Inspection History: EXCAVATION/LAYOUT REBAR & ZON

Permit Number - T16CM08161

Inspection Description - EXCAVATION/LAYOUT REBAR & ZON

Inspection Status - Approved

Date Description Inspector Results Comments
11/16/2017 EXCAVATION/LAYOUT REBAR & ZON Approved IVRS - Inspection :*
11/15/2017 EXCAVATION/LAYOUT REBAR & ZON Partial Approval N. PATIO WALL FOOTING AND MONUMENT SIGN FOOTING OK
11/02/2017 EXCAVATION/LAYOUT REBAR & ZON Partial Approval IVRS - Inspection :*
11/01/2017 EXCAVATION/LAYOUT REBAR & ZON Not ready for Inspection IVRS - Inspection :*
03/30/2017 EXCAVATION/LAYOUT REBAR & ZON Partial Approval 1- STEEL REBAR MATS ARE OKAY FOR BLDG. (A) AT GRID 11.2 AND S, AND FOR BLDG. (C) GRID V AND 7.
03/21/2017 EXCAVATION/LAYOUT REBAR & ZON Partial Approval 1- STEEL REBAR FOR THE ELEVATOR FOUNDATION WALL IS OKAY FOR CONCRETE.
03/20/2017 EXCAVATION/LAYOUT REBAR & ZON Partial Approval 1- STEEL REBAR FOR THE ELEVATOR SHAFT IS OKAY.
03/14/2017 EXCAVATION/LAYOUT REBAR & ZON Partial Approval 1- STEEL REBAR FOR FOOTINGS IN BLDG. (A) AND BLDG. (D) ARE OKAY FORCONCRETE AS NOTED ON THE PLANS.
03/10/2017 EXCAVATION/LAYOUT REBAR & ZON Partial Approval
03/09/2017 EXCAVATION/LAYOUT REBAR & ZON Partial Approval BLDG C LARGE FOOTING AT GRID LINE B1 IS OK.
03/08/2017 EXCAVATION/LAYOUT REBAR & ZON Partial Approval BLDG C LARGE FOOTING AT GRID LINE H IS OK.
BLDG B LARGE FOOTING AT GRID LINE DD IS OK.
BLDG. D 2 FOOTINGS AT GRID LINE 4-T & Q.
03/06/2017 EXCAVATION/LAYOUT REBAR & ZON Partial Approval OK TO POUR COLUMN FOOTINGS REMAINDER OF BLDG A, 2 LARGE CONTINUOUS FOOTINGS AT A, ALL SMALL FOOTINGS IN B & C, 2 LARGE FOOTINGS AT C.
03/03/2017 EXCAVATION/LAYOUT REBAR & ZON Partial Approval AREA C OK TO POUR COLUMNFOOTINGS FROM GRID LINE P TO A EXCEPT AT 3-CF10.
03/01/2017 EXCAVATION/LAYOUT REBAR & ZON Partial Approval AREA A OK TO POUR 40 COLUMN FOOTINGS. STILL NEED TO SEE 2 LARGE FOOTINGS AND ELEVATOR FOOTING AREA A.