Permit: T11CM01464
Permit Details
Apply Date:
05/13/2011
Applicant:
JESUS GAYTAN
Description:
ADDITION:2ND STORY & OUT BUILDINGS:ELECTRIC UPGRADE:T10DV06702
Permit Reviews
Permit Number - T11CM01464
Permit Status: L of c
Permit Description: ADDITION:2ND STORY & OUT BUILDINGS:ELECTRIC UPGRADE:T10DV06702
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 05/13/2011 | RESIDENTIAL - BLDG/ZONING/ENGINE/WWM | 05/18/2011 | COMPLETED |
| 05/31/2011 | REVISION - - 1ST | 08/02/2011 | COMPLETED |
| 10/15/2012 | REVISION - - 3RD | 10/15/2012 | COMPLETED |
| 11/09/2011 | REVISION - - 2ND | 11/09/2011 | COMPLETED |
Outstanding Activity Conditions
Permit Number - T11CM01464
Permit Status: L of c
Permit Description: ADDITION:2ND STORY & OUT BUILDINGS:ELECTRIC UPGRADE:T10DV06702
Total Outstanding Activity Conditions - 1
| Date | Name |
|---|---|
| 05/13/2011 | PLANS EXPIRE IN 180 DAYS FROM DATE OF SUBMITTAL. PERMITS EXPIRE IN 180 DAYS FROM DATE OF ISSUE OR LAST INSPECTION. |
Completed Inspections
Permit Status: L of c
Permit Number: T11CM01464
Permit Description: ADDITION:2ND STORY & OUT BUILDINGS:ELECTRIC UPGRADE:T10DV06702
Total Completed Inspections - 15
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 08/05/2011 | EXCAVATION/LAYOUT REBAR & ZON | WLAHR | Approved | IVRS - Inspection : See detailed listing on site.| 999* 1) PLANS NEED TO SHOW WHAT IS DONE ON SITE (REVISION) 2) NEED SUPERVISORS PERMISSION TO TRY TO GET CLAYTON TO JOB SITE BEFORE PLAN REVISONS ARE MADE 3) MAX OVERCURRENT PROTECTION FOR 12 AWG IS 20 AMPS ON KITCHEN CIRCUIT 4) LOOSE NEUTRAL WIRE IN PANEL-BREAKER DBL LUGGED |
| 08/05/2011 | ELECTRIC - RECONNECT | WLAHR | Approved | IVRS - Inspection :* |
| 08/05/2011 | TEP CLEARANCE - AM | DROBEY | Approved | |
| 08/08/2011 | ELECTRIC - SERVICE UPGRADE | RMAJUTA | Approved | 1) 8/8/11-CALLED CARLOS RAMIREZ WITH RAY MAJUTA AND LEFT MESSAGE FOR HIM TO PLEASE RETURN THE CALL 2) REVIEWED PERMITS WITH CLAYTON FOR 1ST STORY ISSUED 10/96, WITH ONLY ELECTRICAL INTERMEDIATE APPROVED 3) IT WAS DETERMINED THAT AT THIS TIME A STRUCTURAL ENGINEER NEEDS TO SUBMIT PLANS FOR APPROVAL PRIOR TO CONTINUING CONSTRUCTION 4) APPROVAL FOR 1ST STORY CONSTRUCTION AND OCCUPANCY HAS NOT BEEN ISSUED 8/9/11: 1) RAY MAJUTA SPOKE WITH CARLOS AND NOTIFIED HIM THAT HE NEEDED TO OBTAIN PLANS FROM A STRUCTURAL ENGINEER AND SUBMIT TO THE CITY OF TUCSON FOR APPROVAL |
| 08/17/2012 | ELECTRIC - INTERMEDIATE | WLAHR | Approved | IVRS - Inspection :* |
| 09/27/2012 | ROOF NAILING | WLAHR | Approved | IVRS - Inspection :* |
| 09/27/2012 | EXT METAL CLIPS/EXT SHEATHING | WLAHR | Approved | IVRS - Inspection :$ |
| 09/28/2012 | FRAMING | WLAHR | Approved | IVRS - Inspection :* |
| 09/28/2012 | MECHANICAL - INTERMEDIATE | WLAHR | Approved | IVRS - Inspection :* |
| 10/05/2012 | SHEET ROCK NAILING | WLAHR | Approved | IVRS - Inspection :* |
| 11/06/2012 | BUILDING - FINAL | WLAHR | Approved | -HANDRAIL NEEDED AT STAIRWAY TO CODE -MAKE UP ALL OUTLETS AND SWITCHES WITH COVERPLATES -SUB-PANEL REQUIRES BREAKERS TO BE SAME BRAND AS PANEL -ARC FAULT PROTECT ALL BEDROOM CIRCUITS -SMOKE DETECTOR NEEDED IN BEDROOM CEILING -U-VALVE FOR SITE BUILT WINDOW -VERIFICATION OF OUTBUILDINGS ON PERMIT -LOWER BEDROOM EGRESS WINDOW MAXIMUM SILL HEIGHT OF 44" OR DELIET BEDROOM FOR OFFICE PER HOMEOWNER -FINISH PLAYROOM TO CODE -EXTERIOR FITTINGS NEEDED FOR RACEWAYS AND EXTERIOR BOXES -OVERSIZED BREAKERS FOR CONDUCTIORS AT MAIN PANEL -PANEL SCHEDULE NEEDED FOR PANELS -NEUTRALS NEEDED TO BE UNDER SCREWS TO NEUTRAL BAR |
| 11/19/2012 | ELECTRIC - FINAL | RMORENO | Approved | NOT READY |
| 07/28/2015 | MECHANICAL - FINAL | JBURGE | Approved | IVRS - Inspection :* |
| 07/28/2015 | OUTDOOR LIGHTING FINAL | JBURGE | Approved | IVRS - Inspection :* |
| 07/28/2015 | U VALUE FOR WINDOW | JBURGE | Approved | IVRS - Inspection :* |