBLY. |
| 05/09/2018 | SHEET ROCK NAILING | TVALENC1 | Approved | IVRS - Inspection :* |
| 09/10/2018 | PLUMBING - GAS PRESSURE TEST | GWest | Approved | SW Gas Clearance = Reconnect, Done! |
| 09/11/2018 | GAS CLEARANCE | GWEST | Approved | |
| 09/18/2018 | EXT METAL CLIPS/EXT SHEATHING | MHASSAN | Approved | check lights appear to be missing seismic wires. need to see second layer of duct wrap. need HVAC system up and running at time of inspection, need air balance report. |
| 09/18/2018 | ROOF NAILING | MHASSAN | Approved | check lights appear to be missing seismic wires. need to see second layer of duct wrap. need HVAC system up and running at time of inspection, need air balance report. |
| 10/26/2018 | MECHANICAL - FINAL | GWEST | Approved | |
| 10/26/2018 | PLUMBING - FINAL | GWEST | Approved | |
| 10/26/2018 | ELECTRIC - FINAL | GWEST | Approved | |
| 10/26/2018 | BUILDING - FINAL | GWEST | Approved | |
| 10/31/2018 | CERTIFICATE OF OCCUPANCY | GWest | Approved | APPROVED PER BUILDING FINAL |
| 10/31/2018 | FIREWALL/FIREBARRIER/FIRESTOP | GWest | Approved | APPROVED PER BUILDING FINAL |
| 10/31/2018 | BUILDING ABOVE CEILING | GWest | Approved | APPROVERD PER BUILDING FINAL |
| 10/31/2018 | PLUMBING - PROGRESS | GWest | Approved | APPROVED PER PLUMBING FINAL |
| 10/31/2018 | SITE - SEWER | GWest | Approved | APPROVED PER PLUMBING FINAL |
| 10/31/2018 | PLUMBING - ABOVE CEILING | GWest | Approved | APPROVED PER PLUMBING FINAL |
| 10/31/2018 | BUILDING - PROGRESS | GWest | Approved | APPROVER PER BUILDING FINAL |
| 10/31/2018 | BUILDING PRE-SLAB | GWest | Approved | APPROVED PER BUILDING FINAL |
| 10/31/2018 | ELECTRIC - ABOVE CEILING | GWest | Approved | APPROVED PER 2090 ELECTRICAL FINAL |
| 10/31/2018 | MECHANICAL - ABOVE CEILING | GWest | Approved | APPROVED PER 4090 MECHANICAL FINAL |
| 10/31/2018 | MECHANICAL - INTERMEDIATE | GWest | Approved | APPROVED PER 4090 |
| 10/31/2018 | HEALTH DEPT - FINAL 724-7908 | UPRICILLA | Approved | RECEIVED VERBAL CONFIRMATION FROM URBINA PRICILLA THAT HEALTH IS APPROVED. |
| 10/31/2018 | FIRE - FINAL | gsereno1 | Approved | Approved per C. Basaldua |
| 10/31/2018 | FIRE - KITCHEN EXH HOOD FINAL | gsereno1 | Approved | Approved already by C Basaldua |
| 10/31/2018 | ENGINEERING - FINAL | RLEDONNE | Approved |