Status:
Final
Type:
Grading and SWPPP
Apply Date:
06/25/2010
Applicant:
T MILLER
Description:
GRADING
Contractors:
  • SUNDT CONSTRUCTION

Permit Reviews

Permit Number - T10BU01020
Permit Status: Final
Permit Description: GRADING
Start Date Submittal Complete Date Status  
06/25/2010 GRADING 06/29/2010 COMPLETED Review Details
08/16/2010 PLANS OK TO SUBMIT - GRADING 08/16/2010 COMPLETED Review Details
08/16/2010 REVISION - GRADING 08/18/2010 COMPLETED Review Details

Outstanding Activity Conditions

Permit Number - T10BU01020
Permit Status: Final
Permit Description: GRADING
Total Outstanding Activity Conditions - 1
Date Name
06/25/2010 PLANS EXPIRE IN 180 DAYS FROM DATE OF SUBMITTAL. PERMITS EXPIRE IN 180 DAYS FROM DATE OF ISSUE OR LAST INSPECTION.

Completed Inspections

Permit Status: Final
Permit Number: T10BU01020
Permit Description: GRADING
Total Completed Inspections - 10
Date Description Inspector Results Comments
08/09/2010 ENGINEERING PRE-CONSTRUCTION MRUSSO Approved INITIAQL DEMO WILL INVOLED REMOVAL OF EXISTING PARKING AREA <1AC. TRACK OUT PAD/STABILIZED ENTRANCE WILL BE REQUIRED AND USED DURING THIS PHASE.

ENSURE PUBLIC ROADWAYS ARE SWEPT ON A ROUTINE BASIS.

AS REMEDIATION OF THE SITE PROGRESSES, THE APPROVED STORM WATER PLAN MUST BE IMPLEMENTED.
10/07/2010 STORMWATER INSTALL OF CONTROLS MRUSSO Approved SPOKE W/ SUPERINTENDENT, DEMO WORK BEING DONE. CONTRACTOR IS OVER-EXCAVATING AND OLD LANDFILL AND REPLACING WITH CLEAN FILL.
CORRECTION REQUIRED:

1) INSTALL SEDIMENT CONTROLS PROPERLY - SILT SOCK MUST BE OVERLAPPED AND BE STAKED DOWN. SILT FENCE MUST BE TRENCHED IN AT THE BOTTOM.
2) ENSURE SEDIMENT CONTROLS ARE MAINTAINED THOUGHOUT CONSTRUCTION.
3) ENSURE STORM WATER SELF INSPECTIONS ARE PERFORMED AND DOCUMENTED.
4) SWEEP UP TRACKING OFF PUBLIC ROADWAY ON A ROUTINE BASIS.

>.5" RAIN ON SITE, NO SOIL RUN-OFF, MINIMAL TRACKING.
11/09/2010 GRADING - INTERMEDIATE MRUSSO Approved 1) TEMP RAMPS IN THE CURB-LINE ARE IN NON-COMPLIANCE W/ THE COT STORM WATER ORDINANCE. THE CONTRACTOR MUST ALLOW STORM WATER TO FLOW UNOBSTRUCTED ALONG THE CURB LINE.
2) TEMP RAMPS CAN BE INSTALLED AS LONG AS A CONDUIT IS USED TO CONVEY STORM WATER.
3) CONTINUE TO SWEEP UP TRACKED SOIL OFF OF PUBLIC ROADWAYS.
4) REMEDIATION WORK STILL BEING ACCOMPLISHED. TRUCKS ARE HAULING WASTE CONTAMINATED SOIL OFF SITE
12/17/2010 STORMWATER FOLLOW-UP INSP MRUSSO Approved NO CHANGES, NO ACTIVITY TODAY
06/07/2011 LANDSCAPE INSPECTION MRUSSO Approved ALL CONSTRUCTION INSPECTIONS FOR ENGINEERING, AND LANDSCAPE WILL BE ADDRESSED UNDER GRADING PERMIT #T10BU01122.
04/04/2012 STORMWATER FINAL INSPECTION MRUSSO Approved
04/04/2012 GRADING - FINAL MRUSSO Approved
04/04/2012 GRADING - CHECK FOR ACTIVITY MRUSSO Approved
04/04/2012 GRADING - REBAR MRUSSO Approved
01/18/2017 PERMIT FINALED DROBERTS Approved

Documents

File Name Document Type  
001_SHEET 1 OF 1.TIF GRADING PLANS VIEW
002_SHEET 1 OF 2.TIF GRADING PLANS VIEW
003_SHEET 2 OF 2.TIF GRADING PLANS VIEW