Inspection History Details
Inspection Status: Approved
Inspection History: STORMWATER FOLLOW-UP INSP
Permit Number - T10BU01842
Inspection Description - STORMWATER FOLLOW-UP INSP
Inspection Status - Approved
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
06/08/2012 | STORMWATER FOLLOW-UP INSP | Approved | ||
06/08/2012 | STORMWATER FOLLOW-UP INSP | Continued | ||
06/08/2012 | STORMWATER FOLLOW-UP INSP | Continued | ||
06/08/2012 | STORMWATER FOLLOW-UP INSP | Continued | ||
06/08/2012 | STORMWATER FOLLOW-UP INSP | Approved | ||
03/21/2012 | STORMWATER FOLLOW-UP INSP | Continued | NO CONCERNS AT THIS TIME. | |
11/08/2011 | STORMWATER FOLLOW-UP INSP | Continued | NO CONCERNS AT THIS TIME. | |
10/21/2011 | STORMWATER FOLLOW-UP INSP | Continued | NO CONCERNS AT THIS TIME. | |
10/17/2011 | STORMWATER FOLLOW-UP INSP | Continued | NO CONCERNS AT THIS TIME. | |
10/05/2011 | STORMWATER FOLLOW-UP INSP | Continued | NO CONCERNS AT THIS TIME. | |
09/29/2011 | STORMWATER FOLLOW-UP INSP | Continued | NO CONCERNS AT THIS TIME. | |
09/21/2011 | STORMWATER FOLLOW-UP INSP | Continued | THE REQUESTED CHANGES TO THE SWPPP CONTROLS HAVE BEEN ADDRESSED THROUGHOUT THE SITE. | |
09/19/2011 | STORMWATER FOLLOW-UP INSP | Correction Required | MET ONSITE WITH THE SUBCONTRACTOR PERFORMING THE EARTHWORK AND ADVISED HIM THAT SOME OF THE STORMWATER CONTROLS NEED TO BE IMPROVED TO PREVENT PROBLEMS WITH FUTURE RAINS. ON THE NORTHSIDE OF THE SITE THEY NEED TO PLACE STRAWBALES IN THE AREA WHERE THE SITE DRAINS INTO THE ADJACENT CHANNEL. ALSO THERE ARE SOME AREAS AROUND THE PERIMETER OF THE SITE THAT NEED SOME ADDITIONAL WORK SINCE THE RAINS IN THE PAST 2 WEEKS. THEY WILL INFORM THE FORMAN OF THE SITE OF THE CHANGES THAT NEED TO BE MADE. I WILL RE-INSPECT THE SITE LATER THIS WEEK TO VERIFY THAT THE CHANGES HAVE BEEN MADE. | |
09/06/2011 | STORMWATER FOLLOW-UP INSP | Continued | Controls in along the north edge of property and construction entrance. |