Permit: T16CM03364
Permit Details
Apply Date:
05/05/2016
Applicant:
CARHUFF, PHILIP ANDREW
Description:
RESTAURANT
Architects:
- CARHUFF, PHILIP ANDREW
Contractors:
- MARCON EXCAVATING AND CONSTRUCTION INC
Permit Reviews
Permit Number - T16CM03364
Permit Status: C of o
Permit Description: RESTAURANT
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
05/05/2016 | PLANS OK TO SUBMIT - 3RD PARTY | 05/05/2016 | COMPLETED |
05/05/2016 | 3RD PARTY REVIEW - COMMERCIAL | 06/15/2016 | COMPLETED |
06/15/2016 | 3RD PARTY REVIEW - COMMERCIAL | 06/15/2016 | COMPLETED |
07/22/2016 | 3RD PARTY REVIEW - REVISION/OTHER | 09/09/2016 | COMPLETED |
10/04/2016 | 3RD PARTY REVIEW - REVISION/OTHER | 10/20/2016 | COMPLETED |
Outstanding Activity Conditions
Permit Number - T16CM03364
Permit Status: C of o
Permit Description: RESTAURANT
Total Outstanding Activity Conditions - 1
Date | Name |
---|---|
05/05/2016 | PLANS EXPIRE IN 180 DAYS FROM DATE OF SUBMITTAL. PERMITS EXPIRE IN 180 DAYS FROM DATE OF ISSUE OR LAST INSPECTION. |
Completed Inspections
Permit Status: C of o
Permit Number: T16CM03364
Permit Description: RESTAURANT
Total Completed Inspections - 47
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
06/21/2016 | STEM WALL/RETAINING WALL | Ingram | Approved | |
06/30/2016 | ELECTRIC - UNDERGROUND | BSTEVENS | Approved | |
07/06/2016 | SITE - SEWER | BSTEVENS | Approved | |
07/13/2016 | EXCAVATION/LAYOUT REBAR & ZON | BSTEVENS | Approved | OK TO POUR WALLS AT EAST SIDE RAMP. |
09/12/2016 | ROOF NAILING | BRUCE_S | Approved | |
09/12/2016 | EXT METAL CLIPS/EXT SHEATHING | BRUCE_S | Approved | |
10/18/2016 | STUCCO MESH | BRUCE_S | Approved | |
10/22/2016 | PLUMBING - ROUGH, SOIL | BSTEVENS | Approved | |
10/28/2016 | ELECTRIC - CABLE DROP | BSTEVENS | Approved | |
10/31/2016 | TEP CLEARANCE - AM | BSTEVENS | Approved | INCR |
11/15/2016 | MECHANICAL - HOODS | BSTEVENS | Approved | |
11/15/2016 | ELECTRIC - INTERMEDIATE | BSTEVENS | Approved | |
11/22/2016 | NPPO - FINAL | DROBERTS | Approved | |
11/22/2016 | SIGN - FINAL | DROBERTS | Approved | |
11/23/2016 | ENGINEERING - FINAL | DROBERTS | Approved | |
11/23/2016 | RIGHT OF WAY - FINAL | drobertson | Approved | |
11/23/2016 | MECHANICAL - FINAL | BSTEVENS | Approved | FIRST FLOOR ONLY IS APPROVED, SECOND FLOOR AND KITCHEN AREA ARE TO REMAIN SEPERATED FROM THE CUSTOMER AREAS UNTIL FULL C OF O IS ISSUED. I RECOMEND THAT A TEMP C OF O BE ISSUED FOR OPENING ON WEEKENDS ONLY UNTIL CONSTRUCTION IS COMPLETE ON REMAINDER OF BUILDING. |
11/23/2016 | ENGINEERING - FINAL | DROBERTS | Approved | WENT OUT TO THE SITE AND CHECKED THE HEIGHT OF THE RISE FROM LANDING TO LANDING. THE HEIGHT DIFFERENCE BETWEEN THE LANDINGS ON AVERAGE IS 28 TO 29 INCHES, NOTHING APPEARS TO EXCEED THE 30 INCH MAX. THE SITE IS STILL DENIED AT THIS TIME AND WILL BE LOOKED AT BY THE BUILDING FINAL INSPECTOR AND THE BUILDING OFFICIAL. |
11/23/2016 | ELECTRIC - TEMPORARY SERVICE | BSTEVENS | Approved | |
11/23/2016 | ELECTRIC - CONSTRUCTION POWER | BSTEVENS | Approved | |
11/23/2016 | ELECTRIC - SERVICE UPGRADE | BSTEVENS | Approved | |
11/23/2016 | MECHANICAL - HOOD SYSTEMS | BSTEVENS | Approved | |
11/23/2016 | MECHANICAL - ABOVE CEILING | BSTEVENS | Approved | |
11/23/2016 | MECHANICAL - INTERMEDIATE | BSTEVENS | Approved | |
11/23/2016 | MECHANICAL - UNDERGROUND | BSTEVENS | Approved | |
11/23/2016 | PLUMBING - GAS PRESS TEST FNL | BSTEVENS | Approved | |
11/23/2016 | PLUMBING - GAS PRESSURE TEST | BSTEVENS | Approved | |
11/23/2016 | PLUMBING - ROOF DRAINS | BSTEVENS | Approved | |
11/23/2016 | PLUMBING - ABOVE CEILING | BSTEVENS | Approved | |
11/23/2016 | PLUMBING - INTERMEDIATE | BSTEVENS | Approved | |
11/23/2016 | OUTDOOR LIGHTING FINAL | BSTEVENS | Approved | |
11/23/2016 | ELECTRIC - PROGRESS | BSTEVENS | Approved | |
11/23/2016 | ELECTRIC - OUTDOOR LIGHTING | BSTEVENS | Approved | |
11/23/2016 | ELECTRIC - ABOVE CEILING | BSTEVENS | Approved | |
11/23/2016 | ELECTRIC - UFER | BSTEVENS | Approved | |
11/23/2016 | BUILDING - PROGRESS | BSTEVENS | Approved | |
11/23/2016 | SHEET ROCK NAILING | BSTEVENS | Approved | |
11/23/2016 | U VALUE FOR WINDOW | BSTEVENS | Approved | |
11/23/2016 | BUILDING ABOVE CEILING | BSTEVENS | Approved | |
11/23/2016 | FRAMING | BSTEVENS | Approved | |
11/23/2016 | REINFORCED MASONRY PRE-GROUT | BSTEVENS | Approved | |
11/23/2016 | BUILDING PRE-SLAB | BSTEVENS | Approved | |
11/23/2016 | LANDSCAPE - FINAL | DROBERTS | Approved | UNABLE TO VERIFY ON THE PLANS THAT THIS SITE IS NOT REQUIRED LANDSCAPING AT THIS TIME, WILL LOOK AT THE PLANS PRIOR TO RETURNING TOMORROW. |
12/29/2016 | BUILDING - FINAL | BSTEVENS | Approved | RECOMEND TCO BE EXTENDED TO INCLUDE SECOND FLOOR. (THIS NOTE WAS ADDED ON 6/29/17 BY BSTEVENS BASED ON INSPECTION REPORT FROM 12/29/16.) |
12/29/2016 | FIRE - FINAL | jvincent | Approved | TCO approved for entire bldg. Need the following before fire final approved: 1) Obtain operational permit for an assembly. 2) Obtain an operational permit for CO2 since your over 100lbs. Also will require a CO2 alarm or ventilation. |
12/29/2016 | PLUMBING - FINAL | BSTEVENS | Approved | OK TO EXTEND TCO TO INCLUDE THE SECOND FLOOR CUSTOMER AREA. |
12/29/2016 | ELECTRIC - FINAL | BSTEVENS | Approved | OK TO EXTEND TCO TO INCLUDE THE SECOND FLOOR CUSTOMER AREA. |