Permit: T11CM02131
Permit Details
Apply Date:
07/07/2011
Applicant:
LUKE WILSON
Description:
TI: BROOKLINE COLLEGE
Contractors:
- VISTA GENERAL L L C
Permit Reviews
Permit Number - T11CM02131
Permit Status: Final
Permit Description: TI: BROOKLINE COLLEGE
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
01/31/2012 | REVISION - - 2ND | 02/08/2012 | COMPLETED |
07/07/2011 | PLANS OK TO SUBMIT - COMM | 07/07/2011 | COMPLETED |
07/07/2011 | COMMERCIAL - TI | 09/13/2011 | COMPLETED |
09/13/2011 | RESUBMITTAL | 10/03/2011 | COMPLETED |
10/03/2011 | RESUBMITTAL | 10/20/2011 | COMPLETED |
10/20/2011 | RESUBMITTAL | 10/24/2011 | COMPLETED |
10/24/2011 | RESUBMITTAL | 10/27/2011 | COMPLETED |
12/13/2011 | REVISION - - 1ST | 12/13/2011 | COMPLETED |
Outstanding Activity Conditions
Permit Number - T11CM02131
Permit Status: Final
Permit Description: TI: BROOKLINE COLLEGE
Total Outstanding Activity Conditions - 1
Date | Name |
---|---|
07/07/2011 | PLANS EXPIRE IN 180 DAYS FROM DATE OF SUBMITTAL. PERMITS EXPIRE IN 180 DAYS FROM DATE OF ISSUE OR LAST INSPECTION. |
Completed Inspections
Permit Status: Final
Permit Number: T11CM02131
Permit Description: TI: BROOKLINE COLLEGE
Total Completed Inspections - 25
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
11/02/2011 | PLUMBING - PRE SLAB | RRICH | Approved | IVRS - Inspection :* 1) SAME AREA EAST ONLY OK |
12/02/2011 | ELECTRIC - ABOVE CEILING | DSANTACR | Approved | IVRS - Inspection :* 1) OK PHASE ONE EXCEPT POWER POLES, PROJECTORS, EXIT LTGS, JUST EAST OF EXISTING DEMIZING WALL, DENTAL LAB, SNACK SHOP, RESTROOMS AND MESSAGE THEROPY |
12/09/2011 | PLUMBING - INTERMEDIATE | BBENEDON | Approved | IVRS - Inspection :* 1) COMPLETE PIPE INSULATION, REINSTALL SUPPORTS AS NEEDED 2) SUPPORT PIPING AT EACH END AN NOT TO EXCEED MINIMUM REQUIRED DISTANCE |
12/14/2011 | ELECTRIC - FINAL | RMORENO | Approved | IVRS - Inspection :* 1) PHASE I EM FOR SOUTH FRONT DOORS NOT WORKING 2) BREAKER HANDLES MISSING 1102 FOR POWER POLE |
12/14/2011 | PLUMBING - PROGRESS | BBENEDON | Approved | IVRS - Inspection :* 1) VENTS REQUIRE UV PROTECTION AND CLEARANCE 2) ISOLATE CU FROM GRID WIRES 3) OVERHEAD DWV REQUIRES SUPPORT AT EACH CHANGE OF DIRECTION, NOT EXCEED 4', CU SUPPORTS NOT TO EXCEED 6' 4) PROVIDE LISTED CLEANOUT PLUGS FOR SCREWS 5) TRAP ARM MAY NOT CHANGE ELEVATION 6) VACUUM RELIEF VAVLE SHOWN 7) EAST PLAN REVISION OK |
12/14/2011 | PLUMBING - ROUGH, SOIL | BBENEDON | Approved | IVRS - Inspection :* |
12/15/2011 | PLUMBING - FINAL | BBENEDON | Approved | IVRS - Inspection :* 1) PLUMBING DEMO REQUIRES PERM CAPS AND INSPECTION 2) WORK NOT DONE WILL REQUIRE REV. 3) SEAL AND CLIP NEW SINKS AND MAKE CLEANOUTS ACCESSIBLE |
12/15/2011 | PLUMBING - ABOVE CEILING | BBENEDON | Approved | IVRS - Inspection :* 1) EAST SIDE PHASE I |
12/16/2011 | MECHANICAL - FINAL | JMILITEL | Approved | IVRS - Inspection :* 1) OK FOR FINAL PHASE I |
12/16/2011 | BUILDING - FINAL | MHENSON | Approved | IVRS - Inspection :* 1) OK TO MOVE EQUIPMENT/FURNITURE 2) NEED TO SEE LEERAY REGARDING TEMP C OF O 3) NEED ELECTRIC OK FOR PHASE I 4) NEE ENGINEERING OK FOR PHASE I 5) RAMP TO HAVE HANDRAILS BOTH SIDES DIRECTIONAL SIGN TO ACCESSIBLE ENTRANCE |
12/19/2011 | NPPO - FINAL | DROBERTS | Approved | |
12/19/2011 | SIGN - FINAL | DROBERTS | Approved | |
12/19/2011 | LANDSCAPE - FINAL | DROBERTS | Approved | |
12/19/2011 | ENGINEERING - FINAL | DROBERTS | Approved | |
12/22/2011 | MECHANICAL - INTERMEDIATE | JMILITEL | Approved | IVRS - Inspection :* ALL EXISTING DUCTS + DIFFUSERS OK NEED TO SEE CONDESATE DRAINS + NEW DUCT CONNECTIONS |
12/28/2011 | ELECTRIC - INTERMEDIATE | RMORENO | Approved | IVRS - Inspection :* 1) 1016, 110, 122, 1001-1004 AND CEILINGS OK 2) 1057, 1055 AND WALLS OK |
12/28/2011 | SHEET ROCK NAILING | WLAHR | Approved | IVRS - Inspection :* |
12/28/2011 | FRAMING | WLAHR | Approved | IVRS - Inspection :* |
12/29/2011 | BUILDING ABOVE CEILING | WLAHR | Approved | IVRS - Inspection :* |
12/30/2011 | MECHANICAL - ABOVE CEILING | MRAMBER | Approved | IVRS - Inspection :* |
01/26/2012 | FIRE - ALARM FINAL | MBrown | Approved | |
01/26/2012 | FIRE SPKLR - FINAL | MBrown | Approved | |
01/26/2012 | FIRE - FINAL | MBrown | Approved | |
02/17/2012 | ELECTRIC - UNDERGROUND | RMORENO | Approved | |
02/17/2012 | BUILDING - PROGRESS | JBURGE | Approved | IVRS - Inspection :* |