Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - ROUGH, SOIL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 02/13/2018 | PLUMBING - ROUGH, SOIL | Approved | ||
| 07/28/2017 | PLUMBING - ROUGH, SOIL | Denied | Revise plan, red line to proceed. 3" specified, fd added. Dry vent Test fittings Adhesive tape on PEX |