Permit Details

Status:
Final
Type:
Grading and SWPPP
Address:
191 S PLUMER AV
Address NEW:
191 S PLUMER AV
Apply Date:
10/13/2010
Applicant:
GEORGE HAYDUKE
Description:
GRADING:
Contractors:
  • C A DEVELOPMENT AND CONSTRUCTION L L C

Permit Reviews

Permit Number - T10BU01569
Permit Status: Final
Permit Description: GRADING:
Start Date Submittal Complete Date Status  
10/13/2010 PLANS OK TO SUBMIT - GRADING 10/14/2010 COMPLETED Review Details
10/14/2010 GRADING 10/29/2010 COMPLETED Review Details
11/17/2010 RESUBMITTAL - GRADING ALL 11/22/2010 COMPLETED Review Details
11/22/2010 RESUBMITTAL - GRADING 11/29/2010 COMPLETED Review Details

Completed Inspections

Permit Status: Final
Permit Number: T10BU01569
Permit Description: GRADING:
Total Completed Inspections - 11
Date Description Inspector Results Comments
12/15/2010 STORMWATER INSTALL OF CONTROLS JFEMLING Approved Storm controls not installed at this time.
12/20/2010 GRADING - CHECK FOR ACTIVITY JFEMLING Approved equipment starting to show up on site along with roll off and porta john, no one onsite to talk about schedule or pre-con.
01/10/2011 ENGINEERING PRE-CONSTRUCTION JFEMLING Approved Met with general contractor CA Development, 631-4045, discussed SWPPP and grading plan, this project has water harvesting so informed contractor about inspections required with water harvest, also discussed PAAL width, HC access and ramps, final permit close out.
06/08/2011 GRADING - REBAR JFEMLING Approved OK to pour footing for dumpster enclosure
11/10/2011 STORMWATER FOLLOW-UP INSP RLEDONNE Approved
11/10/2011 RAINWATER - FINAL RLEDONNE Approved
11/10/2011 RAINWATER - INTERMEDIATE RLEDONNE Approved
11/10/2011 GRADING - TIER REV RLEDONNE Approved
11/10/2011 GRADING - FINAL RLEDONNE Approved
11/10/2011 GRADING - INTERMEDIATE RLEDONNE Approved
11/10/2011 STORMWATER FINAL INSPECTION RLEDONNE Approved