Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit: T10BU01842
Permit Details
Apply Date:
12/14/2010
Applicant:
RICK ENGINEERING
Description:
GRADING/SWPPP
Contractors:
- SEPULVEDA COMMERCIAL DEVELOPMENT INC
Permit Reviews
Permit Number - T10BU01842
Permit Status: Final
Permit Description: GRADING/SWPPP
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
08/17/2011 | RESUBMITTAL - GRADING | 08/17/2011 | COMPLETED |
Outstanding Activity Conditions
Permit Number - T10BU01842
Permit Status: Final
Permit Description: GRADING/SWPPP
Total Outstanding Activity Conditions - 1
Date | Name |
---|---|
12/14/2010 | PLANS EXPIRE IN 180 DAYS FROM DATE OF SUBMITTAL. PERMITS EXPIRE IN 180 DAYS FROM DATE OF ISSUE OR LAST INSPECTION. |
Completed Inspections
Permit Status: Final
Permit Number: T10BU01842
Permit Description: GRADING/SWPPP
Total Completed Inspections - 26
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
09/01/2011 | ENGINEERING PRE-CONSTRUCTION | JFEMLING | Approved | Met with contractor and discussed project, SWPPP, water harvest , NPPO, LS and project close out |
09/06/2011 | STORMWATER INSTALL OF CONTROLS | JFEMLING | Approved | Controls along the north edge of property in place as well as construction entrance. |
11/08/2011 | SWPPP CORRECTION NOTICE | DROBERTS | Approved | MINOR TRACKOUT NOTED, CREW ADVISED TO CLEAN THE STREETS AS MUCH AS POSSIBLE. |
11/08/2011 | STORMWATER FOLLOW-UP INSP | DROBERTS | Approved | NO CONCERNS AT THIS TIME. |
11/08/2011 | GRADING - INTERMEDIATE | DROBERTS | Approved | CREWS CONTINUE TO WORK ON THE CONSTRUCTION OF THE WALLS ALONG THE SOUTH, EAST, AND WEST SIDES OF THE BUILDING. |
06/07/2012 | GRADING - CHECK FOR ACTIVITY | DROBERTS | Approved | |
06/07/2012 | GRADING - REBAR | DROBERTS | Approved | |
06/07/2012 | GRADING - TIER REV | DROBERTS | Approved | |
06/08/2012 | NPPO - FINAL | DROBERTS | Approved | A MONITORING REPORT WILL BE GIVEN TO JOSEPH LINVILLE NOTING WHERE THE CHANGES HAVE BEEN MADE TO THE NPPO PLANT LIST. I HAVE ALSO ASKED THE LANDSCAPE ARCHITECT TO NOTE IN THAT REPORT THAT HE IS ACCEPTING THE STAKING METHOD THAT HAS BEEN UTILIZED BY THE CONTRACTOR. I HAVE ASKED FOR ALL TREES TO BE STAKED AS SHOWN ON THE APPROVED PLANS, THIS WILL INCLUDE ALL OF THE ISLANDS WITHIN THE PARKING LOT AND ALL NEW TREES ADJACENT TO THE WASH AREA ON THE NORTHSIDE OF THE PROJECT. |
06/08/2012 | NPPO - FINAL | DROBERTS | Approved | |
06/08/2012 | LANDSCAPE INSPECTION | DROBERTS | Approved | |
06/08/2012 | LANDSCAPE INSPECTION | DROBERTS | Approved | |
06/08/2012 | LANDSCAPE INSPECTION | DROBERTS | Approved | |
06/08/2012 | RAINWATER - FINAL | DROBERTS | Approved | |
06/08/2012 | RAINWATER - INTERMEDIATE | DROBERTS | Approved | |
06/08/2012 | RAINWATER - INTERMEDIATE | DROBERTS | Approved | |
06/08/2012 | STORMWATER FINAL INSPECTION | DROBERTS | Approved | |
06/08/2012 | GRADING - FINAL | DROBERTS | Approved | |
06/08/2012 | GRADING - FINAL | DROBERTS | Approved | |
06/08/2012 | GRADING - FINAL | DROBERTS | Approved | |
06/08/2012 | GRADING - FINAL | DROBERTS | Approved | |
06/08/2012 | GRADING - FINAL | DROBERTS | Approved | |
06/08/2012 | GRADING - FINAL | DROBERTS | Approved | |
06/08/2012 | GRADING - FINAL | DROBERTS | Approved | |
06/08/2012 | GRADING - FINAL | DROBERTS | Approved | |
03/23/2017 | PERMIT FINALED | DROBERTS | Approved | THIS PERMIT WAS CLOSED ON 6/8/2012 BUT WAS NEVER FINALED IN THE OFFICE |