Permit: T14CM07150
Permit Details
Apply Date:
10/23/2014
Applicant:
YOUSEY, EARL CHARLES IV
Description:
ADD SECOND LEVEL WITH ROOF DECK OVER MASTER BEDROOM R1-MODIFY STAIR CASE, REAR DECK, RELOCATE BATHRM R2: RELOCATE BATH DOOR R3: NEW HVAC AT 2ND FLOOR
Architects:
- YOUSEY, EARL CHARLES IV
Contractors:
- TUHAVI CORPORATION
Permit Reviews
Permit Number - T14CM07150
Permit Status: Final
Permit Description: ADD SECOND LEVEL WITH ROOF DECK OVER MASTER BEDROOM
R1-MODIFY STAIR CASE, REAR DECK, RELOCATE BATHRM
R2: RELOCATE BATH DOOR
R3: NEW HVAC AT 2ND FLOOR
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 04/16/2015 | RESIDENTIAL - BLDG/ZONING-WALKTHRU | 04/16/2015 | COMPLETED |
| 04/16/2015 | RESIDENTIAL - BLDG/WWM | 05/18/2015 | COMPLETED |
| 06/17/2015 | RESUBMITTAL | 06/22/2015 | COMPLETED |
| 09/04/2015 | REVISION - - 1ST | 09/29/2015 | COMPLETED |
| 09/05/2015 | REVISION - - 1ST | 09/05/2015 | COMPLETED |
| 09/29/2015 | REVISION - - 2ND | 10/07/2015 | COMPLETED |
| 10/07/2015 | REVISION - - 3RD | 10/07/2015 | COMPLETED |
| 10/23/2014 | RESIDENTIAL - BLDG/ZONING-WALKTHRU | 04/16/2015 | COMPLETED |
Outstanding Activity Conditions
Permit Number - T14CM07150
Permit Status: Final
Permit Description: ADD SECOND LEVEL WITH ROOF DECK OVER MASTER BEDROOM
R1-MODIFY STAIR CASE, REAR DECK, RELOCATE BATHRM
R2: RELOCATE BATH DOOR
R3: NEW HVAC AT 2ND FLOOR
Total Outstanding Activity Conditions - 1
| Date | Name |
|---|---|
| 10/23/2014 | PLANS EXPIRE IN 180 DAYS FROM DATE OF SUBMITTAL. PERMITS EXPIRE IN 180 DAYS FROM DATE OF ISSUE OR LAST INSPECTION. |
Completed Inspections
Permit Status: Final
Permit Number: T14CM07150
Permit Description: ADD SECOND LEVEL WITH ROOF DECK OVER MASTER BEDROOM
R1-MODIFY STAIR CASE, REAR DECK, RELOCATE BATHRM
R2: RELOCATE BATH DOOR
R3: NEW HVAC AT 2ND FLOOR
Total Completed Inspections - 14
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 09/01/2015 | PLUMBING - ROUGH, SOIL | BSTEVENS | Approved | |
| 10/05/2015 | ROOF NAILING | DQUINN | Approved | |
| 10/08/2015 | PLUMBING - INTERMEDIATE | DQUINN | Approved | |
| 10/08/2015 | MECHANICAL - INTERMEDIATE | DQUINN | Approved | |
| 10/08/2015 | EXCAVATION/LAYOUT REBAR & ZON | DQUINN | Approved | |
| 10/19/2015 | ELECTRIC - INTERMEDIATE | BSTEVENS | Approved | |
| 10/19/2015 | U VALUE FOR WINDOW | BSTEVENS | Approved | |
| 10/19/2015 | STUCCO MESH | BSTEVENS | Approved | |
| 10/19/2015 | FRAMING | BSTEVENS | Approved | |
| 11/24/2015 | BUILDING - FINAL | BSTEVENS | Approved | |
| 11/24/2015 | ELECTRIC - FINAL | BSTEVENS | Approved | |
| 11/24/2015 | PLUMBING - GAS PRESSURE TEST | BSTEVENS | Approved | |
| 11/24/2015 | PLUMBING - FINAL | BSTEVENS | Approved | |
| 11/24/2015 | MECHANICAL - FINAL | BSTEVENS | Approved |