Inspection History Details
Inspection Status: Approved
Inspection History: ENGINEERING - FINAL
Permit Number - T14CM07567
Inspection Description - ENGINEERING - FINAL
Inspection Status - Approved
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
02/16/2016 | ENGINEERING - FINAL | Approved | ||
02/12/2016 | ENGINEERING - FINAL | Partial Approval | COMPLETE ALL AREAS AS PREVIOUSLY NOTED, THIS WILL INCLUDE THE INSTALLATION OF THE BARRIER RAIL IN THE SOUTH WEST QUADRANT OF THE SITE SOUTH OF THE FUEL ISLANDS AROUND THE BASIN. | |
01/12/2016 | ENGINEERING - FINAL | Partial Approval | COMPLETE THE INSTALLATION OF ALL SAFETY FENCES, AND CURBING, CLEANING OF THE SITE, AND COMPLETE THE PAVEMENT WORK ON TUCSON BLVD. COMPLETE THE PLACEMENT OF ALL LANDSCAPE MATERIAL WITHIN THE PARKING LOT LIMITS. | |
01/11/2016 | ENGINEERING - FINAL | Not ready for Inspection | COMPLETE THE INSTALLATION OF ALL SAFETY FENCES, AND CURBING, CLEANING OF THE SITE, AND COMPLETE THE PAVEMENT WORK ON TUCSON BLVD. COMPLETE THE PLACEMENT OF ALL LANDSCAPE MATERIAL WITHIN THE PARKING LOT LIMITS. | |
01/08/2016 | ENGINEERING - FINAL | Not ready for Inspection | COMPLETE ALL THE ITEMS AS SHOWN ON THE APPROVED PLANS | |
01/06/2016 | ENGINEERING - FINAL | Not ready for Inspection | COMPLETE ALL THE ITEMS AS SHOWN ON THE APPROVED PLANS | |
12/30/2015 | ENGINEERING - FINAL | Partial Approval | GRADING OK WITH TCO FOR STOCKING ONLY - 11/25/15 | |
11/23/2015 | ENGINEERING - FINAL | Continued | THE SITE IS NOT READY AT THIS TIME FOR THE TCO, BUT WILL BE READY BY THE MIDDLE OF NEXT WEEK. |