Permit: T13CM00975
Permit Details
Apply Date:
02/20/2013
Applicant:
ADVANTECH FACILITY DESIGN INC
Description:
LABORATORY
Contractors:
- LLOYD CONSTRUCTION COMPANY INC ,
Permit Reviews
Permit Number - T13CM00975
Permit Status: C of o
Permit Description: LABORATORY
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
02/20/2013 | PLANS OK TO SUBMIT - COMM | 02/20/2013 | COMPLETED |
02/20/2013 | COMMERCIAL - TI | 03/28/2013 | COMPLETED |
04/05/2013 | RESUBMITTAL | 05/08/2013 | COMPLETED |
05/08/2013 | RESUBMITTAL | 05/09/2013 | COMPLETED |
06/27/2013 | REVISION - - 1ST | 07/03/2013 | COMPLETED |
07/03/2013 | REVISION - - 1ST | 07/09/2013 | COMPLETED |
08/26/2013 | REVISION - - 2ND | 08/28/2013 | COMPLETED |
10/21/2013 | REVISION - - 3RD | 11/06/2013 | COMPLETED |
11/18/2013 | REVISION - - 3RD | 11/18/2013 | COMPLETED |
Outstanding Activity Conditions
Permit Number - T13CM00975
Permit Status: C of o
Permit Description: LABORATORY
Total Outstanding Activity Conditions - 1
Date | Name |
---|---|
02/20/2013 | PLANS EXPIRE IN 180 DAYS FROM DATE OF SUBMITTAL. PERMITS EXPIRE IN 180 DAYS FROM DATE OF ISSUE OR LAST INSPECTION. |
Completed Inspections
Permit Status: C of o
Permit Number: T13CM00975
Permit Description: LABORATORY
Total Completed Inspections - 44
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
05/29/2013 | ELECTRIC - UFER | MRAMBER | Approved | IVRS - Inspection :* |
06/18/2013 | REINFORCED MASONRY PRE-GROUT | MRAMBER | Approved | TOP-OUT AT EAST EXPANSION - OK TO GROUT |
06/18/2013 | REINFORCED MASONRY PRE-GROUT | MRAMBER | Approved | IVRS - Inspection :* |
06/21/2013 | SHEET ROCK NAILING | MRAMBER | Approved | A.W. ROUGH COMPLETE |
06/21/2013 | SHEET ROCK NAILING | MRAMBER | Approved | IVRS - Inspection :* |
07/11/2013 | EXCAVATION/LAYOUT REBAR & ZON | MRAMBER | Approved | IVRS - Inspection :* |
07/16/2013 | ELECTRIC - INTERMEDIATE | MRAMBER | Approved | AREA "B" OK TO COVER |
07/16/2013 | ELECTRIC - INTERMEDIATE | MRAMBER | Approved | IVRS - Inspection :* |
07/17/2013 | FRAMING | MRAMBER | Approved | IVRS - Inspection :* |
08/14/2013 | PLUMBING - ROUGH, SOIL | MRAMBER | Approved | IVRS - Inspection :* |
08/14/2013 | PLUMBING - ROUGH, SOIL | MRAMBER | Approved | IVRS - Inspection :* |
08/16/2013 | MECHANICAL - INTERMEDIATE | MRAMBER | Approved | MINEROLOGY OPEN OFFICES ALL ABOVE CEILING OK - OK TO COVER |
08/19/2013 | PLUMBING - INTERMEDIATE | RCAMACHO | Approved | IVRS - Inspection :* |
09/03/2013 | PLUMBING - GAS PRESSURE TEST | MRAMBER | Approved | IVRS - Inspection :* |
09/13/2013 | FIRE - FINAL | wmotto | Approved | 1. ok to occupy phase one only. 2. sprinkler placemet is ok in phase one water flow was tested and passed tampers not online although they are chained open. 3. move handicap sign away from fdc 4. emergency lights tested and passed in phase one |
09/24/2013 | MECHANICAL - ABOVE CEILING | MRAMBER | Approved | IVRS - Inspection :* |
09/24/2013 | PLUMBING - ABOVE CEILING | MRAMBER | Approved | IVRS - Inspection :* |
09/24/2013 | ELECTRIC - ABOVE CEILING | MRAMBER | Approved | IVRS - Inspection :* |
09/24/2013 | BUILDING ABOVE CEILING | MRAMBER | Approved | IVRS - Inspection :* |
09/30/2013 | BUILDING - FINAL | MRAMBER | Approved | ANALYTICAL AND DEVELOPMENT SHOWS NO LIFE SAFETY ISSUES, THIS WOULD BE PHASE 2. OK TEMP C.O. |
09/30/2013 | MECHANICAL - FINAL | MRAMBER | Approved | IVRS - Inspection :* |
09/30/2013 | PLUMBING - FINAL | MRAMBER | Approved | IVRS - Inspection :* |
09/30/2013 | ELECTRIC - FINAL | MRAMBER | Approved | IVRS - Inspection :* |
09/30/2013 | BUILDING - FINAL | MRAMBER | Approved | IVRS - Inspection :* |
10/16/2013 | FIRE - ALARM FINAL | CSCHULTZ | Approved | Only tested horns/strobes throughout building with system activated, with plans check all placement of pull stations, horns/strobes. Found 1 bad horn/strobe this was replaced during testing. Still need to test all Saphires and dry-piping systems, tampers, flows, phone lines, battery loss, ground fault, missing devices, heats, duct smokes and smokes. When testing the first Saphire system the following was found and all others are the same: 1. Need signs post per IFC and Saphire requirements i. e. on entry door over pull station etc. 2. When the Saphire system was activated the main alarm horns/strobes were bypass - only a blue color strobe was inside the Saphire room no horn, you will need to have a horn for the Saphire system that is different them the main fire alarm system and has a count down and activated sound. 3. Will need to have an air loss calculation test done on the rooms were the Saphire are installed. 4. All ceiling tiles in Saphire rooms need to be tied down 5. All doors going in and out of the Saphire rooms need to be self-closing and latching 6. Need to change out all pull stations to the Saphire systems or install a sign above the pull stations, ID then as Saphire system cannot use a fire alarm pull station only this will be very confusing to people. |
10/16/2013 | FIRE SPKLR - FINAL | CSCHULTZ | Approved | 1. Analytical Lab shower need sprinkler coverage X2 2. Chem storage room correct coverage 8' 6" off wall 3. Mineralogy - high grade room correct sprinkler coverage 8' 6" off wall 4. Mineralogy - Mid grade room correct sprinkler coverage 8' 6" off wall 5. In corridor (on plans S-46 next to personnel space, submittal office, supervisor office) correct sprinkler coverage 6. Mineralogy north correct sprinkler coverage in shower 7. East corridor area C (by Qemscam rm, Util Chase rm, XRD Lab rm) correct sprinkler coverage heads 20' feet apart 8. Hydro test all new piping installed for the dry system for 2 hours at 200 PSI. |
01/24/2014 | PLUMBING - PROGRESS | MRAMBER | Approved | ACIDIC/CAUSTIC LIQUID TRANSER PIPING INNER AND OUTER SLEEVES - PRESS TEST OK |
01/24/2014 | PLUMBING - PROGRESS | MRAMBER | Approved | IVRS - Inspection :* |
03/11/2014 | ELECTRIC - TEMP POWER FOR TEST | MRAMBER | Approved | IVRS - Inspection :* |
03/11/2014 | ELECTRIC - PROGRESS | MRAMBER | Approved | IVRS - Inspection :* |
03/11/2014 | SITE - SEWER | MRAMBER | Approved | IVRS - Inspection :* |
03/11/2014 | PLUMBING - PRE SLAB | MRAMBER | Approved | IVRS - Inspection :* |
03/11/2014 | ELECTRIC - UNDERGROUND | MRAMBER | Approved | IVRS - Inspection :* |
03/11/2014 | BUILDING - PROGRESS | MRAMBER | Approved | IVRS - Inspection :* |
03/11/2014 | ELECTRIC - OUTDOOR LIGHTING | MRAMBER | Approved | IVRS - Inspection :* |
03/11/2014 | MECHANICAL - HOOD SYSTEMS | MRAMBER | Approved | IVRS - Inspection :* |
03/11/2014 | MECHANICAL - HOODS | MRAMBER | Approved | IVRS - Inspection :* |
03/18/2014 | RIGHT OF WAY - FINAL | MCASTRO | Approved | |
03/19/2014 | MECHANICAL - HYDRONIC PIPING | MRAMBER | Approved | IVRS - Inspection :* |
03/19/2014 | OUTDOOR LIGHTING FINAL | MRAMBER | Approved | IVRS - Inspection :* |
03/19/2014 | NPPO - FINAL | RLEDONNE | Approved | |
03/19/2014 | SIGN - FINAL | RLEDONNE | Approved | |
03/19/2014 | ENGINEERING - FINAL | RLEDONNE | Approved | |
03/19/2014 | LANDSCAPE - FINAL | RLEDONNE | Approved |