Permit: T13BU00255
Permit Details
Apply Date:
03/05/2013
Applicant:
KAZAL FIRE PROTECTION INC ,
Description:
Install 1011 fire sprinklers
Contractors:
- KAZAL FIRE PROTECTION INC ,
Outstanding Activity Conditions
Permit Number - T13BU00255
Permit Status: Final
Permit Description: Install 1011 fire sprinklers
Total Outstanding Activity Conditions - 1
Date | Name |
---|---|
03/05/2013 | PLANS EXPIRE IN 180 DAYS FROM DATE OF SUBMITTAL. PERMITS EXPIRE IN 180 DAYS FROM DATE OF ISSUE OR LAST INSPECTION. |
Completed Inspections
Permit Status: Final
Permit Number: T13BU00255
Permit Description: Install 1011 fire sprinklers
Total Completed Inspections - 2
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
12/18/2013 | FIRE SPKLR - FINAL | CSCHULTZ | Approved | Tested tapers and flow switches in the following areas: 1st floor tamper - passed Flow switch - 32.26 sec 2nd floor tamper - passed Flow switch - 40.81 sec 3rd floor tamper - passed Flow switch - 37.53 sec 4th floor tamper - passed Flow switch - 32.83 sec 5th floor tamper - passed Flow switch - 34.00 sec 6th floor tamper - passed Flow switch - 54.00 sec 7th floor tamper - passed Flow switch - 34.00 sec 1. 7th floor elevator lobby missing ceiling 2. Rm 708 bedroom ceiling 3. Rm 610 bathroom hole in wall 4. Rm 609 Painted head bedroom 5. 3rd floor by west stairwell heads blocked by led lights |
12/18/2013 | FIRE SPKLR - OH PIPING & HYDRO | CSCHULTZ | Approved |