Start Date | Submittal | Complete Date | Status |
---|---|---|---|
01/16/2015 | RESUBMITTAL | 02/13/2015 | COMPLETED |
02/13/2015 | RESUBMITTAL | 05/27/2015 | COMPLETED |
05/27/2015 | RESUBMITTAL | 06/23/2015 | COMPLETED |
07/30/2015 | REVISION - - 1ST | 07/30/2015 | COMPLETED |
07/30/2015 | REVISION - - 1ST | 09/08/2015 | COMPLETED |
10/23/2015 | REVISION - - 2ND | 10/26/2015 | COMPLETED |
11/06/2014 | PLANS OK TO SUBMIT - COMM | 11/06/2014 | COMPLETED |
11/06/2014 | COMMERCIAL - NEW | 01/16/2015 | COMPLETED |
12/01/2015 | REVISION - - 3RD | 12/02/2015 | COMPLETED |
12/23/2015 | REVISION - - 4TH | 12/31/2015 | COMPLETED |
Outstanding Activity Conditions
Permit Number - T14CM07567
Permit Status: C of o
Permit Description: RETAIL
Total Outstanding Activity Conditions - 1
Date | Name |
---|---|
11/06/2014 | PLANS EXPIRE IN 180 DAYS FROM DATE OF SUBMITTAL. PERMITS EXPIRE IN 180 DAYS FROM DATE OF ISSUE OR LAST INSPECTION. |
Completed Inspections
Permit Status: C of o
Permit Number: T14CM07567
Permit Description: RETAIL
Total Completed Inspections - 46
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
02/13/2015 | ZONING - FINAL | jgreen | Approved | Recordation information for both the new 15-foot water easement and the 1-foot no access easmeent is required prior to building CoO. Recordation information needs to be submitted to either Jason Green (837-4929) or David Rivera (837-4957). |
08/24/2015 | EXCAVATION/LAYOUT REBAR & ZON | MRAMBER | Approved | 1. FOOTERS AT GAS CANOPY OK 2. SOUTH WALL, EAST OF TEMP ENTRY, 3RD LIFT OK, EXCEPT MAIN DOOR 3. EAST WALL SOUTH OF DOCK OK. SOUTH WALL ABOVE DECK OK. EAST WALL ??? OF DECK EXCEPT SHORT (??) |
09/04/2015 | PLUMBING - ROUGH, SOIL | MRAMBER | Approved | IVRS - Inspection :* |
09/16/2015 | PLUMBING - GAS PRESSURE TEST | MRAMBER | Approved | IVRS - Inspection :* |
09/25/2015 | PLUMBING - INTERMEDIATE | JBURGE | Approved | IVRS - Inspection :* |
09/25/2015 | ELECTRIC - INTERMEDIATE | JBURGE | Approved | IVRS - Inspection :* |
09/25/2015 | FRAMING | JBURGE | Approved | IVRS - Inspection :* |
09/30/2015 | BUILDING - PROGRESS | JBURGE | Approved | ANCHOR BOLTS FOR MAIN ENTRY AREA AND DRIVE THROUGH AT PHARMACY |
10/14/2015 | PLUMBING - YARD WTR LINE/TEST | MRAMBER | Approved | IVRS - Inspection :* |
10/28/2015 | FIRE SPKLR - UG PIPING FLUSH | CSCHULTZ | Approved | |
11/04/2015 | PLUMBING - PROGRESS | TVALENC1 | Approved | IVRS - Inspection :* |
11/06/2015 | FIRE SPKLR - UG, PIPING, HYDRO | NSPRENGER | Approved | |
11/09/2015 | GAS CLEARANCE | MRAMBER | Approved | |
11/12/2015 | PLUMBING - ABOVE CEILING | MRAMBER | Approved | IVRS - Inspection :* |
11/12/2015 | ELECTRIC - TEMPORARY SERVICE | MRAMBER | Approved | IVRS - Inspection :* |
11/12/2015 | ELECTRIC - ABOVE CEILING | MRAMBER | Approved | IVRS - Inspection :* |
11/18/2015 | MECHANICAL - HOODS | MRAMBER | Approved | SMOKE TEST ON HOOD OK |
11/18/2015 | MECHANICAL - ABOVE CEILING | MRAMBER | Approved | IVRS - Inspection :* |
11/24/2015 | MECHANICAL - FINAL | MRAMBER | Approved | IVRS - Inspection :* |
11/24/2015 | ELECTRIC - FINAL | MRAMBER | Approved | IVRS - Inspection :* |
11/25/2015 | BUILDING - FINAL | MRAMBER | Approved | ALL LIFE SAFETY ISSUES HAVE BEEN SEEN FOR T.C.O FIRE HAS APPROVED T.C.O. BLDG T.C.O. OK TO STOCK AND SET UP SHELVING ONLY PENDING ENGINEERING APPROVAL |
12/14/2015 | ELECTRIC - UNDERGROUND | MRAMBER | Approved | IVRS - Inspection :* |
12/14/2015 | SHEET ROCK NAILING | MRAMBER | Approved | IVRS - Inspection :* |
12/14/2015 | STEM WALL/RETAINING WALL | MRAMBER | Approved | IVRS - Inspection :* |
12/14/2015 | REINFORCED MASONRY PRE-GROUT | MRAMBER | Approved | IVRS - Inspection :* |
12/14/2015 | BUILDING PRE-SLAB | MRAMBER | Approved | IVRS - Inspection :* |
12/15/2015 | SITE - SEWER | mramber | Approved | |
12/15/2015 | PLUMBING - SEWER HCS CONNECT | mramber | Approved | |
12/15/2015 | FIRE - ALARM FINAL | nsprenger | Approved | |
12/15/2015 | PLUMBING - FINAL | MRAMBER | Approved | IVRS - Inspection :* |
12/18/2015 | FIRE - KITCHEN EXH HOOD FINAL | CBASALDUA | Approved | |
12/30/2015 | FIRE SPKLR - OH PIPING & HYDRO | C.SCHULTZ | Approved | SPRINKLER HEAD LOCATION ISSUE RESOLVED. TCO OK FOR STOCKING ONLY - 11-20-15 |
12/30/2015 | ENGINEERING - FINAL | LEDONNE | Approved | GRADING OK WITH TCO FOR STOCKING ONLY - 11/25/15 |
01/05/2016 | MECHANICAL - INTERMEDIATE | MRAMBER | Approved | IVRS - Inspection :* |
01/05/2016 | OUTDOOR LIGHTING FINAL | MRAMBER | Approved | IVRS - Inspection :* |
01/05/2016 | ELECTRIC - CABLE DROP | MRAMBER | Approved | IVRS - Inspection :* |
01/05/2016 | U VALUE FOR WINDOW | MRAMBER | Approved | IVRS - Inspection :* |
01/05/2016 | BUILDING ABOVE CEILING | MRAMBER | Approved | IVRS - Inspection :* |
01/05/2016 | FIRE SPKLR - FINAL | jvincent | Approved | |
01/05/2016 | FIRE - HYDRANTS | jvincent | Approved | |
01/12/2016 | NPPO - FINAL | DROBERTS | Approved | |
01/12/2016 | SIGN - FINAL | DROBERTS | Approved | |
02/16/2016 | LANDSCAPE - FINAL | DROBERTS | Approved | |
02/25/2016 | HEALTH DEPT - FINAL 724-7908 | ctrevil | Approved | |
02/25/2016 | FIRE - FINAL | jvincent | Approved | final approved. will add lock box to front door area and include keys to building. will call to place keys. |
02/26/2016 | RIGHT OF WAY - FINAL | DRUSSELL | Approved |