Permit Details

Status:
C of o
Type:
COMMERCIAL ALTERATION
Address NEW:
5609 E SPEEDWAY BL
Apply Date:
09/08/2010
Applicant:
N/A
Description:
TI:AUTO ZONE
Architects:
  • EGLIN, EVAN SAR
Contractors:
  • VAN TASSEL PROCTOR INC

Permit Reviews

Permit Number - T10CM02502
Permit Status: C of o
Permit Description: TI:AUTO ZONE
Start Date Submittal Complete Date Status  
09/08/2010 COMMERCIAL TI 09/10/2010 COMPLETED Review Details
09/10/2010 RESUBMITTAL 09/27/2010 COMPLETED Review Details
09/27/2010 RESUBMITTAL 10/04/2010 COMPLETED Review Details
10/04/2010 RESUBMITTAL 10/07/2010 COMPLETED Review Details
10/07/2010 RESUBMITTAL 11/29/2010 COMPLETED Review Details

Outstanding Activity Conditions

Permit Number - T10CM02502
Permit Status: C of o
Permit Description: TI:AUTO ZONE
Total Outstanding Activity Conditions - 1
Date Name
09/08/2010 PLANS EXPIRE IN 180 DAYS FROM DATE OF SUBMITTAL. PERMITS EXPIRE IN 180 DAYS FROM DATE OF ISSUE OR LAST INSPECTION.

Completed Inspections

Permit Status: C of o
Permit Number: T10CM02502
Permit Description: TI:AUTO ZONE
Total Completed Inspections - 26
Date Description Inspector Results Comments
12/14/2010 EXCAVATION/LAYOUT REBAR & ZON JBURGE Approved 1) S.W. COLUMN FOOTING AND CUM WALL-POURED & GROUTED (SPECIAL INSPECTION)
12/14/2010 FRAMING JBURGE Approved IVRS - Inspection :*
1) MAIN ENTRY CANOPY CEILING-OK TO COVER
12/15/2010 STUCCO MESH JBURGE Approved IVRS - Inspection :*
1) SOUTH AND SOUTHWEST FACADE-OK TO STUCCO
12/20/2010 MECHANICAL - INTERMEDIATE JMILITEL Approved IVRS - Inspection :*
PROVIDE APPROVED APLANS
SEE ENGINEER FOR DIRECTION ON FIRE RATED CEILING
12/21/2010 ELECTRIC - ABOVE CEILING RMORENO Approved IVRS - Inspection :*
1) 2" EXISTING PIPE TO GUTTER TO BE ACCESSIBLE BY 2/2 DOOR AND TO BE STRAPPED FOR FINAL
2) CEILING LIGHT RUN IN MC OK
3) GROUNDING ELECTRODE IN EMT TO BE BONDED ON BOTH ENDS OR PUT PVC
12/21/2010 ELECTRIC - SERVICE UPGRADE RMORENO Approved IVRS - Inspection :*
12/30/2010 MECHANICAL - ABOVE CEILING MRAMBER Approved IVRS - Inspection :*
1) PROVIDE MINIMUM R-8 FLEX DUCT
2) PROVIDE SEISMIC RETRAINTS ON ALL T-BAR REGISTERS
3) PROVIDE MINIMUM 2" BEADED COLLARS AT ALL FLEX DUCT CONNECTIONS
4) COMPLETE DUCT STEALING AND DUCT WRAP
5) VERIFY 2" LINER IN LINED DUCT DROPS
01/06/2011 RIGHT OF WAY - FINAL P.Whiddon Approved
01/07/2011 NPPO - FINAL MRUSSO Approved
01/07/2011 LANDSCAPE - FINAL MRUSSO Approved
01/07/2011 ENGINEERING - FINAL MRUSSO Approved
01/14/2011 BUILDING ABOVE CEILING JBURGE Approved IVRS - Inspection :*
1) OK TO SET CEILING TILE
01/26/2011 ELECTRIC - INTERMEDIATE RMORENO Approved IVRS - Inspection :*
01/26/2011 SHEET ROCK NAILING JBURGE Approved IVRS - Inspection :*
03/15/2011 PLUMBING - PRE SLAB BBENEDON Approved IVRS - Inspection :*
03/15/2011 PLUMBING - ROUGH, SOIL BBENEDON Approved IVRS - Inspection :*
03/17/2011 PLUMBING - FINAL BBENEDON Approved IVRS - Inspection :*
03/17/2011 PLUMBING - ABOVE CEILING BBENEDON Approved IVRS - Inspection :*
03/17/2011 PLUMBING - PROGRESS BBENEDON Approved IVRS - Inspection :*
03/17/2011 PLUMBING - INTERMEDIATE BBENEDON Approved IVRS - Inspection :*
03/21/2011 SIGN - FINAL JYBARRA Approved
03/21/2011 ELECTRIC - FINAL RMORENO Approved IVRS - Inspection :*
03/24/2011 MECHANICAL - FINAL JMILITEL Approved IVRS - Inspection :*
1) SMOKE DETECTOR TEST OK
2) AIR BALANCE OK
3) OK FOR FINAL
03/24/2011 BUILDING - FINAL JBURGE Approved IVRS - Inspection :*
03/24/2011 CERTIFICATE OF OCCUPANCY JBURGE Approved IVRS - Inspection :*