Permit: T17CM00976
Permit Details
Apply Date:
02/06/2017
Applicant:
Lisa Bowers
Description:
SITE LIGHTING
Permit Reviews
Permit Number - T17CM00976
Permit Status: Issued
Permit Description: SITE LIGHTING
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
01/24/2020 | REVISION - - 5TH | 02/03/2020 | COMPLETED |
02/06/2017 | COMMERCIAL - BLDG/FIRE/ZONING/ENG | 02/28/2017 | COMPLETED |
02/20/2018 | REVISION - - 2ND | 02/22/2018 | COMPLETED |
04/08/2020 | REVISION - - 6TH | 11/19/2021 | COMPLETED |
04/27/2022 | REVISION - - 8TH | 05/09/2022 | COMPLETED |
07/17/2018 | REVISION - - 3RD | 11/13/2018 | COMPLETED |
08/30/2017 | REVISION - - 1ST | 08/30/2017 | COMPLETED |
09/24/2019 | REVISION - - 4TH | 09/24/2019 | COMPLETED |
11/19/2021 | REVISION - - 7TH | 11/30/2021 | COMPLETED |
Outstanding Activity Conditions
Permit Number - T17CM00976
Permit Status: Issued
Permit Description: SITE LIGHTING
Total Outstanding Activity Conditions - 1
Date | Name |
---|---|
02/06/2017 | PLANS EXPIRE IN 180 DAYS FROM DATE OF SUBMITTAL. PERMITS EXPIRE IN 180 DAYS FROM DATE OF ISSUE OR LAST INSPECTION. |
Outstanding Inspections
Permit Status: Issued
Permit Number: T17CM00976
Permite Description: SITE LIGHTING
Total Outstanding Inspections - 11
Last Inspection Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
10/27/2022 | COT - LCBU - Building Final | N/A | Not Ready | |
10/27/2022 | ENGR Engineering Final | N/A | Not Ready | |
10/26/2022 | COT - LCEL - Temporary Service | N/A | Not Ready | |
10/26/2022 | COT - FCON - Fire - Final | N/A | Not Ready | |
10/26/2022 | COT - LCEL - Electrical Above Ceiling | N/A | Not Ready | |
10/26/2022 | COT - LCEL - Service Upgrade | N/A | Not Ready | |
10/26/2022 | COT - LCEL - Outdoor Lighting | N/A | Not Ready | |
10/27/2022 | COT - LCEL - Electrical Final | N/A | Not Ready | |
10/26/2022 | COT - LCEL - Grounding/Bonding | N/A | Not Ready | |
08/17/2023 | COT - HCBU - Excavation/Rebar/Zoning | N/A | Partial Pass | Partial pass. UFER is in place for 1 light pole base. Rebar per plan okay for concrete placement. 8/17/2023 |
08/17/2023 | COT - HCEL - Electrical Underground | N/A | Partial Pass | Partial pass. UFER is in place for 1 light pole base. Rebar per plan okay for concrete placement. 8/17/2023 |
Completed Inspections
Permit Status: Issued
Permit Number: T17CM00976
Permit Description: SITE LIGHTING
Total Completed Inspections - 5
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
10/31/2018 | COT - LCEL - Construction Power | Passed | {Activity date: 10/31/2018; Status: Approved; Inspector: RCAMACHO; Comment: Entered by CBELL1 - ECO pedestal to sign okay to energize} |
|
11/30/2018 | BULD - Electrical Clearance | Passed | {Activity date: 11/30/2018; Status: Approved; Inspector: RCAMACHO; Comment: Entered by KROBLES1 - ECO FOR PEDESTAL 4631 S LANDING WAY} ; {Activity date: 11/23/2018; Status: Approved; Inspector: RCAMACHO; Comment: Entered by CBELL1 - ECO} ; {Activity date: 11/02/2018; Status: Approved; Inspector: ARuiz; Comment: Entered by ARUIZ1 - ECO called into TEP Fernando} ; {Activity date: 11/01/2018; Status: Approved; Inspector: RCAMACHO; Comment: Entered by CBELL1 - ECO} ; {Activity date: 07/27/2018; Status: Approved; Inspector: DQUINN; Comment: Entered by AMONTIJ2 - ECO 4701 S CALLE SANTA CRUZ - MP3 4731 & 4733 S LANDING WAY -MP2 A+B} ; {Activity date: 08/31/2017; Status: Approved; Inspector: MRAMBER; Comment: Entered by FFIGUER1 - ECO} |
|
01/14/2019 | COT - LCEL - Electrical Intermediate | Passed | {Activity date: 01/14/2019; Status: Approved; Inspector: MHASSAN; Comment: Entered by CBELL1 - } ; {Activity date: 01/10/2019; Status: Partial Approval; Inspector: MHASSAN; Comment: Entered by CBELL1 - three light pole bases along Calle Santa Cruz and two more on north side of lot 9 ok. Underground to those light pole bases also OK} ; {Activity date: 12/17/2018; Status: Not ready for Inspection; Inspector: RCAMACHO; Comment: Entered by CBELL1 - Canceled} ; {Activity date: 12/12/2018; Status: Denied; Inspector: RCAMACHO; Comment: Entered by CBELL1 - Left message Underground covered w/o inspection to pole base lots 10 & 11. Open areas to spot check conduit} ; {Activity date: 11/28/2018; Status: Partial Approval; Inspector: MHASSAN; Comment: Entered by CBELL1 - underground Lot 12 to Transformer Pad okay. From lot 11 to Transformer Pad okay. From lot 9 to Transformer Pad okay.} ; {Activity date: 11/02/2018; Status: Partial Approval; Inspector: ARuiz; Comment: Entered by ARUIZ1 - INSPECTOR clearance will need to be resent after reinspection of corrections per TEP. Pedestal under 4631 S Landing Wy to be labeled correctly in field for 10/31/18 inspection} |
|
10/17/2019 | COT - LCBU - Excavation/Rebar/Zoning | Passed | {Activity date: 10/17/2019; Status: Approved; Inspector: TVALENCIA; Comment: Entered by DMERANZ1 - } ; {Activity date: 01/31/2019; Status: Partial Approval; Inspector: RCAMACHO; Comment: Entered by CBELL1 - Eight light pole bases lots one, two, three and 22} ; {Activity date: 01/30/2019; Status: Not ready for Inspection; Inspector: RCAMACHO; Comment: Entered by CBELL1 - canceled} ; {Activity date: 08/22/2017; Status: Partial Approval; Inspector: RCAMACHO; Comment: Entered by RCAMACH1 - LIGHT POLE BASES COMPLETE PENDING AS BUILT FOR ADDED LIGHT POLE} ; {Activity date: 05/10/2017; Status: Partial Approval; Inspector: RCAMACHO; Comment: Entered by RCAMACH1 - 5 LIGT POLE BASES SEE HIGHLIGHTD PLAN DATED 2 5/10 PROVIDE RED LINE AS BIIILT TO ASS EXTRA LIGHT POLE BETWEEN LOTS 5 & 7} ; {Activity date: 05/09/2017; Status: Not ready for Inspection; Inspector: RCAMACHO; Comment: Entered by RCAMACH1 - CANCELED} ; {Activity date: 05/04/2017; Status: Partial Approval; Inspector: RCAMACHO; Comment: Entered by RCAMACH1 - SEE HIGHLIGHTED LIGHT POLE BASES ON APPROVED PLAN DATES 5/4} ; {Activity date: 05/02/2017; Status: Partial Approval; Inspector: RCAMACHO; Comment: Entered by RCAMACH1 - SEE HIGHLIGHTD LIGHT POLE BASES DATES 5/2} ; {Activity date: 04/28/2017; Status: Not ready for Inspection; Inspector: RCAMACHO; Comment: Entered by RCAMACH1 - CANCELED} ; {Activity date: 04/27/2017; Status: Partial Approval; Inspector: RCAMACHO; Comment: Entered by RCAMACH1 - 6 LIGHT POLE BASES ONLY SEE HOGHLIGHTED AREAS ON PLAN} ; {Activity date: 04/26/2017; Status: Not ready for Inspection; Inspector: mramber1; Comment: Entered by MRAMBER1 - provide minimum 3" clearence from re-bar to earth} |
|
06/29/2022 | COT - LCEL - Electrical Underground | Passed | {Activity date: 06/29/2022; Status: Approved; Inspector: TGAUSP; Comment: Entered by VVERA1 - Approved conduits up to building - lot 20, okay to backfill progress areas} ; {Activity date: 10/31/2018; Status: Partial Approval; Inspector: rcamacho; Comment: Entered by ARUIZ1 - ECO pedestal to sign okay to energize} ; {Activity date: 10/14/2019; Status: Partial Approval; Inspector: tvalencia; Comment: Entered by ARUIZ1 - 1- Underground electric conduits for pads 24, 25 and 31 are okay to cover. Note; This Inspection is from the Transformer to the pads only.} ; {Activity date: 05/20/2019; Status: Continued; Inspector: MHASSAN; Comment: Entered by DROBERT5 - } ; {Activity date: 05/17/2019; Status: Cancelled; Inspector: IVR USER; Comment: Entered by IVR USER - IVRS - AP canceled} ; {Activity date: 01/31/2019; Status: Partial Approval; Inspector: RCAMACHO; Comment: Entered by CBELL1 - Eight light pole bases lots one, two, three and 22} ; {Activity date: 01/30/2019; Status: Cancelled; Inspector: IVR USER; Comment: Entered by IVR USER - IVRS - AP canceled} ; {Activity date: 01/30/2019; Status: Not ready for Inspection; Inspector: RCAMACHO; Comment: Entered by CBELL1 - canceled} ; {Activity date: 01/29/2019; Status: Cancelled; Inspector: IVR USER; Comment: Entered by IVR USER - IVRS - AP canceled} ; {Activity date: 01/22/2019; Status: Partial Approval; Inspector: RCAMACHO; Comment: Entered by CBELL1 - Lots 2 & 3 except at pole bases} ; {Activity date: 01/17/2019; Status: Partial Approval; Inspector: Avaughn; Comment: Entered by AVAUGHN1 - PA - Needed to make other inspections. Please place all inspections as PA and note what work was looked at, untill the final inspection has been called out for. Thank you Permit Desk} ; {Activity date: 10/30/2018; Status: Cancelled; Inspector: IVR USER; Comment: Entered by IVR USER - IVRS - AP canceled} ; {Activity date: 10/16/2018; Status: Cancelled; Inspector: IVR USER; Comment: Entered by IVR USER - IVRS - AP canceled} ; {Activity date: 10/11/2018; Status: Cancelled; Inspector: IVR USER; Comment: Entered by IVR USER - IVRS - AP canceled} ; {Activity date: 06/21/2018; Status: Partial Approval; Inspector: RCAMACHO; Comment: Entered by RCAMACH1 - 3 X 4" FROM TRANSFORMER TO LOT 33 2 X 4" FROM TRANSFORMER TO LOT 30 2 X 4" FROM TRANSFORMER TO LOT 29} ; {Activity date: 06/20/2018; Status: Partial Approval; Inspector: RCAMACHO; Comment: Entered by RCAMACH1 - CONDUIT FROM LOT 11-34 BEFORE BEND CONDUIT AT LOT 14 SEE HIGHLIGHTED PLAN} ; {Activity date: 06/19/2018; Status: Cancelled; Inspector: IVR USER; Comment: Entered by IVR USER - IVRS - AP canceled} ; {Activity date: 06/15/2018; Status: Cancelled; Inspector: IVR USER; Comment: Entered by IVR USER - IVRS - AP canceled} ; {Activity date: 06/12/2018; Status: Cancelled; Inspector: IVR USER; Comment: Entered by IVR USER - IVRS - AP canceled} ; {Activity date: 05/14/2018; Status: Partial Approval; Inspector: mramber1; Comment: Entered by MRAMBER1 - from trans to lot 35 from trans to lot 14 from trans to site lighting meter } ; {Activity date: 05/10/2018; Status: Cancelled; Inspector: IVR USER; Comment: Entered by IVR USER - IVRS - AP canceled} ; {Activity date: 05/07/2018; Status: Cancelled; Inspector: IVR USER; Comment: Entered by IVR USER - IVRS - AP canceled} ; {Activity date: 04/18/2018; Status: Not ready for Inspection; Inspector: RCAMACHO; Comment: Entered by RCAMACH1 - CONTRACTOR TO RECALL} ; {Activity date: 04/03/2018; Status: Partial Approval; Inspector: RBALDWIN; Comment: Entered by RBALDWI2 - TRANSFORMER STUB UPS FOR LOTS 16,17&19 1-21/2, 12-4", LOTS 27&28 6-4", LOTS29&15 6-4", LOTS30,33,34,35 12-4"} ; {Activity date: 04/02/2018; Status: Cancelled; Inspector: IVR USER; Comment: Entered by IVR USER - IVRS - AP canceled} ; {Activity date: 02/28/2018; Status: Partial Approval; Inspector: RCAMACHO; Comment: Entered by RCAMACH1 - SECONDARIES TO LOTS 32, 36 &37 9X4" & 1X 2 1/2" TO SIGN SECONDARIES TO LOTS 24, 25 & 31 9X4" SECONDARIES TO LOTS 22 &23 6X4"} ; {Activity date: 08/23/2017; Status: Partial Approval; Inspector: RCAMACHO; Comment: Entered by RCAMACH1 - LAST 2 LIGHT POLE BASES P[ENDING AS BUILT TO ADDED BASE NOT ON PLAN} ; {Activity date: 05/10/2017; Status: Partial Approval; Inspector: RCAMACHO; Comment: Entered by RCAMACH1 - 5 LIGT POLE BASES SEE HIGHLIGHTD PLAN DATED 2 5/10 PROVIDE RED LINE AS BIIILT TO ASS EXTRA LIGHT POLE BETWEEN LOTS 5 & 7} ; {Activity date: 05/09/2017; Status: Partial Approval; Inspector: RCAMACHO; Comment: Entered by RCAMACH1 - FROM PULL BOX TO PULL BOX ON SOUTH LOCATION SEE HIGHLIGHTED AREAS ON APPROVED PLAN DATED 5/9} ; {Activity date: 04/27/2017; Status: Partial Approval; Inspector: RCAMACHO; Comment: Entered by RCAMACH1 - 6 LIGHT POLE BASES ONLY SEE HOGHLIGHTED AREAS ON PLAN} ; {Activity date: 04/20/2017; Status: Partial Approval; Inspector: RCAMACHO; Comment: Entered by RCAMACH1 - SEE HGHLIGHTED AREAS DATED 4/20} ; {Activity date: 04/13/2017; Status: Partial Approval; Inspector: ESTEVEN1; Comment: Entered by ESTEVEN1 - SEE SITE PLAN E1.1 SIGNED AND DATED AREAS} ; {Activity date: 04/11/2017; Status: Partial Approval; Inspector: RCAMACHO; Comment: Entered by RCAMACHO - SEE HIGHLIGHTED AREAS} ; {Activity date: 04/07/2017; Status: Not ready for Inspection; Inspector: rcamacho; Comment: Entered by RCAMACHO - } ; {Activity date: 04/06/2017; Status: Partial Approval; Inspector: RCAMACHO; Comment: Entered by RCAMACHO - SEE HIGHLIGHTED AREAS ON PLAN 2 EACH 1 1/2" CONDUIT FROM 40' NORTH OF PULL BOX 3 TO TRANSFORMER 1" CONDUIT TO LOT 8} ; {Activity date: 04/04/2017; Status: Partial Approval; Inspector: RCAMACHO; Comment: Entered by RCAMACHO - 2 EACH 1 1/2"CONDUIT FROM 1ST TEP PULL BOX TO 40' NORTH OF 3RD TEP PULL BOX ONLY} ; {Activity date: 04/03/2017; Status: Partial Approval; Inspector: RCAMACHO; Comment: Entered by RCAMACHO - 6 SECONDARIES LOTS 6 & 8 8 SECONDARIES LOTS 4,5 &7 4 SECONDARIES LOT 2 3 SECONDARIES LOT3 6 SECONDARIES LOT18 4 SECONDARIES LOT1 7 SECONDARIES LOT 27 2 SECONDARIES LOT 21 4" SECONDARIES ONLY } ; {Activity date: 03/30/2017; Status: Partial Approval; Inspector: ESTEVEN1; Comment: Entered by ESTEVEN1 - TWO UNDERGROUND SECTION, SEE SITE PLAN E1.1, SIGNED AND DATED.} |