Permit: T10CM02626
Permit Details
Apply Date:
09/20/2010
Applicant:
N/A
Description:
ADDITION:DINNING/BATH & LIVING ROOM R1 - relocate location of sink and toilet and switch gas pack with heat pump
Permit Reviews
Permit Number - T10CM02626
Permit Status: Final
Permit Description: ADDITION:DINNING/BATH & LIVING ROOM
R1 - relocate location of sink and toilet and switch gas pack with heat pump
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 01/24/2011 | REVISION - - 4TH | 04/25/2011 | COMPLETED |
| 04/25/2011 | REVISION - - 5TH | 04/25/2011 | COMPLETED |
| 09/20/2010 | RESIDENTIAL BLDG/ZONING/ENGINE/WWM | 09/24/2010 | COMPLETED |
| 10/25/2010 | REVISION - - 1ST | 10/25/2010 | COMPLETED |
| 12/07/2010 | REVISION - - 2ND | 12/07/2010 | COMPLETED |
| 12/15/2010 | REVISION - - 3RD | 12/15/2010 | COMPLETED |
Outstanding Activity Conditions
Permit Number - T10CM02626
Permit Status: Final
Permit Description: ADDITION:DINNING/BATH & LIVING ROOM
R1 - relocate location of sink and toilet and switch gas pack with heat pump
Total Outstanding Activity Conditions - 1
| Date | Name |
|---|---|
| 09/20/2010 | PLANS EXPIRE IN 180 DAYS FROM DATE OF SUBMITTAL. PERMITS EXPIRE IN 180 DAYS FROM DATE OF ISSUE OR LAST INSPECTION. |
Completed Inspections
Permit Status: Final
Permit Number: T10CM02626
Permit Description: ADDITION:DINNING/BATH & LIVING ROOM
R1 - relocate location of sink and toilet and switch gas pack with heat pump
Total Completed Inspections - 20
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 10/18/2010 | EXCAVATION/LAYOUT REBAR & ZON | IVR USER | Approved | IVRS - Inspection :* |
| 10/26/2010 | PLUMBING - ROUGH, SOIL | IVR USER | Approved | IVRS - Inspection :* |
| 10/26/2010 | BUILDING PRE-SLAB | IVR USER | Approved | IVRS - Inspection :* |
| 11/05/2010 | REINFORCED MASONRY PRE-GROUT | WLAHR | Approved | IVRS - Inspection :* |
| 11/19/2010 | ROOF NAILING | WLAHR | Approved | IVRS - Inspection :* |
| 12/21/2010 | FRAMING | WLAHR | Approved | IVRS - Inspection : See detailed listing on site.| 999* 1) FLASH CONDUIT THRU ROOF 2) REVENT VANITY SINK 6" ABOVE FLOOD RIM OF SINK 3) PROVIDE APPROVED FITTINGS FOR VENTING OF PLUMBING AND USE CORRECT DIRECTION FOR VENTING 4) 2" VENT FOR STOOL THRU ROOF 5) PROPER SUPPORT FOR TUB RIM 6) 2 WAY CLEANOUT INSTALLED CORRECTLY BEFORE HOUSE 7) CONNECTION TO EXISTING TO BE APPROVED LONG RADIUS DRAINAGE FITTING FOR SEWER 8) ALL PEX TO BE SUPPORTED AT APPROVED DISTANCES AND APPROVED INTERVALS 9) PROVIDE LISTING FOR TUB SHOWER VALVE OR INSTALL APPROVED SHOWER VALVE |
| 12/21/2010 | PLUMBING - INTERMEDIATE | WLAHR | Approved | IVRS - Inspection : See detailed listing on site.| 999* 1) DWV TEST NOT HOLDING |
| 12/21/2010 | MECHANICAL - INTERMEDIATE | WLAHR | Approved | IVRS - Inspection : See detailed listing on site.| 999* 1) FLASH CONDUIT THRU ROOF |
| 12/21/2010 | PLUMBING - GAS PRESSURE TEST | WLAHR | Approved | IVRS - Inspection : See detailed listing on site.| 999* |
| 12/21/2010 | ELECTRIC - INTERMEDIATE | WLAHR | Approved | IVRS - Inspection : See detailed listing on site.| 999* |
| 03/04/2011 | ELECTRIC - SERVICE UPGRADE | DWALKER | Approved | IVRS - Inspection :* |
| 03/04/2011 | TEP CLEARANCE - PM | JWEATHER | Approved | INCR CLEARED PER D. WALKER |
| 03/11/2011 | PLUMBING - YARD WTR LINE/TEST | RRICH | Approved | IVRS - Inspection :* |
| 03/11/2011 | PLUMBING - SEWER HCS CONNECT | RRICH | Approved | IVRS - Inspection :* |
| 05/06/2011 | MECHANICAL - FINAL | JMILITEL | Approved | IVRS - Inspection :* |
| 05/10/2011 | SHEET ROCK NAILING | JBURGE | Approved | IVRS - Inspection :* 1) OK TO TAPE THROUGHOUT |
| 06/13/2011 | BUILDING - FINAL | JBURGE | Approved | IVRS - Inspection :* |
| 06/13/2011 | U VALUE FOR WINDOW | JBURGE | Approved | IVRS - Inspection :* |
| 06/13/2011 | PLUMBING - FINAL | RRICH | Approved | IVRS - Inspection :* |
| 06/13/2011 | ELECTRIC - FINAL | RMORENO | Approved | IVRS - Inspection :* |