Permit: T16CM08161
Permit Details
Apply Date:
10/27/2016
Applicant:
KITCHELL CONTRACTORS INC OF ARIZONA
Description:
SKILLED NURSING FACILITY
Contractors:
- KITCHELL CONTRACTORS INC OF ARIZONA
Permit Reviews
Permit Number - T16CM08161
Permit Status: C of o
Permit Description: SKILLED NURSING FACILITY
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
02/07/2017 | RESUBMITTAL - TI ALL | 02/09/2017 | COMPLETED |
10/27/2016 | PLANS OK TO SUBMIT - COMM | 11/03/2016 | COMPLETED |
11/03/2016 | COMMERCIAL - NEW | 12/21/2016 | COMPLETED |
12/21/2016 | RESUBMITTAL - TI ALL | 02/07/2017 | COMPLETED |
Outstanding Activity Conditions
Permit Number - T16CM08161
Permit Status: C of o
Permit Description: SKILLED NURSING FACILITY
Total Outstanding Activity Conditions - 1
Date | Name |
---|---|
10/27/2016 | PLANS EXPIRE IN 180 DAYS FROM DATE OF SUBMITTAL. PERMITS EXPIRE IN 180 DAYS FROM DATE OF ISSUE OR LAST INSPECTION. |
Completed Inspections
Permit Status: C of o
Permit Number: T16CM08161
Permit Description: SKILLED NURSING FACILITY
Total Completed Inspections - 50
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
04/18/2017 | PLUMBING - ROUGH, SOIL | TVALENC1 | Approved | |
04/24/2017 | SITE - SEWER | TVALENC1 | Approved | |
04/26/2017 | ELECTRIC - UFER | TVALENC1 | Approved | 1- #3 UFER GROUNG PROVIDED FROM ROOM 168 TO THE SES LOCATION. |
04/27/2017 | BUILDING PRE-SLAB | TVALENC1 | Approved | |
08/10/2017 | PLUMBING - GAS PRESSURE TEST | TVALENC1 | Approved | 1- GAS PRESSURE TEST PROVIDED 1ST FLOOR. |
08/10/2017 | PLUMBING - YARD WTR LINE/TEST | TVALENC1 | Approved | |
08/22/2017 | MECHANICAL - ABOVE CEILING | TVALENCI1 | Approved | 1- HVAC SUPPLY DUCT OKAY FOR INSULATION IN AREAS (A) AND (C) ONLY. |
08/29/2017 | PLUMBING - ROOF DRAINS | TVALENC1 | Approved | 1- RAIN WATER CONDUCTORS WATER TEST PROVIDED IN AREA (C) SOUTH AND THE CANOPY. 2- DWV WATER TEST PROVIDED IN AREA (C) SOUTH 1ST AND 2ND FLOORS ONLY. 3- DOMESTIC WATER AIR TEST PROVIDED IN AREA (C) SOUTH ABOVE CEILING AND IN WALL 1ST AND 2ND FLOORS ONLY |
08/29/2017 | PLUMBING - INTERMEDIATE | TVALENC1 | Approved | 1- RAIN WATER CONDUCTORS WATER TEST PROVIDED IN AREA (C) SOUTH AND THE CANOPY. 2- DWV WATER TEST PROVIDED IN AREA (C) SOUTH 1ST AND 2ND FLOORS ONLY. 3- DOMESTIC WATER AIR TEST PROVIDED IN AREA (C) SOUTH ABOVE CEILING AND IN WALL 1ST AND 2ND FLOORS ONLY |
08/29/2017 | PLUMBING - ABOVE CEILING | TVALENC1 | Approved | 1- RAIN WATER CONDUCTORS WATER TEST PROVIDED IN AREA (C) SOUTH AND THE CANOPY. 2- DWV WATER TEST PROVIDED IN AREA (C) SOUTH 1ST AND 2ND FLOORS ONLY. 3- DOMESTIC WATER AIR TEST PROVIDED IN AREA (C) SOUTH ABOVE CEILING AND IN WALL 1ST AND 2ND FLOORS ONLY |
08/29/2017 | SHEET ROCK NAILING | TVALENC1 | Approved | 1- RAIN WATER CONDUCTORS WATER TEST PROVIDED IN AREA (C) SOUTH AND THE CANOPY. 2- DWV WATER TEST PROVIDED IN AREA (C) SOUTH 1ST AND 2ND FLOORS ONLY. 3- DOMESTIC WATER AIR TEST PROVIDED IN AREA (C) SOUTH ABOVE CEILING AND IN WALL 1ST AND 2ND FLOORS ONLY |
09/13/2017 | PLUMBING - MD GAS/PRECONST MTG | TVALENC1 | Approved | |
09/18/2017 | FRAMING | TVALENC1 | Approved | 1- FRAMING IN AREA (A,B & D) 2ND FLOOR OS OKAY FOR SHEET ROCK. |
09/27/2017 | MECHANICAL - HOODS | JMILITE1 | Approved | SMOKE TESTED GREASE DUCT. OK FOR 1ST LAYER OF FIRE WRAP. OK TO SHEET ROCK SOFFITS 1ST FLOOR AREA C, NURSES STATION, AND AREA D. |
09/28/2017 | PLUMBING - MEDICAL GAS/TEST | JMILITE1 | Approved | IVRS - Inspection :* |
10/02/2017 | MECHANICAL - INTERMEDIATE | TVALENC1 | Approved | IVRS - Inspection :* |
10/12/2017 | ELECTRIC - CONSTRUCTION POWER | aquiroz | Approved | |
10/13/2017 | TEP CLEARANCE - AM | AQUIROZ | Approved | ECO |
10/24/2017 | ELECTRIC - ABOVE CEILING | TVALENC1 | Approved | 1- ABOVE CEILING ELECTRICAL SYSTEM IS OKAY IN HARD LIDS IN THE NURSING STATION AREA (A,B) ONLY. 2- OKAY FOR SHEET ROCK. |
10/25/2017 | PLUMBING - PROGRESS | TVALENC1 | Approved | IVRS - Inspection :* 1- DWV WATER TEST PROVIDED. 3- OVERHEAD AND IN WALL DOMESTIC WATER DISTRIBUTION IS OKAY TO COVER |
11/02/2017 | FIREWALL/FIREBARRIER/FIRESTOP | TVALENC1 | Approved | IVRS - Inspection :* |
11/16/2017 | EXCAVATION/LAYOUT REBAR & ZON | TVALENC1 | Approved | IVRS - Inspection :* |
12/01/2017 | BUILDING - PROGRESS | TVALENC1 | Approved | IVRS - Inspection :* 1- ATTENDED A MEETING WITH THE G.C. ABOUT TEMP. C OF O REQUIREMENTS AND SMOKE AND FIRE DAMPER REQUIREMENTS. |
12/11/2017 | STEM WALL/RETAINING WALL | TVALENC1 | Approved | IVRS - Inspection :* |
12/13/2017 | ELECTRIC - PROGRESS | TVALENC1 | Approved | IVRS - Inspection :* 1- ELECTRIC SERVICE PANELS IN LEVEL 1 ALL AREAS ARE OKAY. NOTE; SHALL PROVIDE A LETTER OF VERIFICATION OF LUG TORQUE FROM THE ELECTRICAL SUB CONTRACOR PROIR TO THE FINAL INSPECTION. |
12/22/2017 | ELECTRIC - INTERMEDIATE | NORTH | Approved | NE LITE POLES AND CONDUIT |
12/28/2017 | ELECTRIC - UNDERGROUND | NORTH | Approved | EASTSIDE LITE POLE CONDUIT OK TO COVER |
12/29/2017 | BUILDING ABOVE CEILING | NORTH | Approved | AREA B LEVEL 2 OKAY |
01/10/2018 | GAS CLEARANCE | TVALENCIA | Approved | |
01/11/2018 | PLUMBING - SEWER HCS CONNECT | TVALENC1 | Approved | IVRS - Inspection :* |
01/11/2018 | PLUMBING - GAS PRESS TEST FNL | TVALENC1 | Approved | IVRS - Inspection :* |
01/11/2018 | ELECTRIC - TEMPORARY SERVICE | TVALENC1 | Approved | IVRS - Inspection :* |
01/11/2018 | U VALUE FOR WINDOW | TVALENC1 | Approved | IVRS - Inspection :* |
01/11/2018 | STUCCO MESH | TVALENC1 | Approved | IVRS - Inspection :* |
01/11/2018 | ROOF NAILING | TVALENC1 | Approved | IVRS - Inspection :* |
01/11/2018 | EXT METAL CLIPS/EXT SHEATHING | TVALENC1 | Approved | IVRS - Inspection :* |
01/29/2018 | HEALTH DEPT - FINAL 724-7908 | PRISCILLA | Approved | |
02/02/2018 | FIRE - FINAL | JPEELDAVIS | Approved | |
02/02/2018 | FIRE - ALARM FINAL | JPEELDAVIS | Approved | |
02/02/2018 | FIRE - KITCHEN EXH HOOD FINAL | JPEELDAVIS | Approved | |
02/02/2018 | FIRE SPKLR - FINAL | JPEELDAVIS | Approved | |
02/09/2018 | ENGINEERING - FINAL | DROBERTS | Approved | ALL REMAINING ITEMS WILL BE CHECKED WITH THE DEVELOPMENT PACKAGE |
02/09/2018 | PLUMBING - FINAL | TVALENC1 | Approved | |
02/09/2018 | BUILDING - FINAL | TVALENC1 | Approved | |
02/09/2018 | CERTIFICATE OF OCCUPANCY | TVALENC1 | Approved | |
02/09/2018 | ELECTRIC - OUTDOOR LIGHTING | TVALENC1 | Approved | |
02/09/2018 | OUTDOOR LIGHTING FINAL | TVALENC1 | Approved | |
02/09/2018 | MECHANICAL - FINAL | TVALENC1 | Approved | |
02/09/2018 | PLUMBING - MEDICAL GAS/FINAL | RSHERRY | Approved | REVIEW OF MEDICAL GAS TEST REPORT COMPLETE |
02/09/2018 | ELECTRIC - FINAL | TVALENCIA | Approved |