Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

PRO is currently experiencing an outage. Some documents and records may not be available on PRO momentarily. We apologize for the inconvenience and are working to restore full access.

Permit Details

Status:
Final
Type:
COMMERCIAL NEW
Address NEW:
5545 E BROADWAY BL
Apply Date:
01/11/2012
Applicant:
WAYNE SILBERSCHLAG
Description:
NEW 14,500 S.F. STRIP SHOPPING CENTER SHELL BLDG
Architects:
  • SILBERSCHLAG, WAYNE DAVID
Contractors:
  • W.E.O'NEIL CONSTRUCTION CO. INC

Permit Reviews

Permit Number - T12CM00073
Permit Status: Final
Permit Description: NEW 14,500 S.F. STRIP SHOPPING CENTER SHELL BLDG
Start Date Submittal Complete Date Status  
01/11/2012 PLANS OK TO SUBMIT - COMM 01/11/2012 COMPLETED Review Details
01/11/2012 COMMERCIAL - NEW 01/30/2012 COMPLETED Review Details
02/23/2012 RESUBMITTAL - TI ALL 05/16/2012 COMPLETED Review Details
08/29/2012 REVISION - - 1ST 10/15/2012 COMPLETED Review Details

Outstanding Activity Conditions

Permit Number - T12CM00073
Permit Status: Final
Permit Description: NEW 14,500 S.F. STRIP SHOPPING CENTER SHELL BLDG
Total Outstanding Activity Conditions - 1
Date Name
01/11/2012 PLANS EXPIRE IN 180 DAYS FROM DATE OF SUBMITTAL. PERMITS EXPIRE IN 180 DAYS FROM DATE OF ISSUE OR LAST INSPECTION.

Completed Inspections

Permit Status: Final
Permit Number: T12CM00073
Permit Description: NEW 14,500 S.F. STRIP SHOPPING CENTER SHELL BLDG
Total Completed Inspections - 46
Date Description Inspector Results Comments
05/19/2012 NPPO PRE PERMIT INSPECTION MRUSSO Approved NPPO:
1) ADD TWO OCCOTILLO'S DURING THE LANDSCAPING PHASE IN ORDER TO REPLACE THE ONES SHOWN ON THE NPPO PLAN THAT ARE MISSING.
2) EXISTING OLIVE TREES PLANTED ALONG THE SOUTH SIDE OF THE PROJECT ARE IN THE RIGHT-OF-WAY. THE CONTRACTOR WILL LANDSCAPE WITH DESERT PLANTS FROM THE PROPERTY LINE IN. THE CONTRACTOR ASKED IF THE OLIVE TREES CAN BE REMOVED.
3) DATE PALM TREES ALONG THE SOUTH SIDE OF THE BLDG WILL BE MOVED AND RE-PLANTED
05/19/2012 ENGINEERING PRE-CONSTRUCTION MRUSSO Approved SWPPP:
1) INSTALL SEDIMENT CONTROLS AS SHOWN ON APPROVED STORM WATER PLAN.
2) POST A COPY OF YOUR SIGNED NOI ON SITE.
3) INSTALL A STABILIZED CONSTRUCTION ENTRANCE OR ENTRANCES AT ALL ROUTES TO AND FROM THE SITE AS SHOWN ON THE APPROVED STORM WATER PLAN.
4) INSTALL A CONCRETE WASH OUT WHEN APPLICABLE.
5) SHOW ANY AND ALL CHANGES MADE TO THE APPROVED STORM WATER PLAN.
6) ENSURE TO PERFOM STORM WATER SELF INSPECTION AS REQUIRED UNDER YOUR PLAN. INSPECTIONS MUST BE DOCUMENTED.

NPPO:
1) ADD TWO OCCOTILLO'S DURING THE LANDSCAPING PHASE IN ORDER TO REPLACE THE ONES SHOWN ON THE NPPO PLAN THAT ARE MISSING.
2) EXISTING OLIVE TREES PLANTED ALONG THE SOUTH SIDE OF THE PROJECT ARE IN THE RIGHT-OF-WAY. THE CONTRACTOR WILL LANDSCAPE WITH DESERT PLANTS FROM THE PROPERTY LINE IN. THE CONTRACTOR ASKED IF THE OLIVE TREES CAN BE REMOVED.
3) DATE PALM TREES ALONG THE SOUTH SIDE OF THE BLDG WILL BE MOVED AND RE-PLANTED
07/06/2012 ELECTRIC - UFER RHOLLAND Approved IVRS - Inspection :*
07/16/2012 STEM WALL/RETAINING WALL RHOLLAND Approved IVRS - Inspection :*
08/07/2012 PLUMBING - ROUGH, SOIL RHOLLAND Approved OK FOR GREASE TRAP RON
09/27/2012 ELECTRIC - UNDERGROUND RHOLLAND Approved OK GROUND RODS +4 PVC AT SES SLAB
10/23/2012 BUILDING PRE-SLAB DQUINN Approved B,C & D RISER ROOM & N FACE OF A OK POUR
10/23/2012 ROOF NAILING DQUINN Approved IVRS - Inspection :*
11/02/2012 PLUMBING - SEWER HCS CONNECT RLEDONNE Approved
11/02/2012 ENGINEERING - FINAL RLEDONNE Approved
11/08/2012 PLUMBING - YARD WTR LINE/TEST RHOLLAND Approved IVRS - Inspection :*
11/13/2012 SHEET ROCK NAILING DQUINN Approved PAD 1 E&W SIGN PLY OK
11/18/2012 FIRE SPKLR - OH PIPING & HYDRO CBASALDU Approved
11/28/2012 FRAMING RHOLLAND Approved OK FRONT SOFFIT AND CANS IN SOFFIT
11/28/2012 FIRE SPKLR - FINAL CSCHULTZ Approved Will need riser room door label "RISER ROOM" and install a FD key box for access.
11/28/2012 FIRE SPKLR - UG PIPING FLUSH CSCHULTZ Approved FLUSHED FOR 3 MINS
11/28/2012 FIRE SPKLR - UG, PIPING, HYDRO CSCHULTZ Approved 200 PSI FOR HOURS
11/28/2012 ELECTRIC - INTERMEDIATE RHOLLAND Approved IVRS - Inspection :*
12/11/2012 STUCCO MESH JMILITEL Approved IVRS - Inspection :*
12/11/2012 EXCAVATION/LAYOUT REBAR & ZON JMILITEL Approved IVRS - Inspection :*
12/28/2012 REINFORCED MASONRY PRE-GROUT JMILITEL Approved IVRS - Inspection :*OK TO GROUT SCREEN WALL AT SW CORNER OF BLDG
01/02/2013 EXT METAL CLIPS/EXT SHEATHING JMILITEL Approved IVRS - Inspection :*
01/02/2013 PLUMBING - INTERMEDIATE JMILITEL Approved IVRS - Inspection :*
01/02/2013 PLUMBING - PRE SLAB JMILITEL Approved IVRS - Inspection :*
01/07/2013 ELECTRIC - TEMPORARY SERVICE JMILITEL Approved IVRS - Inspection :*
01/07/2013 BUILDING - PROGRESS JMILITEL Approved IVRS - Inspection :*
01/07/2013 BUILDING ABOVE CEILING JMILITEL Approved IVRS - Inspection :*
01/07/2013 MECHANICAL - INTERMEDIATE JMILITEL Approved IVRS - Inspection :*
01/07/2013 PLUMBING - FINAL JMILITEL Approved IVRS - Inspection :*
01/07/2013 PLUMBING - PROGRESS JMILITEL Approved IVRS - Inspection :*
01/07/2013 PLUMBING - ROOF DRAINS JMILITEL Approved IVRS - Inspection :*
01/07/2013 ELECTRIC - PROGRESS JMILITEL Approved IVRS - Inspection :*
01/16/2013 ELECTRIC - TEMP POWER FOR TEST JMILITEL Approved IVRS - Inspection :*
01/16/2013 ELECTRIC - CABLE DROP JMILITEL Approved IVRS - Inspection :*
01/16/2013 U VALUE FOR WINDOW JMILITEL Approved IVRS - Inspection :*
01/16/2013 ELECTRIC - OUTDOOR LIGHTING JMILITEL Approved IVRS - Inspection :*
01/17/2013 TEP CLEARANCE - AM JMILITEL Approved OK TO CLEAR COMMERCIAL ECO HOUSE PANEL 1 METER
01/17/2013 NPPO - FINAL RLEDONNE Approved NA TO THIS ACTIVITY.
01/17/2013 SIGN - FINAL RLEDONNE Approved NA TO THIS ACTIVITY.
01/18/2013 RIGHT OF WAY - FINAL P.Whiddon Approved
01/22/2013 BUILDING - FINAL JMILITEL Approved IVRS - Inspection :*
01/22/2013 MECHANICAL - FINAL JMILITEL Approved IVRS - Inspection :*
01/22/2013 OUTDOOR LIGHTING FINAL JMILITEL Approved IVRS - Inspection :*
01/22/2013 ELECTRIC - FINAL JMILITEL Approved IVRS - Inspection :*
01/23/2013 FIRE - FINAL CSCHULTZ Approved
02/19/2013 LANDSCAPE - FINAL RLEDONNE Approved