Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit: T12CM00498
Permit Details
Apply Date:
02/17/2012
Applicant:
CARHUFF, PHILIP ANDREW
Description:
HIGH SCHOOL
Architects:
- CARHUFF, PHILIP ANDREW
- VOGEL, BENJAMIN ARMANDO
Contractors:
- BENJAMIN VOGEL ARCHITECT LLC
Permit Reviews
Permit Number - T12CM00498
Permit Status: C of o
Permit Description: HIGH SCHOOL
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
02/17/2012 | PLANS OK TO SUBMIT - COMM | 02/21/2012 | COMPLETED |
02/23/2012 | COMMERCIAL - NEW | 03/28/2012 | COMPLETED |
03/28/2012 | RESUBMITTAL | 06/14/2012 | COMPLETED |
05/07/2012 | REVISION - - 1ST | 09/07/2012 | COMPLETED |
09/07/2012 | REVISION - - 2ND | 10/03/2012 | COMPLETED |
10/03/2012 | REVISION - - 2ND | 10/17/2012 | COMPLETED |
10/17/2012 | OTHER | 10/17/2012 | COMPLETED |
Outstanding Activity Conditions
Permit Number - T12CM00498
Permit Status: C of o
Permit Description: HIGH SCHOOL
Total Outstanding Activity Conditions - 1
Date | Name |
---|---|
02/17/2012 | PLANS EXPIRE IN 180 DAYS FROM DATE OF SUBMITTAL. PERMITS EXPIRE IN 180 DAYS FROM DATE OF ISSUE OR LAST INSPECTION. |
Completed Inspections
Permit Status: C of o
Permit Number: T12CM00498
Permit Description: HIGH SCHOOL
Total Completed Inspections - 40
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
09/19/2012 | PLUMBING - ROUGH, SOIL | BBENEDON | Approved | IVRS - Inspection :* |
10/22/2012 | EXCAVATION/LAYOUT REBAR & ZON | JBURGE | Approved | IVRS - Inspection :* |
10/30/2012 | STEM WALL/RETAINING WALL | JBURGE | Approved | IVRS - Inspection :* |
11/05/2012 | PLUMBING - PRE SLAB | JBURGE | Approved | PLUMBING FOR WEST SLAB- OK TO COVER |
11/13/2012 | PLUMBING - INTERMEDIATE | JBURGE | Approved | PLUMBING PRE SLAB EAST SLAB |
11/13/2012 | BUILDING PRE-SLAB | JBURGE | Approved | EAST SLAB 1ST LEVEL OK TO POUR |
11/21/2012 | REINFORCED MASONRY PRE-GROUT | JBURGE | Approved | IVRS - Inspection :* |
05/02/2013 | TEP CLEARANCE - AM | JBURGE | Approved | ECO |
05/02/2013 | ELECTRIC - SERVICE UPGRADE | RMORENO | Approved | IVRS - Inspection :* |
05/02/2013 | ELECTRIC - SERVICE UPGRADE | RMORENO | Approved | IVRS - Inspection :* |
05/14/2013 | RIGHT OF WAY - FINAL | pwhiddon | Approved | Work not complete |
05/14/2013 | RIGHT OF WAY - FINAL | pwhiddon | Approved | |
05/14/2013 | NPPO - FINAL | MRUSSO | Approved | |
05/14/2013 | SIGN - FINAL | MRUSSO | Approved | |
05/14/2013 | LANDSCAPE - FINAL | MRUSSO | Approved | |
07/24/2014 | FIRE SPKLR - FINAL | CSCHULTZ | Approved | Plans and permits were approved by the AZ state fire marshall office, they did all of the fire sprinkler testing TFD just looked at the coverage no problems found at this time. |
07/24/2014 | FIRE - FINAL | CSCHULTZ | Approved | Partial apporval for phase 1 area 1st floor office, classroom and lobby only do not use the 2nd floor. Under IFC 1008.1.9 2006ed need to install panic hardware on the front lobby doors as this is a group "E" occ. |
07/24/2014 | FIRE - ALARM FINAL | CSCHULTZ | Approved | Plans and permit were approved by the AZ ststae fire marshall office,all testing was done by the state. |
08/08/2014 | SHEET ROCK NAILING | IVR USER | Approved | IVRS - AP canceled |
09/29/2014 | MECHANICAL - FINAL | JBURGE | Approved | NEED AIR BALANCE REPORT |
09/29/2014 | PLUMBING - FINAL | JBURGE | Approved | NEED BACTERIA REPORT |
09/29/2014 | MECHANICAL - FINAL | JBURGE | Approved | IVRS - Inspection :* |
09/29/2014 | PLUMBING - FINAL | JBURGE | Approved | IVRS - Inspection :* |
10/15/2014 | ENGINEERING - FINAL | DROBERTS | Approved | WALKED THE SITE WITH AND DISCUSSED THE ITEMS THAT NEED TO BE REPAIRED PRIOR TO THE FINAL APPROVAL OF THIS SITE BEING GIVEN. THIS LIST OF ITEMS AT THIS TIME WILL INCLUDE BUT IS NOT LIMITED TO THE FOLLOWING: 1) APPROVED AS-BUILT DRAWINGS FOR THIS SITE ALONG WITH THE CERTIFICATION LETTER FROM THE ENGINEER OF RECORD. 2) COMPLETE ALL PEDESTRIAN ACCESS AS REQUIRED BY THE APPROVED DRAWINGS FOR THIS SITE FROM 22ND STREET AND SARNOFF. |
10/15/2014 | BUILDING - FINAL | JBURGE | Approved | NEED AIR BALANCE & BACTERIA TEST |
10/15/2014 | MECHANICAL - ABOVE CEILING | JBURGE | Approved | IVRS - Inspection :* |
10/15/2014 | PLUMBING - PROGRESS | JBURGE | Approved | IVRS - Inspection :* |
10/15/2014 | PLUMBING - YARD WTR LINE/TEST | JBURGE | Approved | IVRS - Inspection :* |
10/15/2014 | PLUMBING - ROOF DRAINS | JBURGE | Approved | IVRS - Inspection :* |
10/15/2014 | PLUMBING - ABOVE CEILING | JBURGE | Approved | IVRS - Inspection :* |
10/15/2014 | MECHANICAL - INTERMEDIATE | JBURGE | Approved | IVRS - Inspection :* |
10/15/2014 | ELECTRIC - INTERMEDIATE | JBURGE | Approved | IVRS - Inspection :* |
10/15/2014 | ELECTRIC - FINAL | JBURGE | Approved | IVRS - Inspection :* |
10/15/2014 | BUILDING - PROGRESS | JBURGE | Approved | IVRS - Inspection :* |
10/15/2014 | U VALUE FOR WINDOW | JBURGE | Approved | IVRS - Inspection :* |
10/15/2014 | STUCCO MESH | JBURGE | Approved | IVRS - Inspection :* |
10/15/2014 | BUILDING ABOVE CEILING | JBURGE | Approved | IVRS - Inspection :* |
10/15/2014 | FRAMING | JBURGE | Approved | IVRS - Inspection :* |
10/15/2014 | EXT METAL CLIPS/EXT SHEATHING | JBURGE | Approved | IVRS - Inspection :* |
10/15/2014 | BUILDING - FINAL | JBURGE | Approved | IVRS - Inspection :* |