Inspection History Details
Inspection Status: Approved
Inspection History: MECHANICAL - FINAL
Permit Number - T17CM00266
Inspection Description - MECHANICAL - FINAL
Inspection Status - Approved
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
11/30/2018 | MECHANICAL - FINAL | Approved | ||
11/29/2018 | MECHANICAL - FINAL | Partial Approval | Contractor has demonstrated acceptable procedure for the removal of air handlers. | |
11/09/2018 | MECHANICAL - FINAL | Partial Approval | Comply with previous notes provide sterilization report an air balance report to Bob Sherry 8 a.m. to 9:30 a.m. pending fire and Engineering finals okay to apply for temporary C of O per Bruce Stevens |
|
11/08/2018 | MECHANICAL - FINAL | Partial Approval | PENDING ENGINEERING, LANDSCAPE, AND THE FOLLOWING CORRECTIONS: UNIT 214 (ACCESSIBLE) TOILET IS 20 1/2" FROM SIDE WALL (MAX 18 1/2") FAN COIL ACCESS PANELS IN ROUTE (ETA 11/16) TEMPORARY PANELS ARE IN PLACE. WITH AGREEMENT OF THE ENGINEERING AND FIRE INSPECTORS, I WILL SUPPORT APPROVAL OF TCO WITH 30 DAY LIMIT FOR MOVE IN ONLY (NO OCCUPANCY) |
|
11/07/2018 | MECHANICAL - FINAL | Partial Approval | Basement inspection, support ducts, seal penetrations through cieling, isolators at units. | |
11/06/2018 | MECHANICAL - FINAL | Not ready for Inspection |