Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit: T11CM02395
Permit Details
Apply Date:
07/29/2011
Applicant:
WILLIAMS, WILLIAM
Description:
TI: FOOD CONSPIRACY CO-OP REMODEL
Architects:
- WILLIAMS, WILLIAM
Contractors:
- HIDDEN HOLLOW CONSTRUCTION
Permit Reviews
Permit Number - T11CM02395
Permit Status: C of o
Permit Description: TI: FOOD CONSPIRACY CO-OP REMODEL
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
03/28/2012 | REVISION - SITE | 03/28/2012 | COMPLETED |
07/29/2011 | PLANS OK TO SUBMIT - COMM | 09/21/2011 | COMPLETED |
09/21/2011 | PLANS OK TO SUBMIT - SITE | 09/21/2011 | COMPLETED |
09/21/2011 | SITE | 10/27/2011 | COMPLETED |
09/28/2011 | COMMERCIAL - TI | 10/27/2011 | COMPLETED |
10/28/2011 | RESUBMITTAL - SITE | 12/16/2011 | COMPLETED |
10/28/2011 | RESUBMITTAL | 11/04/2011 | COMPLETED |
11/04/2011 | RESUBMITTAL | 11/09/2011 | COMPLETED |
11/09/2011 | RESUBMITTAL | 12/16/2011 | COMPLETED |
Outstanding Activity Conditions
Permit Number - T11CM02395
Permit Status: C of o
Permit Description: TI: FOOD CONSPIRACY CO-OP REMODEL
Total Outstanding Activity Conditions - 1
Date | Name |
---|---|
07/29/2011 | PLANS EXPIRE IN 180 DAYS FROM DATE OF SUBMITTAL. PERMITS EXPIRE IN 180 DAYS FROM DATE OF ISSUE OR LAST INSPECTION. |
Completed Inspections
Permit Status: C of o
Permit Number: T11CM02395
Permit Description: TI: FOOD CONSPIRACY CO-OP REMODEL
Total Completed Inspections - 44
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
12/29/2011 | BUILDING PRE-SLAB | LHANLY | Approved | INTERIOR OK |
12/29/2011 | PLUMBING - PRE SLAB | LHANLY | Approved | INTERIOR OK |
12/29/2011 | PLUMBING - ROUGH, SOIL | LHANLY | Approved | INTERIOR OK |
01/13/2012 | ROOF NAILING | LHANLY | Approved | |
01/17/2012 | PLUMBING - BACK WATER VALVE | LHANLY | Approved | |
01/17/2012 | PLUMBING - INTERMEDIATE | LHANLY | Approved | |
01/17/2012 | ELECTRIC - UNDERGROUND | LHANLY | Approved | |
01/17/2012 | U VALUE FOR WINDOW | LHANLY | Approved | |
01/17/2012 | MECHANICAL - INTERMEDIATE | LHANLY | Approved | |
01/17/2012 | STUCCO MESH | LHANLY | Approved | |
01/17/2012 | STEM WALL/RETAINING WALL | LHANLY | Approved | |
01/17/2012 | FRAMING | LHANLY | Approved | |
01/17/2012 | REINFORCED MASONRY PRE-GROUT | LHANLY | Approved | |
01/20/2012 | ELECTRIC - INTERMEDIATE | LHANLY | Approved | |
01/20/2012 | EXCAVATION/LAYOUT REBAR & ZON | LHANLY | Approved | |
01/26/2012 | PLUMBING - YARD WTR LINE/TEST | LHANLY | Approved | |
01/26/2012 | PLUMBING - GAS PRESS TEST FNL | LHANLY | Approved | |
01/26/2012 | PLUMBING - GAS PRESS TEST FNL | LHANLY | Approved | |
01/26/2012 | ELECTRIC - ABOVE CEILING | LHANLY | Approved | |
02/01/2012 | SITE - SEWER | LHANLY | Approved | |
02/01/2012 | PLUMBING - SEWER HCS CONNECT | LHANLY | Approved | |
02/14/2012 | PLUMBING - ABOVE CEILING | LHANLY | Approved | |
02/14/2012 | MECHANICAL - ABOVE CEILING | LHANLY | Approved | |
02/14/2012 | SHEET ROCK NAILING | LHANLY | Approved | |
02/14/2012 | BUILDING ABOVE CEILING | LHANLY | Approved | |
03/13/2012 | RIGHT OF WAY - FINAL | PSABIN | Approved | |
03/16/2012 | NPPO - FINAL | MRUSSO | Approved | |
03/16/2012 | SIGN - FINAL | MRUSSO | Approved | |
03/16/2012 | LANDSCAPE - FINAL | MRUSSO | Approved | |
03/30/2012 | PLUMBING - PROGRESS | LHANLY | Approved | |
03/30/2012 | PLUMBING - GAS PRESSURE TEST | LHANLY | Approved | |
03/30/2012 | ELECTRIC - FINAL | LHANLY | Approved | |
03/30/2012 | ELECTRIC - SERVICE UPGRADE | LHANLY | Approved | |
03/30/2012 | ELECTRIC - UFER | LHANLY | Approved | |
04/03/2012 | ENGINEERING - FINAL | MRUSSO | Approved | |
04/11/2012 | HEALTH DEPT - FINAL 724-7908 | NRAMIREZ | Approved | |
04/12/2012 | PLUMBING - FINAL | LHANLY | Approved | |
04/12/2012 | PLUMBING - ROOF DRAINS | LHANLY | Approved | |
04/12/2012 | MECHANICAL - FINAL | LHANLY | Approved | |
04/12/2012 | MECHANICAL - HOODS | LHANLY | Approved | |
04/12/2012 | BUILDING - FINAL | LHANLY | Approved | |
04/12/2012 | BUILDING - PROGRESS | LHANLY | Approved | |
04/12/2012 | FIRE - FINAL | CSCHULTZ | Approved | Can not exit through a kitchen, exit sign located outside of door to kitchen shall be removed or a directional arrow shall be added showing to exit in the office area. (Arrow was added and final was given) |
04/12/2012 | FIRE - KITCHEN EXH HOOD FINAL | CSCHULTZ | Approved |