Permit: T10BU00752
Permit Details
Apply Date:
05/07/2010
Applicant:
N/A
Description:
GRADING
Contractors:
- PROCESS DESIGN BUILD L L C
Permit Reviews
Permit Number - T10BU00752
Permit Status: Final
Permit Description: GRADING
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 05/07/2010 | PLANS OK TO SUBMIT - GRADING | 05/07/2010 | COMPLETED |
| 05/07/2010 | GRADING | 06/14/2010 | COMPLETED |
| 06/14/2010 | RESUBMITTAL - GRADING ALL | 07/15/2010 | COMPLETED |
Outstanding Activity Conditions
Permit Number - T10BU00752
Permit Status: Final
Permit Description: GRADING
Total Outstanding Activity Conditions - 1
| Date | Name |
|---|---|
| 05/07/2010 | PLANS EXPIRE IN 180 DAYS FROM DATE OF SUBMITTAL. PERMITS EXPIRE IN 180 DAYS FROM DATE OF ISSUE OR LAST INSPECTION. |
Completed Inspections
Permit Status: Final
Permit Number: T10BU00752
Permit Description: GRADING
Total Completed Inspections - 10
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 03/23/2011 | GRADING - REBAR | MRUSSO | Approved | |
| 03/23/2011 | ENGINEERING PRE-CONSTRUCTION | MRUSSO | Approved | 1) ADD TEMP SEDIMENT CONTROLS ALONG PERIMETER IN THE SOUTHEAST CORNER IN ORDER TO PREVENT DISTURBED SOIL FROM ENTERING THE PUBLIC DRAINAGE WAY. 2) PRIOR TO FINAL APPROVAL ENSURE AN ELEVATION CERT. FOR THE BLDG PAD IS SUBMITTED AND APPROVED BY THE COT. 3) PRIOR TO FINAL APPROVAL ENSURE A BASIN/DRAINAGE CERT STATEMENT FROM THE ENG/ARCH OF RECORD IS SUBMITTED AND APPROVED BY THE COT. 4) CALL FOR INSPECTION PRIOR TO PAVING. 5) CALL FOR INSPECTION FOR ANY SIGNIFICANT CHANGES TO THE APPROVED PLAN. |
| 11/09/2012 | STORMWATER FINAL INSPECTION | DROBERTS | Approved | |
| 11/09/2012 | STORMWATER FOLLOW-UP INSP | DROBERTS | Approved | |
| 11/09/2012 | GRADING - INTERMEDIATE | DROBERTS | Approved | |
| 11/09/2012 | GRADING - CHECK FOR ACTIVITY | DROBERTS | Approved | |
| 11/09/2012 | GRADING - TIER REV | DROBERTS | Approved | |
| 11/30/2012 | GRADING - FINAL | DROBERTS | Approved | |
| 12/06/2012 | LANDSCAPE INSPECTION | MRUSSO | Approved | AWAITING AS-BUILT AND CERT LETTER, WILL TALK WITH DAVE ROBERTS |
| 10/28/2014 | PERMIT FINALED | kmedina | Approved |