Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Inspection History Details
Inspection Status: Approved
Inspection History: GRADING - INTERMEDIATE
Permit Number - T10BU01020
Inspection Description - GRADING - INTERMEDIATE
Inspection Status - Approved
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
06/07/2011 | GRADING - INTERMEDIATE | Approved | ALL CONSTRUCTION INSPECTIONS FOR ENGINEERING, AND LANDSCAPE WILL BE ADDRESSED UNDER GRADING PERMIT #T10BU01122. | |
04/21/2011 | GRADING - INTERMEDIATE | Continued | ENSURE STOCKPILED SOIL AND/OR SPOILS FROM CONSTRUCTION ARE PROTECTED WITH SEDIEMNT CONTROLS. NO SITE WORK TO INSPECT AT THIS TIME. SUPEINTENDENT STATED THAT THEY WOULD BEGIN WORKING ON THE PERIMETER WALL SOON - ENSURE SPOILS ARE PLACED ON THE WORKING SIDE OF THE WALL. |
|
03/29/2011 | GRADING - INTERMEDIATE | Continued | NO SIGNIFICANT STORM WATER CONCERNS, ALL DESCREPENCIES IDENTIFIED HAVE BEEN ADDRESSED. NO SITE WORK YET. NEED TO INSPECT UNDERGROUND STORM DRAINAGE PIPE PRIOR TO COVER. |
|
03/22/2011 | GRADING - INTERMEDIATE | Correction Required | CORRECT ITEMS #2 AND #4 FROM PREVIOUS STORM WATER COMPLIANCE INSPECTION DONE 2/28/11. COMPLY BY 2 WEEKS, NON-COMPLIANCE WILL RESULT IN A NOTICE OF VIOLATION. |
|
03/01/2011 | GRADING - INTERMEDIATE | Correction Required | 1) RE-ESTABLISH SEDIMENT CONTROLS ALONG THE PERIMETER - SOME NEEDS REPLACING. 2) REMOVE ALL EQUIPMENT AND/OR MATERIALS FROM ON TOP OF SILT SOCK - SEDIMENT CONTROLS. 3) RE-ESTABLISH YOUR STABILIZED CONSTRUCTION ENTRANCE - IT HAS SILTED IN. 4) PROVIDE ALL DOCUMENTATION FROM STORM WATER SELF INSPECTIONS PERFORMED EVERY 2 WEEKS AND AFETR A RAIN. WILL FOLLOW UP IN 2 WEEKS - PLEASE CORRECT ITEMS LISTED ABOVE. NO SITE WORK AT THIS TIME |
|
01/28/2011 | GRADING - INTERMEDIATE | Continued | MET WITH SUPERINTENDENT, DISCUSSED STORM WATER REQUIREMENTS AND PROJECT STATUS. CONTRACTORS ARE NOW BACKFILLING AND BLDG THE FOUNDATION FOR THE BLDG. REMEDIATION WORK HAS BEEN COMPLETED. 1) SEDIMENT CONTROLS ARE IN PLACE. 2) STORM WATER SELF INSPECTIONS ARE BEING PERFORMED AND DOCUMENTED. 3) A STABILIZED CONSTRUCTION ENTRANCE IS BEING USED. 4) CONTRACTOR MAY NEED TO SEWEEP THE ADJACENT ACCESS ROAD MORE OFTEN. |
|
01/07/2011 | GRADING - INTERMEDIATE | Continued | NO SIGNIFICANT STORM WATER CONCERNS AT THIS TIME. NO SITE WORK BEING DONE, CONTRACTOR STILL EXCAVATING AND STABILIZING SLOPES OF HOLE. |
|
11/09/2010 | GRADING - INTERMEDIATE | Correction Required | 1) TEMP RAMPS IN THE CURB-LINE ARE IN NON-COMPLIANCE W/ THE COT STORM WATER ORDINANCE. THE CONTRACTOR MUST ALLOW STORM WATER TO FLOW UNOBSTRUCTED ALONG THE CURB LINE. 2) TEMP RAMPS CAN BE INSTALLED AS LONG AS A CONDUIT IS USED TO CONVEY STORM WATER. 3) CONTINUE TO SWEEP UP TRACKED SOIL OFF OF PUBLIC ROADWAYS. 4) REMEDIATION WORK STILL BEING ACCOMPLISHED. TRUCKS ARE HAULING WASTE CONTAMINATED SOIL OFF SITE |
|
10/21/2010 | GRADING - INTERMEDIATE | Continued | HAULING OF SOIL, LOTS OF TRUCK TRAFFIC. CONTRACTOR SWEEPING ROAD DURING HAULING. NO OTHER STORM WATER CONCERNS AT THIS TIME |
|
10/07/2010 | GRADING - INTERMEDIATE | Continued | SPOKE W/ SUPERINTENDENT, DEMO WORK BEING DONE. CONTRACTOR IS OVER-EXCAVATING AND OLD LANDFILL AND REPLACING WITH CLEAN FILL. CORRECTION REQUIRED: 1) INSTALL SEDIMENT CONTROLS PROPERLY - SILT SOCK MUST BE OVERLAPPED AND BE STAKED DOWN. SILT FENCE MUST BE TRENCHED IN AT THE BOTTOM. 2) ENSURE SEDIMENT CONTROLS ARE MAINTAINED THOUGHOUT CONSTRUCTION. 3) ENSURE STORM WATER SELF INSPECTIONS ARE PERFORMED AND DOCUMENTED. 4) SWEEP UP TRACKING OFF PUBLIC ROADWAY ON A ROUTINE BASIS. >.5" RAIN ON SITE, NO SOIL RUN-OFF, MINIMAL TRACKING. |