Inspection History Details
Inspection Status: Approved
Inspection History: STORMWATER FOLLOW-UP INSP
Permit Number - T12BU00546
Inspection Description - STORMWATER FOLLOW-UP INSP
Inspection Status - Approved
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
07/29/2013 | STORMWATER FOLLOW-UP INSP | Approved | ||
07/10/2013 | STORMWATER FOLLOW-UP INSP | Continued | 1) PRIOR TO FINAL APPROVAL, CLEAN OUT RET/DET BASIN OF CONCRETE AND CONSTRUCTION MATERIALS 2) CLEAN OUT CATCH BASINS 3) LOWER TWO WALL OPENINGS IN THE PARKING LOT |
|
06/26/2013 | STORMWATER FOLLOW-UP INSP | Continued | NO SIGNIFICANT STORM WATER CONCERNS AT THIS TIME | |
06/20/2013 | STORMWATER FOLLOW-UP INSP | Continued | NO SIGNIFICANT CONCERNS AT THIS TIME CONTRACTOR PAVING PARKING LOT TODAY NO SIGNIFICANT STORM WATER CONCERNS |
|
06/04/2013 | STORMWATER FOLLOW-UP INSP | Continued | SITE HAS BEEN PHASED. 1ST PHASE WAS CONSTRUCTION OF THE SAUSAGE DELI, PHASE TWO IS CONSTRUCTION OF THE WALGREENS. DIFFERENT CONTRACTOR FOR EACH PHASE. 1) THERE ARE TWO DETAILS FOR TRASH ENCLOSURE FOR THE WALGREENS. ONE ON THE ARCH PLANS AND ONE ON THE CIVIL PLANS. PROVIDE INFO FROM THE ENG OF RECORD AND USE ONE DETAIL. 2) ENSURE SITE IS SLOPED AND GRADED PER APPROVED PLANS - PAVING IN TWO WEEKS 3) NO SIGNIFICANT STORM WATER CONCERNS AT THIS TIME |
|
04/04/2013 | STORMWATER FOLLOW-UP INSP | Continued | 1) SEDIEMNT CONTROLS HAVE BEEN INSTALLED FOR THE WALGREENS CONSTRUCTION ALONG THE WEST AND NORTH PERIMETERS 2) A STABILIZED ENTRANCE IS IN PLACE 3) INSTALL A CONCRETE/MATERIALS WASH OUT ON SITE 4) POST A SIGNED COPY OF YOUR NOI ON SITE 5) INSTALL REMAINING WADDLE IN AREA THAT WAS LEFT OPEN 6) CALL FOR RE-INSPECTION WHEN COMPLETED |
|
03/26/2013 | STORMWATER FOLLOW-UP INSP | Correction Required | SITE HAS A STORM WATER PERMIT AND PLAN. SITE IS IN NON-COMPLIANCE W/AZPDES PERMIT 1) INSTALL SEDIMENT CONTROLS PER YOUR PLAN AND THE CHANGES DISCUSSED DURING YOUR 3-25 INSP. 2) ENSURE A CONCRETE/MATERIALS WASH OUT IS INSTALLED AND USED ON SITE 3) SWEEP UP TRACKED SOIL OFF PUBLIC ROADWAYS ROUTINELY 4) PERFORM AND DOCUMENT STORM WATER SELF INSPECTIONS PER YOUR SWPPP. NOI CERT IS BRANDON CAMPBELL 480-513-6144 |
|
01/07/2013 | STORMWATER FOLLOW-UP INSP | Continued | 1) SWEEP UP TRACKING 2) INSTALL A STABILIZED ENTRANCE, SITE NOT PAVED. 3) INSTALL SEDIMENT CONTROLS AROUND LOT THAT HAS BEEN ROUGH GRADED, BUT SITE CONSTRUCTION HAS NOT STARTED. 4) KEEP ACCURATE RECORDS OF STORM WATER SELF INSPECTIONS |
|
07/30/2012 | STORMWATER FOLLOW-UP INSP | Continued | NO CONCERNS AT THIS TIME, MINOR TRACKOUT NOTED. | |
07/27/2012 | STORMWATER FOLLOW-UP INSP | Continued | NO CONCERNS AT THIS TIME. | |
07/20/2012 | STORMWATER FOLLOW-UP INSP | Continued | NO CONCERNS AT THIS TIME. ADVISED THE CONTRACTOR TO MAKE SURE THAT ALL THE DIRT FROM THE SITE REMAIN WITHIN THE BOUNDARIES OF THE SITE. |