Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - INTERMEDIATE
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 02/17/2012 | PLUMBING - INTERMEDIATE | Approved | IVRS - Inspection :* | |
| 01/26/2012 | PLUMBING - INTERMEDIATE | Not ready for Inspection | IVRS - Inspection :* | |
| 12/09/2011 | PLUMBING - INTERMEDIATE | Not ready for Inspection | IVRS - Inspection :* 1) COMPLETE PIPE INSULATION, REINSTALL SUPPORTS AS NEEDED 2) SUPPORT PIPING AT EACH END AN NOT TO EXCEED MINIMUM REQUIRED DISTANCE |
|
| 11/17/2011 | PLUMBING - INTERMEDIATE | Partial Approval | IVRS - Inspection :* 1) WATERS FOR STOOLS OK PER PLAN 2) NO HAMMER ARRESTORS REQUIRED 3) INSULATION IN WALL OK |
|
| 11/16/2011 | PLUMBING - INTERMEDIATE | Not ready for Inspection | IVRS - Inspection :* | |
| 11/15/2011 | PLUMBING - INTERMEDIATE | Partial Approval | IVRS - Inspection :* 1) DWV THRU ROOF WATER TEST EAST ONLY OK 2) EAST WATER DISTRIBUTION OK, EXCEPT VERIFY FLUSH VALVES ONLY REQUIRE 3/4" SUPPLYS 3) PROVIDE WATER HAMMER DEVICE FOR FLUSH VALVES, STUB OUT 1 1/2 AT WATER HEATER 4) PROVIDE INSULATION PER PLAN SPEC. PLAN CALLS FOR TANK TYPE STOOLS |