Permit Number: T10BU01492
Parcel: 10408075B

Address:
4495 N ORACLE RD

Review Status: Completed

Review Details: GRADING

Permit Number - T10BU01492
Review Name: GRADING
Review Status: Completed
Review Date Reviewer's Name Type of Review Description Status Comments
09/29/2010 BIANCA RAMIREZ ENGINEERING REVIEW Denied DATE: October 4, 2010
SUBJECT: Grading
TO: ESP Group
LOCATION: 4495 N Oracle Road, Tucson, AZ , T13S, R13E, Section 23, Ward 3
REVIEWERS: Bianca Ramirez, CFM
ACTIVITY: T08CM01458 (First Review)


RESUBMITTAL REQUIRED: Grading Plan, Drainage Report and Soils Report.

SUMMARY: Engineering Division of Development Services Department has received and reviewed the proposed grading plan for the above referenced property. Engineering Division does not recommend approval of the grading plan at this time. Please address the following review comments prior to the next submittal.

The grading plan cannot be approved as submitted. Please address the following review comments prior to the next submittal.

Please include a response letter to the comments along with the

RESUBMITTAL REQUIRED: Grading Plan, Drainage Report and Soils Report

The Grading Plan (GP) and Drainage Report (DR) cannot be approved as submitted. Please address the following review comments prior to the next submittal.

Please include a response letter to the comments along with the corrected copies of the grading plan.

Grading Plan:

1. The basis of elevation is too far from site. Provide local basis of elevation on site, label datum and show benchmark in plan view.
2. Reprint grading plan so that elevation contour lines and labeling are legible.
3. Verify that the following notes are in the grading plan notes:

a) Call for Pre-construction meeting. For a DSD Engineering Inspection, call IVR (740-6970), or schedule with a Customer Service Representative at the Development Services Department, or contact DSD Engineering at 837-4888, or schedule inspections online at: http://www.ci.tucson.az.us/dsd/Online_Services/Online_Permits/online_permits.html
b) Contact City of Tucson Permits and Codes (791-5100) for City of Tucson right-of-way use permit requirements. Contact ADOT for any right-of-way permit requirements along Oracle Road.
c) The number and location of trees within existing and future sight visibility triangles may be restricted or modified as indicated by City of Tucson inspection in order to preserve visibility.
d) Dust control methods such as water truck will be provided, as well as daily sweeping of public streets.
e) There shall be no disturbance or stockpiling outside of the approved grading limits as shown on the grading plan.
f) Any revision to the Grading Plan may require a re-submittal of a revised grading plan for review. Contact DSD Engineering at 791-5550 to discuss changes in grading design. If grading construction is expected to last longer than the expiration date of the grading permit, contact DSD to renew/extend the Grading Permit. If Final Grading Inspection has not been completed before the Grading Permit expires, and the permit has not been renewed, additional fees and reviews may be required.
g) If grading construction is expected to last longer than the expiration date of the grading permit, contact DSD to renew/extend the Grading Permit. If Final Grading Inspection has not been completed before the Grading Permit expires, and the permit has not been renewed, additional fees and reviews may be required.
h) Permitee shall notify PDSD when the grading operation is ready for final grading inspection. Final grading approval shall not be given until all work, including onsite improvements, installation of all drainage improvements, utility trenches are backfilled, private paving and curb, permanent protective devices, all erosion control measures have been completed, and all conditions of permit are completed.
i) Letters of completion are required for project completion. Grading completion documentation is required from project engineer at time of final inspections. Revised grading plans or as-builts may also be required.

j) "The approved Grading Plan is the only acceptable construction plan onsite. The Contractor may not use any other plans, such as the approved Tentative Plat and/or Development Plan, for construction purposes. The Contractor may ask the Development Services Inspector to consult with the other approved plans for additional information or details that might not be included on the approved grading plan but needed for completion of work."

k) "Any engineering work to be done below grade (i.e. toe-downs, cutoff walls, drainage pipes/structures, etc.) shall not be back filled until Development Services Inspector inspects the work and approves it."
4. Label north PAAL as one way by providing proper markings and signage. Verify that proper one way signage is provided throughout the site.
5. Please show the proposed roof drainage patterns, 100% of the 10-year flow must be conveyed under the sidewalks. Please provide supporting calculations to demonstrate compliance with D.S. 3-01.4.4. If the location(s) of the roof scuppers have not yet been decided, add a general note indicating sidewalk scuppers (per COT/SD) will be used when the roof scuppers locations have been designed.
6. A permit or a private improvement agreement will be necessary for any work performed within the Right-of-way. Contact Permits and Codes at (520) 791-5100 for permit information.
7. Provide the grading plan number in the lower right hand corner of each sheet of the grading plan.
8. Additional comments may be forthcoming.
Drainage Report: Approved
Geotechnical Report: Approved

If you have any questions, I can be reached at 837-4928 or Bianca.Ramirez@tucsonaz.gov

Bianca Ramirez, CFM
Engineering Associate
City of Tucson - Planning and Development Services Department
201 N. Stone Avenue
P.O. Box 27210
Tucson, Arizona 85726-7210
(520) 837-4928 office
(520) 879-8010 fax
10/04/2010 MICHAEL ST. PAUL ZONING REVIEW Denied October 4, 2010

Development Services Department
Zoning Review Section

Michael St.Paul
Planning Technician

T10BU01492 Grading Plans for D09-0027

Address: 4495 N. Oracle Rd


Comments:

1. The grading plan has been reviewed by Zoning Review Section but cannot approve the plan until it has been approved by the Engineering, and Landscape Review Sections and until all zoning comments or concerns have been addressed.

2. In addition, we could not verify that the grading plan was in compliance with the approved development plan for Zoning Review. Please submit one copy of the approved and stamped Development Plan, Landscape, and NPPO plans with the next grading plan submittal.

3. Zoning will re-review the grading plan on the next submittal to ensure compliance with the approved development plan. Additional comments may be forthcoming.
10/19/2010 ANDREW CONNOR NPPO REVIEW Approv-Cond Ensure that all Engineering comments and concerns are addressed prior NPP / Landscape approval stamp.

Final Status

Task End Date Reviewer's Name Type of Review Description
10/27/2010 DELMA ROBEY OUT TO CUSTOMER Completed