Permit: T17CM02476
Permit Details
Apply Date:
03/30/2017
Applicant:
N/A
Description:
(T17DV00060) REMOVE/REPLACE CONDUIT,WIRE
Contractors:
- ITSA CONTRACTING LLC
- J E B ELECTRIC INC ,
Permit Reviews
Permit Number - T17CM02476
Permit Status: Final
Permit Description: (T17DV00060) REMOVE/REPLACE CONDUIT,WIRE
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 03/30/2017 | WALK THRU - COMM | 04/03/2017 | COMPLETED |
| 06/20/2017 | REVISION - - 1ST | 06/21/2017 | COMPLETED |
| 06/21/2017 | REVISION - - 1ST | 06/23/2017 | COMPLETED |
| 10/13/2017 | REVISION - - 2ND | 10/13/2017 | COMPLETED |
Outstanding Activity Conditions
Permit Number - T17CM02476
Permit Status: Final
Permit Description: (T17DV00060) REMOVE/REPLACE CONDUIT,WIRE
Total Outstanding Activity Conditions - 1
| Date | Name |
|---|---|
| 03/30/2017 | PLANS EXPIRE IN 180 DAYS FROM DATE OF SUBMITTAL. PERMITS EXPIRE IN 180 DAYS FROM DATE OF ISSUE OR LAST INSPECTION. |
Completed Inspections
Permit Status: Final
Permit Number: T17CM02476
Permit Description: (T17DV00060) REMOVE/REPLACE CONDUIT,WIRE
Total Completed Inspections - 23
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 04/12/2017 | ELECTRIC - CONSTRUCTION POWER | mramber1 | Approved | panel "C" ok to energize for construction power only |
| 04/13/2017 | TEP CLEARANCE - AM | MRAMBER | Approved | RECN |
| 07/28/2017 | PLUMBING - ROUGH, SOIL | bbenedon | Approved | Revise plan, red line to proceed. 3" specified, fd added. Dry vent Test fittings Adhesive tape on PEX |
| 08/02/2017 | PLUMBING - INTERMEDIATE | mpugh1 | Approved | |
| 08/24/2017 | ELECTRIC - INTERMEDIATE | mpugh1 | Approved | |
| 08/25/2017 | PLUMBING - PROGRESS | MPUGH1 | Approved | IVRS - Inspection :* |
| 09/20/2017 | FIRE - KITCHEN EXH HOOD FINAL | jvincent | Approved | called in wrong inspection. |
| 10/09/2017 | PLUMBING - ABOVE CEILING | RGREENE1 | Approved | RECOMMEND WRAPING HOOD WITH TWO LAYERS WRAP AND UP SIDES TO MAINTAIN 18 INCH CLEARANCE FROM COMBUSTIBLES. |
| 10/13/2017 | PLUMBING - FINAL | RSHERRY | Approved | WATER CHLORINATION REPORT REQUIRED |
| 01/04/2018 | MECHANICAL - INTERMEDIATE | RGREENE1 | Approved | |
| 01/04/2018 | BUILDING - PROGRESS | RGREENE1 | Approved | |
| 01/04/2018 | BUILDING ABOVE CEILING | RGREENE1 | Approved | |
| 01/04/2018 | FRAMING | RGREENE1 | Approved | |
| 01/04/2018 | OUTDOOR LIGHTING FINAL | RGREENE1 | Approved | |
| 01/04/2018 | ELECTRIC - OUTDOOR LIGHTING | RGREENE1 | Approved | |
| 01/04/2018 | ELECTRIC - FINAL | RGREENE1 | Approved | |
| 01/04/2018 | ELECTRIC - ABOVE CEILING | RGREENE1 | Approved | |
| 01/23/2018 | FIRE - ALARM FINAL | jvincent | Approved | not required |
| 01/31/2018 | FIRE - FINAL | jvincent | Approved | |
| 02/13/2018 | BUILDING - FINAL | RSHERRY | Approved | REVIEW OF WATER CHLORINATION AND AIR BALANCE REPORTS COMPLETE |
| 02/13/2018 | MECHANICAL - FINAL | RGREENE1 | Approved | |
| 02/13/2018 | MECHANICAL - ABOVE CEILING | RGREENE1 | Approved | |
| 02/13/2018 | BUILDING - FINAL | RGREENE1 | Approved | PENDING AIR AND WATER REPORTS |