Permit: T10BU01492
Permit Details
Apply Date:
09/27/2010
Applicant:
N/A
Description:
GRADING:800CY CUT 50CY FILL
Contractors:
- DAMITIO CONSTRUCTION INC ,
Permit Reviews
Permit Number - T10BU01492
Permit Status: Final
Permit Description: GRADING:800CY CUT 50CY FILL
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 09/27/2010 | PLANS OK TO SUBMIT - GRADING | 09/27/2010 | COMPLETED |
| 09/27/2010 | GRADING | 10/27/2010 | COMPLETED |
| 11/02/2010 | RESUBMITTAL - GRADING ALL | 01/18/2011 | COMPLETED |
Outstanding Activity Conditions
Permit Number - T10BU01492
Permit Status: Final
Permit Description: GRADING:800CY CUT 50CY FILL
Total Outstanding Activity Conditions - 1
| Date | Name |
|---|---|
| 09/27/2010 | PLANS EXPIRE IN 180 DAYS FROM DATE OF SUBMITTAL. PERMITS EXPIRE IN 180 DAYS FROM DATE OF ISSUE OR LAST INSPECTION. |
Completed Inspections
Permit Status: Final
Permit Number: T10BU01492
Permit Description: GRADING:800CY CUT 50CY FILL
Total Completed Inspections - 7
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 03/07/2011 | ENGINEERING PRE-CONSTRUCTION | MRUSSO | Approved | 1) <1 AC NO SWPPP REQUIRED, HOWEVER CONTRACTOR MUST ENSURE TRACKING OF SOIL IS SWEPT UP ROUTINELY. 2) PROVIDE A CERTIFICATION STATEMENT FROM THE ENG OF RECORD PRIOR TO FINAL GRADING APPROVAL. 3) CALL FOR ANY CHANGES AND/OR CONCERNS WITH SITE WORK. 4) ESURE ALL WASH OUT AND BUILDING MATERIALS ARE KEPT ON SITE. |
| 06/02/2011 | RAINWATER - INTERMEDIATE | JFEMLING | Approved | OK to pave, all areas draining per plan, contractor will excavate the WH areas as needed. |
| 06/16/2011 | RAINWATER - FINAL | MRUSSO | Approved | |
| 06/16/2011 | GRADING - FINAL | MRUSSO | Approved | |
| 06/16/2011 | GRADING - INTERMEDIATE | MRUSSO | Approved | |
| 06/16/2011 | GRADING - CHECK FOR ACTIVITY | MRUSSO | Approved | |
| 06/16/2011 | GRADING - TIER REV | MRUSSO | Approved |