Inspection Status: Approved
Inspection History: ENGINEERING - FINAL
Permit Number - T12CM00498
Inspection Description - ENGINEERING - FINAL
Inspection Status - Approved
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
06/19/2015 | ENGINEERING - FINAL | Approved | ||
10/15/2014 | ENGINEERING - FINAL | Partial Approval | WALKED THE SITE WITH AND DISCUSSED THE ITEMS THAT NEED TO BE REPAIRED PRIOR TO THE FINAL APPROVAL OF THIS SITE BEING GIVEN. THIS LIST OF ITEMS AT THIS TIME WILL INCLUDE BUT IS NOT LIMITED TO THE FOLLOWING: 1) APPROVED AS-BUILT DRAWINGS FOR THIS SITE ALONG WITH THE CERTIFICATION LETTER FROM THE ENGINEER OF RECORD. 2) COMPLETE ALL PEDESTRIAN ACCESS AS REQUIRED BY THE APPROVED DRAWINGS FOR THIS SITE FROM 22ND STREET AND SARNOFF. | |
05/14/2013 | ENGINEERING - FINAL | Denied | 1) PROVIDE AN APPROVED SET OF PLANS FOR INSPECTION. SITE/GRADING PLAN HAS NOT BEEN REVIEWED AND APPROVED BY THE CITY OF TUCSON. 2) INSTALL HC PARKING AND ACCESS PER YOUR PLAN, CURRENT PARKING DOES NOT MEET ADA. 3) INSTALL TRASH ENCLOSURE SHOWN ON PLANS CALL FOR RE-INSPECTION |
|
05/14/2013 | ENGINEERING - FINAL | Partial Approval | TEMPORARY USE OF THE INTERIOR MULTI USE AREA ONLY AS DISCUSSED ON THE SITE ON 5/13/13. ALL AREAS UNDER CONSTRUCTION WILL BE FENCED OFF TO PREVENT ACCESS FROM ANYONE NOT EMPLOYED BY THE DEVELOPER OR CONTRACTOR. ADDITIONAL WORK IS STILL REQUIRED BUT WILL NOT BE COMPLETED UNTIL AFTER MAY 31ST, THE TEMPORARY USE AREA WILL BE CLOSED SO THAT ALL WORK CAN BE COMPLETED TO THE ADJACENT AREAS. | |
05/01/2013 | ENGINEERING - FINAL | Denied | NOT READY, COMPLETE SITE WORK PER PLAN AND CALL FOR RE-INSPECTION | |
02/15/2013 | ENGINEERING - FINAL | Continued | MET ONSITE TOO DISCUSS WHAT IS NEEDED FOR THE SCHOOL TOO RECEIVE A TEMPORARY C OF O FOR THIS SITE. I HAVE ADVISED THE DEVELOPER THAT THEY WILL NEED TOO COMPLETE THE WORK WITHIN AND ADJACENT TO THE STRUCTURE THAT THEY ARE SEEKING A TEMPORARY C OF O, AND THEN PLACE A TEMPORARY BARRIER BETWEEN THE PEDESTRIAN ACCESS AREAS AND THE AREAS OF OPEN CONSTRUCTION. |