Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - ABOVE CEILING
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 08/29/2017 | PLUMBING - ABOVE CEILING | Approved | 1- RAIN WATER CONDUCTORS WATER TEST PROVIDED IN AREA (C) SOUTH AND THE CANOPY. 2- DWV WATER TEST PROVIDED IN AREA (C) SOUTH 1ST AND 2ND FLOORS ONLY. 3- DOMESTIC WATER AIR TEST PROVIDED IN AREA (C) SOUTH ABOVE CEILING AND IN WALL 1ST AND 2ND FLOORS ONLY |
|
| 08/24/2017 | PLUMBING - ABOVE CEILING | Partial Approval | 1- DWV WATER TEST PROVIDED FOR THE 2- OVERHEAD AND IN WALL DOMESTIC WATER DISTRIBUTION IN OKAY 1ST AND 2ND FLOOR NORTH SECTION OF CORRIDOOR AREA (C) ONLY. |