Permit Details

Status:
C of o
Type:
COMMERCIAL ALTERATION
Apply Date:
06/13/2017
Applicant:
N/A
Description:
MARIJUANA DISPENSARY
Architects:
  • DALE RUSH
Contractors:
  • CIMETTA ENGINEERING AND CONSTRUC

Permit Reviews

Permit Number - T17CM04580
Permit Status: C of o
Permit Description: MARIJUANA DISPENSARY
Start Date Submittal Complete Date Status  
06/13/2017 COMMERCIAL - TI 06/15/2017 COMPLETED Review Details
06/15/2017 COMMERCIAL - BLDG/FIRE/ZONING/ENG 06/23/2017 COMPLETED Review Details
06/23/2017 RESUBMITTAL 07/03/2017 COMPLETED Review Details
12/19/2017 REVISION - - 1ST 12/19/2017 COMPLETED Review Details

Outstanding Activity Conditions

Permit Number - T17CM04580
Permit Status: C of o
Permit Description: MARIJUANA DISPENSARY
Total Outstanding Activity Conditions - 1
Date Name
06/13/2017 PLANS EXPIRE IN 180 DAYS FROM DATE OF SUBMITTAL. PERMITS EXPIRE IN 180 DAYS FROM DATE OF ISSUE OR LAST INSPECTION.

Completed Inspections

Permit Status: C of o
Permit Number: T17CM04580
Permit Description: MARIJUANA DISPENSARY
Total Completed Inspections - 11
Date Description Inspector Results Comments
10/16/2017 ELECTRIC - INTERMEDIATE TVALENC1 Approved IVRS - Inspection :*
10/16/2017 ELECTRIC - ABOVE CEILING TVALENC1 Approved IVRS - Inspection :*
10/16/2017 BUILDING - PROGRESS TVALENC1 Approved IVRS - Inspection :*
10/16/2017 BUILDING ABOVE CEILING TVALENC1 Approved IVRS - Inspection :*
10/16/2017 FRAMING TVALENC1 Approved IVRS - Inspection :*
12/27/2017 ELECTRIC - FINAL JBURGE Approved
12/29/2017 FIRE - FINAL jdonovan Approved All items complete, need sprinkler plan/permit submitted and approved prior to clearing firre final.
OK for TCO.
12/29/2017 FIRE SPKLR - FINAL jdonovan Approved Need plans/permit for addition of 3 heads.
Ok for TCO all systems operational and functional.
12/29/2017 BUILDING - FINAL NORTH Approved FINAL OK PENDING ENGINEERING AND FIRE APPROVALS
12/29/2017 ENGINEERING - FINAL DROBERTS Approved DISCUSSED THIS SITES CURRENT CONDITIONS WITH CLAYTON TREVILLYAN, AND THE ADA ACCESS FROM THE PARKING INTO THE BUILDING.
THIS SITE WILL BE ALLOWED A TEMPORARY CERTIFICATE OF OCCUPANCY IN ITS CURRENT CONDITION WITH THE STIPULATION THAT THE ADA ACCESS PARKING SPACES, ACCESS AISLES, AND MARKED PATHWAYS BE BROUGHT INTO COMPLIANCE.
1) SOME OF THE PARKING SPACES AND ACCESS AISLES EXCEED THE 2% MAXIMUM RUNNING OR CROSS SLOPES AND NEED TO BE BROUGHT BACK INTO COMPLIANCE. THE ACCESS AISLES FOR THE FOUR PARKING SPACES IN THE SOUTHEAST QUADRANT OF THE PARKING LOT IS SHOWN ON THE APPROVED PLANS TO HAVE A 4' PATHWAY BETWEEN THE PARKING SPACES THAT WOULD ALLOW FOR SAFE PASSAGE BETWEEN THE NORTHERN AND SOUTHERN PARKING SPACES TO THE PEDESTRIAN PATHWAY THAT RUNS PERPENDICULAR TO THE P.A.A.L. VERIFY THAT THERE IS ENOUGH SPACE BETWEEN THE PARKING BLOCKS FOR THIS ACCESS.
2) THE PEDESTRIAN PATHWAYS FROM THE PARKING SPACES INTO THE BUILDING IS OUT OF COMPLIANCES AT VARIOUS LOCATIONS FROM THE PARKING SPACES TO THE FRONT DOOR ENTRANCE LOCATED ON THE WEST FACE OF THIS BUILDING. ALL AREA BEING UTILIZED FOR THE PEDESTRIAN PATHWAY CANNOT EXCEED THE 2% CROSS SLOPE OR THE 5% RUNNING SLOPE. REPAIR ALL AREAS PRIOR TO CALLING IN FOR THE FINAL INSPECTION OF ENGINEERING.
3) ENSURE GENERAL CLEANUP OF THE SITE ONCE ALL REPAIRS HAVE BEEN MADE, AND THAT CONSTRUCTION TRASH AND DEBRIS ARE LOCATED OUTSIDE OF THE PEDESTRIAN ACCESS PATHWAYS.
01/10/2018 STORMWATER FOLLOW-UP INSP DROBERTS Approved

Documents

File Name Document Type  
None CERT OF OCC VIEW
001_A001.TIF CONSTRPLANS VIEW
002_A101.TIF CONSTRPLANS VIEW
003_A201.TIF CONSTRPLANS VIEW
004_A601.TIF CONSTRPLANS VIEW
005_E101.TIF CONSTRPLANS VIEW
006_M101.TIF CONSTRPLANS VIEW
None DOCUMENTS VIEW