Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Inspection History Details
Inspection Status: Approved
Inspection History: ENGINEERING - FINAL
Permit Number - T17CM00266
Inspection Description - ENGINEERING - FINAL
Inspection Status - Approved
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
11/19/2018 | ENGINEERING - FINAL | Approved | ||
11/09/2018 | ENGINEERING - FINAL | Not ready for Inspection | Handrail detail on Page Six requires a bottom rail. There are missing plants and trees and steaks, we need to check the slopes in the parking lot after the remaining construction materials have been removed. Need to check grading around bubblers, landscape areas, and catch basins. Complete the relocation of the temporary fencing prior too TCO. Inspector has no other issues that might prevent a temporary certificate of occupancy |
|
05/16/2018 | ENGINEERING - FINAL | Continued | WALL FOR TRASH ENCLOSUER OK. | |
05/09/2018 | ENGINEERING - FINAL | Continued | FOOTER FOR TRASH ENCLOSUER OK. |