Inspection History Details
Inspection Status: Approved
Inspection History: FIRE - FINAL
Permit Number - T16CM03364
Inspection Description - FIRE - FINAL
Inspection Status - Approved
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
01/17/2019 | FIRE - FINAL | Approved | All items checked off list. | |
12/29/2016 | FIRE - FINAL | Partial Approval | TCO approved for entire bldg. Need the following before fire final approved: 1) Obtain operational permit for an assembly. 2) Obtain an operational permit for CO2 since your over 100lbs. Also will require a CO2 alarm or ventilation. |
|
12/23/2016 | FIRE - FINAL | Partial Approval | See all previous notes. I was there today for alarm final on 2nd floor. They will be calling in for fire final next week. Some items I noticed during alarm final. Check EM lights, painted heads on 2nd floor, mount extinguishers, remove 2nd lock from panic hardware exit door, need operational permit for assembly, verify CO2 amounts, post occupant load sign. | |
12/02/2016 | FIRE - FINAL | Partial Approval | 1. Ok to occupy and cook on 1st floor and basement. 2. Resubmittal of Kitchen Hood Plans required. 3. 2nd floor to be partitioned off for no access to the public and remain a construction zone until completed. |
|
11/23/2016 | FIRE - FINAL | Partial Approval | Fire is okay with a Temporary C of O for the 1st floor only. Basement and upstairs shall be closed off an not accessible by public with the exception of the rear exit stairwell. All exits shall remain clear. A maximum occupant load of 60 for the outside and 200 for the inside shall be posted. |