Permit: T10BU01653
Permit Details
Apply Date:
11/02/2010
Applicant:
RICK ENGINEERING
Description:
GRADING/SWPPP
Contractors:
- HAZEN LTD , STEVE
Permit Reviews
Permit Number - T10BU01653
Permit Status: Final
Permit Description: GRADING/SWPPP
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
04/22/2011 | RESUBMITTAL - GRADING | 05/26/2011 | COMPLETED |
Outstanding Activity Conditions
Permit Number - T10BU01653
Permit Status: Final
Permit Description: GRADING/SWPPP
Total Outstanding Activity Conditions - 1
Date | Name |
---|---|
11/02/2010 | PLANS EXPIRE IN 180 DAYS FROM DATE OF SUBMITTAL. PERMITS EXPIRE IN 180 DAYS FROM DATE OF ISSUE OR LAST INSPECTION. |
Completed Inspections
Permit Status: Final
Permit Number: T10BU01653
Permit Description: GRADING/SWPPP
Total Completed Inspections - 12
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
06/09/2011 | ENGINEERING PRE-CONSTRUCTION | DROBERTS | Approved | MET THE CREW ON-SITE THEY ARE WORKING ON THE REMOVAL OF ALL PLANT MATERIAL, TRASH AND DEBRIS, AND BLOCK PREPARING THE AREA FOR THE FUTURE CUT AND FILL OPERATION THAT WILL HAPPEN HERE LATER THIS WEEK AND NEXT WEEK. |
07/01/2011 | STORMWATER INSTALL OF CONTROLS | DROBERTS | Approved | AREAS APPEAR TO BE COMPLETE AT THIS TIME. MODIFICATIONS TO THE SITE WILL BE MADE AS NEEDED AND THE CHANGES WILL BE NOTED ON THE SWPPP PLANS REMAINING ON SITE. |
07/19/2011 | GRADING - CHECK FOR ACTIVITY | DROBERTS | Approved | NO WORK ONSITE AT THIS TIME. |
11/07/2011 | SWPPP CORRECTION NOTICE | DROBERTS | Approved | PREVIOUS NOTED CONCERNS HAVE BEEN ADDRESSED AT THIS TIME. |
12/14/2011 | STORMWATER FOLLOW-UP INSP | DROBERTS | Approved | NO CONCERNS AT THIS TIME. |
12/14/2011 | GRADING - INTERMEDIATE | DROBERTS | Approved | CREWS WORKING ON UTILITY TRENCHING ALONG THE WEST SIDE OF THE SITE, AND PLACING BLOCKS ALONG THE SOUTH SIDE OF THE SITE FOR THE PERIMETER WALL. |
03/04/2013 | STORMWATER FINAL INSPECTION | MRUSSO | Approved | |
03/04/2013 | GRADING - TIER REV | MRUSSO | Approved | |
06/13/2017 | GRADING - FINAL | DROBERTS | Approved | THIS SITE IS BEING CLOSED AND FINALIZED WITH THE FOLLOWING STIPULATION: PHASE 1 OF THE PROJECT HAS BEEN COMPLETED PER THE APPROVED PLANS. THE REMAINING PORTION OF THE SITE WILL BE CONSTRUCTED UNDER A NEWLY APPROVED DEVELOPMENT PACKAGE, PERMIT NUMBER DP16-0212. ALL REMAINING INSPECTIONS CAN BE VIEWED UNDER THE CURRENT PERMIT AND FINALED AT A LATER DATE AS DISCUSSED ON THIS DATE WITH PATRICIA GEHLEN. |
05/17/2019 | RAINWATER - INTERMEDIATE | RLEDONNE | Approved | |
05/17/2019 | RAINWATER - FINAL | RLEDONNE | Approved | |
05/17/2019 | GRADING - REBAR | RLEDONNE | Approved |