Permit: T17CM00266
Permit Details
Apply Date:
01/12/2017
Applicant:
POSTER FROST MIRTO, INC.
Description:
RESTORATION OF A HISTORIC BUILDING
Architects:
- MIRTO, JON MICHAEL
Contractors:
- TOFEL CONSTRUCTION LLC
Permit Reviews
Permit Number - T17CM00266
Permit Status: C of o
Permit Description: RESTORATION OF A HISTORIC BUILDING
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 01/12/2017 | PLANS OK TO SUBMIT - COMM | 01/12/2017 | COMPLETED |
| 02/13/2017 | 3RD PARTY REVIEW - COMMERCIAL | 02/17/2017 | COMPLETED |
| 02/17/2017 | POST 3RD PARTY REVIEW | 08/07/2017 | COMPLETED |
| 07/24/2017 | 3RD PARTY REVIEW - REVISION/OTHER | 08/07/2017 | COMPLETED |
| 09/05/2017 | REVISION - - 1ST | 09/06/2017 | COMPLETED |
| 10/20/2017 | 3RD PARTY REVIEW - REVISION/OTHER | 10/23/2017 | COMPLETED |
Completed Inspections
Permit Status: C of o
Permit Number: T17CM00266
Permit Description: RESTORATION OF A HISTORIC BUILDING
Total Completed Inspections - 50
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 09/14/2017 | ELECTRIC - CONSTRUCTION POWER | RCAMACHO | Approved | TMPP |
| 09/15/2017 | TEP CLEARANCE - AM | CAMACHO | Approved | TMPP |
| 12/06/2017 | EXCAVATION/LAYOUT REBAR & ZON | RCAMACHO | Approved | 2 COLUMNS AT EXISTING WALL PER DETAIL 106 1ST LIFT ELEVATOR PIT PER DETAIL 114 ONLY |
| 12/15/2017 | ROOF NAILING | RCAMACHO | Approved | NAILING OK ALL HARDWARE OK TO COVER EXCEPT DETAIL 301/S5.1A PLYWOOD 3/8" WITH BRACING 24"OC AND THRU BOLTS WITH PLATES AT EXISTING |
| 12/15/2017 | EXT METAL CLIPS/EXT SHEATHING | RCAMACHO | Approved | NAILING OK ALL HARDWARE OK TO COVER EXCEPT DETAIL 301/S5.1A PLYWOOD 3/8" WITH BRACING 24"OC AND THRU BOLTS WITH PLATES AT EXISTING |
| 03/16/2018 | PLUMBING - ROOF DRAINS | rbaldwin | Approved | |
| 05/29/2018 | SHEET ROCK NAILING | MRAMBER1 | Approved | |
| 05/29/2018 | SHEET ROCK NAILING | mramber1 | Approved | partial 2nd level |
| 06/01/2018 | MECHANICAL - ABOVE CEILING | ESTEVEN1 | Approved | |
| 06/01/2018 | PLUMBING - ABOVE CEILING | ESTEVEN1 | Approved | |
| 06/01/2018 | ELECTRIC - ABOVE CEILING | ESTEVEN1 | Approved | |
| 06/01/2018 | MECHANICAL - ABOVE CEILING | ESTEVEN1 | Approved | 2ND FLOOR ALL UNITS, EXCEPT FOR UNIT A2, KITCHEN AND BATH ONLY |
| 06/01/2018 | PLUMBING - ABOVE CEILING | ESTEVEN1 | Approved | 2ND FLOOR UNITS. |
| 06/01/2018 | ELECTRIC - ABOVE CEILING | ESTEVEN1 | Approved | 2ND FLOOR, ALL UNITS AND HALLWAY. |
| 06/14/2018 | SITE - SEWER | MRAMBER1 | Approved | IVRS - Inspection :* |
| 06/25/2018 | ELECTRIC - CABLE DROP | ESTEVEN1 | Approved | APPROVED ECO UNITS 201, 202, 203, 204, 301, 302, 303, 304, BASEMENT PANEL AND ROOF PANEL. |
| 07/06/2018 | PLUMBING - SEWER HCS CONNECT | RCAMACHO | Approved | |
| 07/06/2018 | PLUMBING - BACK WATER VALVE | RCAMACHO | Approved | |
| 07/06/2018 | PLUMBING - INTERMEDIATE | RCAMACHO | Approved | |
| 07/30/2018 | PLUMBING - YARD WTR LINE/TEST | RCAMACHO | Approved | |
| 10/24/2018 | ELECTRIC - TEMPORARY SERVICE | MRAMBER | Approved | |
| 10/24/2018 | BUILDING PRE-SLAB | MRAMBER | Approved | |
| 10/24/2018 | ELECTRIC - INTERMEDIATE | MRAMBER | Approved | |
| 10/24/2018 | FIREWALL/FIREBARRIER/FIRESTOP | MRAMBER | Approved | |
| 10/24/2018 | MECHANICAL - INTERMEDIATE | MRAMBER | Approved | |
| 10/24/2018 | REINFORCED MASONRY PRE-GROUT | MRAMBER | Approved | |
| 10/24/2018 | BUILDING ABOVE CEILING | MRAMBER | Approved | |
| 10/24/2018 | FRAMING | MRAMBER | Approved | |
| 10/24/2018 | STEM WALL/RETAINING WALL | MRAMBER | Approved | |
| 10/24/2018 | ELECTRIC - UNDERGROUND | MRAMBER | Approved | |
| 10/24/2018 | PLUMBING - ROUGH, SOIL | MRAMBER | Approved | |
| 10/24/2018 | U VALUE FOR WINDOW | MRAMBER | Approved | |
| 10/24/2018 | STUCCO MESH | MRAMBER | Approved | |
| 11/08/2018 | FIRE SPKLR - FINAL | JPEELDAVIS | Approved | |
| 11/09/2018 | OUTDOOR LIGHTING FINAL | RCAMACHO | Approved | |
| 11/09/2018 | ELECTRIC - OUTDOOR LIGHTING | RCAMACHO | Approved | |
| 11/09/2018 | SIGN - FINAL | BBENEDON | Approved | |
| 11/19/2018 | NPPO - FINAL | DROBERTS | Approved | |
| 11/19/2018 | ENGINEERING - FINAL | DROBERTS | Approved | |
| 11/19/2018 | LANDSCAPE - FINAL | DROBERTS | Approved | |
| 11/30/2018 | MECHANICAL - FINAL | mramber1 | Approved | |
| 11/30/2018 | BUILDING - FINAL | mramber1 | Approved | Approved for CO |
| 11/30/2018 | RIGHT OF WAY - FINAL | JGARCIA | Approved | Verbal approval by Gloria Salmeron, TDOT ROW. |
| 11/30/2018 | ZONING - FINAL | JGARCIA | Approved | DP Has been approved. |
| 11/30/2018 | ELECTRIC - UFER | MRAMBER | Approved | |
| 11/30/2018 | FIRE - FINAL | jvincent | Approved | two way comm tested. |
| 11/30/2018 | FIRE - ALARM FINAL | jvincent | Approved | access panels installed. will label. |
| 11/30/2018 | PLUMBING - FINAL | MRAMBER | Approved | |
| 11/30/2018 | ELECTRIC - FINAL | MRAMBER | Approved | |
| 11/30/2018 | BUILDING - FINAL | MRAMBER | Approved | Pending all trades. |