Inspection History Details
Inspection Status: Approved
Inspection History: ENGINEERING PRE-CONSTRUCTION
Permit Number - T10BU01653
Inspection Description - ENGINEERING PRE-CONSTRUCTION
Inspection Status - Approved
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
06/09/2011 | ENGINEERING PRE-CONSTRUCTION | Approved | MET THE CREW ON-SITE THEY ARE WORKING ON THE REMOVAL OF ALL PLANT MATERIAL, TRASH AND DEBRIS, AND BLOCK PREPARING THE AREA FOR THE FUTURE CUT AND FILL OPERATION THAT WILL HAPPEN HERE LATER THIS WEEK AND NEXT WEEK. | |
06/06/2011 | ENGINEERING PRE-CONSTRUCTION | Continued | MET ON SITE WITH THE OWNER AND THE CONTRACTOR FOR THE GRADING PORTION TO DISCUSS WHAT IS THE INTENT FOR THE SITE IN PHASE 1 PORTION OF THE WORK. THEY WILL COMPLETE THE WESTERN PORTION OF THE SITE AND ALL SUPPORTING AREAS FOR BUILDING 1, THE REMAINING AREA OF THE SITE NOTED AS PHASE 2 ON THE PLANS WILL BE DONE AT A LATER DATE WHEN FUNDS ARE AVAILABLE. I REMINDED THE OWNER THAT DEPENDING ON WHAT IS NEEDED BY THE ZONING AND ENGINEERING SECTIONS WILL DETERMINE IF ANY OF THE BOND MONEY CAN BE RETURNED AT THAT TIME. WORK FOR THIS SITE SHOULD BEGIN ON THE 6/9/2011 AT THIS TIME, I WILL RETURN THEN TO VERIFY THAT THIS PROJECT HAS STARTED AND COMPLETE ALL NECESSARY INSPECTIONS FOR THE STORMWATER CONTROLS. | |
06/03/2011 | ENGINEERING PRE-CONSTRUCTION | Continued | CONTACTED THE PROPERTY OWNER OF THIS SITE AND HAVE ARRANGED TO MEET ON 6/6/2011 AND DISCUSS WHAT WILL BE THE SEQUENCE OF THE WORK FOR THIS SITE. |