Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Inspection History Details
Inspection Status: Continued
Inspection History: GRADING - INTERMEDIATE
Permit Number - T10BU01842
Inspection Description - GRADING - INTERMEDIATE
Inspection Status - Continued
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
06/08/2012 | GRADING - INTERMEDIATE | Continued | ||
06/08/2012 | GRADING - INTERMEDIATE | Continued | ||
06/08/2012 | GRADING - INTERMEDIATE | Continued | ||
06/08/2012 | GRADING - INTERMEDIATE | Continued | ||
06/08/2012 | GRADING - INTERMEDIATE | Continued | ||
06/08/2012 | GRADING - INTERMEDIATE | Continued | ||
06/08/2012 | GRADING - INTERMEDIATE | Continued | ||
06/08/2012 | GRADING - INTERMEDIATE | Approved | ||
06/08/2012 | GRADING - INTERMEDIATE | Approved | ||
03/21/2012 | GRADING - INTERMEDIATE | Continued | CREWS CONTINUE TO WORK ON THE EXTERIOR AND INTERIOR OF THE BUILDING AND ARE PREPARING PORTIONS OF THE SITE FOR GRADING. | |
11/08/2011 | GRADING - INTERMEDIATE | Continued | CREWS CONTINUE TO WORK ON THE CONSTRUCTION OF THE WALLS ALONG THE SOUTH, EAST, AND WEST SIDES OF THE BUILDING. | |
10/21/2011 | GRADING - INTERMEDIATE | Continued | CREWS CONTINUE TO WORK ON WALL CONSTRUCTION, AND THE UTILITIES FOR THE SITE. | |
10/17/2011 | GRADING - INTERMEDIATE | Continued | WALL CONSTRUCTION CONTINUES | |
10/05/2011 | GRADING - INTERMEDIATE | Continued | CREWS WORKING ON THE PLACEMENT OF REBAR IN THE FOOTER AREA ALONG THE WEST SIDE OF THE STRUCTURE' AND POURING AT VARIOUS LOCATIONS ON ALL OTHER SIDES AS NEEDED. ALSO THEY HAVE STARTED ERECTING THE SOUTHERN WALL, THEY ARE CURRENTLY WORKING ON THE SECOND COURSE OF THE WALL AT THIS TIME. | |
09/29/2011 | GRADING - INTERMEDIATE | Continued | THE CONTRACTOR IS WORKING ON THE EXCAVATION OF THE FOOTERS AND THE PLACEMENT OF THE REBAR FOR A FUTURE POUR ON THE SITE. THERE APPEARS TO BE NO CONCERNS FOR THIS SITE AT THIS TIME. | |
09/21/2011 | GRADING - INTERMEDIATE | Continued | THE REQUESTED CHANGES TO THE SWPPP CONTROLS HAVE BEEN ADDRESSED THROUGHOUT THE SITE. THE CREW CONTINUES TO BALANCE OUT THE SITE, AND ARE CURRENTLY HAVING THE COMPACTION TEST TAKIEN. WESTERN TECHNOLOGIES HAS INFORMED ME THAT THE TEST HAVE FAILED TODAY AND WILL NEED TO BE RECOMPACTED IN SOME OF THE AREAS ONSITE. HE WILL WORK WITH THE CREWS TO ENSURE THAT THE TEST ARE PASSING PRIOR TO ALLOWING FOR THE PLACEMENT OF ANY ADDITIONAL FILL MATERIAL. |
|
09/19/2011 | GRADING - INTERMEDIATE | Correction Required | MET ONSITE WITH THE SUBCONTRACTOR PERFORMING THE EARTHWORK AND ADVISED HIM THAT SOME OF THE STORMWATER CONTROLS NEED TO BE IMPROVED TO PREVENT PROBLEMS WITH FUTURE RAINS. ON THE NORTHSIDE OF THE SITE THEY NEED TO PLACE STRAWBALES IN THE AREA WHERE THE SITE DRAINS INTO THE ADJACENT CHANNEL. ALSO THERE ARE SOME AREAS AROUND THE PERIMETER OF THE SITE THAT NEED SOME ADDITIONAL WORK SINCE THE RAINS IN THE PAST 2 WEEKS. THEY WILL INFORM THE FORMAN OF THE SITE OF THE CHANGES THAT NEED TO BE MADE. I WILL RE-INSPECT THE SITE LATER THIS WEEK TO VERIFY THAT THE CHANGES HAVE BEEN MADE. THE CREWS ARE WORKING ON CUTTING AND FILLING THE SITE AS SHOWN ON THE APPROVED PLANS, THIS WORK WILL CONTINUE THROUGHOUT THIS WEEK. |
|
09/06/2011 | GRADING - INTERMEDIATE | Continued | Temp nursery set up of TOS plants. rough grading continues onsite. | |
09/01/2011 | GRADING - INTERMEDIATE | Continued | rough grading for site began today, need to instll SWPPP controls, and install fence around 1 NPPO tree. |