Inspection Status: Approved
Inspection History: EXCAVATION/LAYOUT REBAR & ZON
Permit Number - T16CM08161
Inspection Description - EXCAVATION/LAYOUT REBAR & ZON
Inspection Status - Approved
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
11/16/2017 | EXCAVATION/LAYOUT REBAR & ZON | Approved | IVRS - Inspection :* | |
11/15/2017 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | N. PATIO WALL FOOTING AND MONUMENT SIGN FOOTING OK | |
11/02/2017 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | IVRS - Inspection :* | |
11/01/2017 | EXCAVATION/LAYOUT REBAR & ZON | Not ready for Inspection | IVRS - Inspection :* | |
03/30/2017 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | 1- STEEL REBAR MATS ARE OKAY FOR BLDG. (A) AT GRID 11.2 AND S, AND FOR BLDG. (C) GRID V AND 7. | |
03/21/2017 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | 1- STEEL REBAR FOR THE ELEVATOR FOUNDATION WALL IS OKAY FOR CONCRETE. | |
03/20/2017 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | 1- STEEL REBAR FOR THE ELEVATOR SHAFT IS OKAY. | |
03/14/2017 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | 1- STEEL REBAR FOR FOOTINGS IN BLDG. (A) AND BLDG. (D) ARE OKAY FORCONCRETE AS NOTED ON THE PLANS. | |
03/10/2017 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | ||
03/09/2017 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | BLDG C LARGE FOOTING AT GRID LINE B1 IS OK. | |
03/08/2017 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | BLDG C LARGE FOOTING AT GRID LINE H IS OK. BLDG B LARGE FOOTING AT GRID LINE DD IS OK. BLDG. D 2 FOOTINGS AT GRID LINE 4-T & Q. |
|
03/06/2017 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | OK TO POUR COLUMN FOOTINGS REMAINDER OF BLDG A, 2 LARGE CONTINUOUS FOOTINGS AT A, ALL SMALL FOOTINGS IN B & C, 2 LARGE FOOTINGS AT C. | |
03/03/2017 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | AREA C OK TO POUR COLUMNFOOTINGS FROM GRID LINE P TO A EXCEPT AT 3-CF10. | |
03/01/2017 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | AREA A OK TO POUR 40 COLUMN FOOTINGS. STILL NEED TO SEE 2 LARGE FOOTINGS AND ELEVATOR FOOTING AREA A. |