Permit: T10BU01653

Parcel: 13405118Q


Addresses:

1010 S HARRISON RD


Inspection Status: Approved

Inspection History: GRADING - INTERMEDIATE

Permit Number - T10BU01653

Inspection Description - GRADING - INTERMEDIATE

Inspection Status - Approved

Date Description Inspector Results Comments
03/04/2013 GRADING - INTERMEDIATE Approved
11/16/2012 GRADING - INTERMEDIATE Continued FOLLOW UP ON FINISHING SITE WORK. CONTRACTOR WORKING ON LANSCAPE ISLANDS AND DRAINAGE PATTERNS.
NO STORM WATER CONCERNS
11/13/2012 GRADING - INTERMEDIATE Continued
10/31/2012 GRADING - INTERMEDIATE Continued 1) NO SWPPP CONCERNS AT THIS TIME. MAINTAIN YOUR SEDIMENT BIRM ALONG THE NE CORNER UNTIL THE SITE IS STABILIZED.
2) CALL FOR INSPECTION WHEN SITE HAS BEEN STABILIZED SO I CAN FINAL THE STORM WATER.
3) REPAIR ANY EROSION DAMAGE PRIOR TO FINAL
4) COMPLETE ALL CONSTRUCTION ASSOCIATED WITH PHASE ONE OF THE PROJECT.
02/29/2012 GRADING - INTERMEDIATE Continued CREWS CONTINUE TO WORK ON THIS SITE
01/31/2012 GRADING - INTERMEDIATE Continued I CHECKED THE SITE TO SEE WHAT TYPE OF WORK IS GOING ON AT THIS TIME, THE FOLLOWING ITEMS ARE BEING WORKED ON: 1) A CREW IS FORMING AND POURING THE NEW CURB ALONG THE SOUTHSIDE OF THE PROJECT ON THE NORTH SIDE OF OLD SPANISH TRAIL FOR THE SOUTHERN ENTRANCE. 2) FRAMING ON THE 2ND FLOOR OF THE WEST BUILDING CONTINUES. 3) MINOR GRADING OF THE BASIN AREA SO THAT IT IS COMPLETE AND READY FOR THE LANDSCAPING.
01/18/2012 GRADING - INTERMEDIATE Continued LOOKED OVER THE SITE AND MET WITH THE DEVELOPER TOO DISCUSS WHAT IS CURRENTLY HAPPENING AT THIS TIME AND WHAT IS THE EXPECTATIONS IN THE NEAR FUTURE. THEY ARE CURRENTLY CONTINUING WITH THE FRAMEING OF THE WESTERN STRUCTURES 1ST AND 2ND FLOOR AREAS ALONG WITH THE INTERNAL WALLS. THEY ARE ALSOWORKING ON THE BACKFILL PLACEMENT OVER THE FOOTERS OF THE PERIMETER WALLS ON THE SOUTH SIDE OF THE PROJECT. I HAVE ASKED THAT THEY MAKE SURE AND COMPACT ALL OF THESE AREAS PRIOR TO THEIR COMPLETION, SOME LOOSE AREAS HAVE BEEN NOTED. A CREW IS WORKING ON THE GRADING OF THE SIDEWALK AND WHEELCHAIR ACCESS RAMPS ON THE NORTHSIDE OF THE SITE. THIS AREA WILL ALSO BE LOOKED AT BY THE BUILDING FINAL INSPECTORS FOR COMPACTION AND GRADE. PHOTOGRAPHS WERE TAKEN OF THE SITE DURING THIS VISIT FOR FUTURE REFERANCES. I REMINDED THE DEVELOPER TO ADVISE ME WHEN THEY WILL BE GRADING THE PARKING LOT AREAS SO THAT WE CAN INSPECT FOR THE STORMWATER RUN OFF.
12/14/2011 GRADING - INTERMEDIATE Continued CREWS WORKING ON UTILITY TRENCHING ALONG THE WEST SIDE OF THE SITE, AND PLACING BLOCKS ALONG THE SOUTH SIDE OF THE SITE FOR THE PERIMETER WALL.
12/08/2011 GRADING - INTERMEDIATE Continued CREWS ARE WORKING ON THE INSTALLATION OF THE OUTER PERIMETER WALL ALONG THE WEST SIDE OF THE SITE AND AT THE NORTHWEST CORNER ON THE NORTHSIDE.
12/05/2011 GRADING - INTERMEDIATE Continued NO WORK AT THIS TIME DUE TO THE PREVIOUS RAINS.
11/07/2011 GRADING - INTERMEDIATE Continued CHECKED ON THIS SITE TO SEE IF ANYONE WAS WORKING, LOOKS LIKE ALL WORK WAS CALLED DUE TO THIS MORNINGS RAIN.
10/14/2011 GRADING - INTERMEDIATE Continued CREWS WORKING ON EXCAVATING FOR THE EAST BUILDING FOOTERS AT THIS TIME. NO OTHER WORK HAPPENING AT THIS TIME, NO OTHER CONCERNS AT THIS TIME.
10/12/2011 GRADING - INTERMEDIATE Continued CREWS WORKING ON THE NORTHSIDE OF THE SITE ON THE ELECTRICAL FOR THE NEW TRAANSFORMER LOCATION.
09/29/2011 GRADING - INTERMEDIATE Continued NO CHANGE, CREWS CONTINUE TO WORK ON LEVELING SITE. NO WORK AT THIS TIME.
08/15/2011 GRADING - INTERMEDIATE Continued THERE IS NO WORK HAPPENING ON SITE AT THIS TIME, ALL OF THE UNDERGROUND UTILITIES APPEAR TO HAVE BEEN COMPLETED AT THIS TIME.
07/11/2011 GRADING - INTERMEDIATE Continued NO WORK AT THIS TIME.
07/07/2011 GRADING - INTERMEDIATE Continued CREW WORKING ON EXCAVATING FOR THE RETENTION / DETENTION BASIN LOCATED IN THE NORTHWEST CORNER OF THE SITE.
07/01/2011 GRADING - INTERMEDIATE Continued CREWS WORKING ON BALANCING THE SITE ON THE CUT AND FILL AREAS.
06/20/2011 GRADING - INTERMEDIATE Partial Approval THE CREW IS STILL WORKING ON THE REMOVAL OF VEGITATION AND SHIFTING OF MATERIAL TO BALANCE THE SITES CUT AND FILL REQUIREMENTS. THERE IS SOME MINOR TRACK OUT NOTED ON THIS SITE THAT THE CONTRACTOR WILL BE NOTIFIED TO HAVE CLEANED. THIS SITE WILL BE CHECKED AT THE END OF THIS WEEK TO SEE THAT THE OFF-SITE MATERIAL IS REMOVED FROM THE PEDESTRIAN PATH AREA AND ADJACENT ROADWAY.