| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 11/09/2012 | GRADING - INTERMEDIATE | Approved | ||
| 08/07/2012 | GRADING - INTERMEDIATE | Continued | I MET THE OWNER ON THIS SITE AND HAVE DISCUSSED WHAT IT IS THAT HE IS PLANNING ON DOING TO COMPLETE THIS SITE AND CLOS OUT ALL OF THE OPEN PERMITS. THEY WILL BE CONTINUEING WITH THE WORK ON THIS SITE IN THE NEXT 2 WEEKS BUT NO SET SCHEDULE AT THIS TIME. THEY WILL ADVISE ME WHEN THEY START THE WORK SO THAT I CAN MEET WITH THEM AND SEE WHAT THE SCHEDULE IS AT THAT TIME. | |
| 07/18/2012 | GRADING - INTERMEDIATE | Continued | NO ONE THIS SITE AT THIS TIME, WILL CONTINUE TO CHECK ON THIS SITE EVERY 2 WEEKS TILL I FIND SOMEONE PERFORMING WORK. | |
| 06/28/2012 | GRADING - INTERMEDIATE | Continued | SUBCONTRACTORS WORKING ON BLDG, NO SITE WORK BEING COMPLETED. NO STORM WATER CONCERNS AT THIS TIME. |
|
| 06/22/2012 | GRADING - INTERMEDIATE | Continued | NO ACTIVITY ON SITE, SITE WORK HAS NOT BEEN COMPLETED. | |
| 04/02/2012 | GRADING - INTERMEDIATE | Continued | MET WITH SUPERINTENDENT/OWNER ON SITE DISCUSSED COMPLETING PROJECT. SITE WORK MUST MATCH THE APPROVED GRADING PLAN OR AN APPROVED GRADING PLAN MUST BE MADE AVAILABLE THAT SHOWS WHAT WAS CONSTRUCTED. NO STORM WATER CONCERNS AT THIS TIME |
|
| 03/20/2012 | GRADING - INTERMEDIATE | Continued | NO CONTACT ON SITE - RAIN DAY, SITE MOSTLY COMPLETED. NO STORM WATER CONCERNS |
|
| 02/14/2012 | GRADING - INTERMEDIATE | Continued | NO CHANGES, CONTRACTOR HAS NOT CALLED IN AN INSPECTION TO FINAL SITE. | |
| 06/14/2011 | GRADING - INTERMEDIATE | Continued | PEDESTRIAN ACCESS SIDEWALK FROM ROW DOES NOT MEET SLOPE REQUIREMENTS. SIDEWALK HAS A 7.4% SLOPE WITH A RISE > 6"/NEED HAND RAILING FOR RAMP PER ANSI. SIDEWALK CROSS SLOPE IS >2%/DOES NOT MEET COT DEV STD AND ANSI. |
|
| 06/14/2011 | GRADING - INTERMEDIATE | Continued | MARK EUGLOSKY 444-2883 | |
| 04/20/2011 | GRADING - INTERMEDIATE | Continued | 1) OK FOR CHANGE TO SIDEWALK DISSCUSSED W/ PROPERTY OWNER. 2) OPENING SHOWN IN CONCRETE CURBING @ ISLAND NEXT TO HC PARKING SPACE. 3) ENSURE SLOPE ON PEDESTRIAN ACCESS SIDEWALK OFF OF JIM HOWAED PLACE IS NOT GREAYER THAN 5% - MEASURED 5.3% ON FORMS. NO STORM WATER CONCERNS CALL FOR RE-INSPECTION |
|
| 04/19/2011 | GRADING - INTERMEDIATE | Continued | CONTRACTOR WORKING ON CURBING, CURB OPENINGS, ISLANDS AND DRIVEWAYS. NO STORM WATER CONCERNS AT THIS TIME | |
| 04/04/2011 | GRADING - INTERMEDIATE | Continued | DISCUSSED SITE WORK AND ELEVATIONS FOR PAVING. DISCUSSED STORM WATER ISSUES W/ DRAINAGE CHANNEL ADJACENT TO SOUTH PERIMETER. | |
| 03/23/2011 | GRADING - INTERMEDIATE | Continued | 1) ADD TEMP SEDIMENT CONTROLS ALONG PERIMETER IN THE SOUTHEAST CORNER IN ORDER TO PREVENT DISTURBED SOIL FROM ENTERING THE PUBLIC DRAINAGE WAY. 2) PRIOR TO FINAL APPROVAL ENSURE AN ELEVATION CERT. FOR THE BLDG PAD IS SUBMITTED AND APPROVED BY THE COT. 3) PRIOR TO FINAL APPROVAL ENSURE A BASIN/DRAINAGE CERT STATEMENT FROM THE ENG/ARCH OF RECORD IS SUBMITTED AND APPROVED BY THE COT. 4) CALL FOR INSPECTION PRIOR TO PAVING. 5) CALL FOR INSPECTION FOR ANY SIGNIFICANT CHANGES TO THE APPROVED PLAN. |