Permit: T12BU00546
Permit Details
Apply Date:
04/30/2012
Applicant:
JEFF D BEHRANA P E
Description:
GRADING
Contractors:
- CANYON BUILDING AND DESIGN LLC *APA*
Permit Reviews
Permit Number - T12BU00546
Permit Status: Final
Permit Description: GRADING
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 04/26/2012 | PLANS OK TO SUBMIT - GRADING | 04/26/2012 | COMPLETED |
| 04/26/2012 | GRADING | 08/31/2012 | COMPLETED |
| 08/31/2012 | RESUBMITTAL - GRADING | 09/19/2012 | COMPLETED |
| 09/19/2012 | REVISION - GRADING | 10/11/2012 | COMPLETED |
Outstanding Activity Conditions
Permit Number - T12BU00546
Permit Status: Final
Permit Description: GRADING
Total Outstanding Activity Conditions - 1
| Date | Name |
|---|---|
| 04/30/2012 | PLANS EXPIRE IN 180 DAYS FROM DATE OF SUBMITTAL. PERMITS EXPIRE IN 180 DAYS FROM DATE OF ISSUE OR LAST INSPECTION. |
Completed Inspections
Permit Status: Final
Permit Number: T12BU00546
Permit Description: GRADING
Total Completed Inspections - 10
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 07/20/2012 | STORMWATER INSTALL OF CONTROLS | DROBERTS | Approved | STOPPED BY THE SITE AND MET WITH THE CONTRACTOR. THEY HAVE PLACED THE STORMWATER CONTROLS (SILTFENCE) AROUND THE SITE |
| 07/30/2012 | SWPPP CORRECTION NOTICE | DROBERTS | Approved | MINOR TRACK OUT NOTED ON THE ADJACENT ROADWAYS AND PARKING LOTS, WILL ADVISE THE CONTRACTOR TO MAKE THE CORRECTIVE MEASURES ONCE THEY RETURN. |
| 07/30/2012 | STORMWATER FOLLOW-UP INSP | DROBERTS | Approved | NO CONCERNS AT THIS TIME, MINOR TRACKOUT NOTED. |
| 10/03/2012 | GRADING - INTERMEDIATE | DROBERTS | Approved | SITE VISIT ONLY, SITE NOT READY AT THIS TIME. |
| 10/19/2012 | REINFORCED MASONRY PRE-GROUT | DROBERTS | Approved | LOOKED AT THE SITE TO VERIFY THAT THEY ARE READY FOR PLACING THEIR FIRST 4 LIFT OF GROUT INT EH WALLS ALONG THE SOUTH AND SOUTHWEST SIDES OF THE PROJECTS ADJACENT TO THE EXISTING PROPERTIES. |
| 11/27/2012 | GRADING - REBAR | DROBERTS | Approved | REBAR AND FOOTER PLACEMENT APPROVED FOR THIS SITE(SAUSAGE DELI). |
| 06/04/2013 | ENGINEERING PRE-CONSTRUCTION | MRUSSO | Approved | SITE HAS BEEN PHASED. 1ST PHASE WAS CONSTRUCTION OF THE SAUSAGE DELI, PHASE TWO IS CONSTRUCTION OF THE WALGREENS. DIFFERENT CONTRACTOR FOR EACH PHASE. |
| 08/13/2013 | STORMWATER FINAL INSPECTION | MRUSSO | Approved | SITE IS STABILIZED AND LANDSCAPED. ENSURE THE NOTICE OF TERMINATION IS FILED WITH ADEQ |
| 09/16/2013 | GRADING - FINAL | MRUSSO | Approved | |
| 11/20/2013 | LANDSCAPE INSPECTION | DROBERTS | Approved | THE LANDSCAPING HAS BEEN APPROVED AT THIS TIME AFTER VERIFICATION THAT THE IRRIGATION SYSTEM WAS VERIFIED AND CERTIFIED BY THE ENGINEER OF RECORD FOR THIS SITE. |